States Grants (Advanced Education) Act 1972 (Cth)
An Act relating to the Grant of Financial Assistance to the States in connexion with Advanced Education.
[
BE it enacted by the Queen’s Most Excellent Majesty, the Senate, and the House of Representatives of the Commonwealth of Australia, as follows:—
(2.) The
(3.) The
Principal Act, as amended by this Act, may be cited as the
(
a ) an amount of Five thousand dollars; and(
b ) in addition, an amount calculated by multiplying Thirty dollars by the number of resident students of McGregor College in that year.
(2.) Where McGregor College, or part of McGregor College, was not in use during the whole of the academic year included in a year to which this section applies, the Minister may determine that the amount payable under this section in respect of that year shall be such part only of the amount that would otherwise be payable as the Minister thinks appropriate.
(3.) The financial assistance to the State of Queensland under this section is granted on the conditions that—
(
a )the State will, in respect of each payment of that financial assistance and without undue delay, pay an amount equal to that payment to the body administering McGregor College; and(
b )the State will satisfy itself that, in each year to which this section applies, an amount that is not less than the amount payable under tin’s section in respect of that year has been, or will be, used by the body administering McGregor College for the provision of tutorial assistance to students of, or for meeting administrative costs of, the College.
(4.) An amount of financial assistance to the State of Queensland under this section is granted on the conditions that—
(a) if the Minister informs the Treasurer of the State that he is satisfied that the State has failed to fulfil the conditions applicable to that amount, the State will repay that amount to the Commonwealth; and
(
b )if that amount exceeds the amount properly payable, the State will repay the excess to the Commonwealth.
(5.) The Treasurer may, at such times as he thinks fit, make advances of such amounts as he thinks fit to the State of Queensland on account of an amount that may become payable under this section to the State, and the conditions set out in the last two preceding sub-sections are applicable to any such advance.
(6.) For the purposes of this section, the number of resident students of McGregor College in a year to which this section applies is the number that is the average of the maximum numbers of such students during the several terms of the academic year included in that year.
(7.) In this section, “year to which this section applies” means each of the years One thousand nine hundred and seventy-one and One thousand nine hundred and seventy-two.
THE SCHEDULES
FIRST SCHEDULE Section 3.
Parts to be Inserted in the First Schedule to the Principal Act
Part II.
Grants for Recurrent Expenditure for the Year 1971
First Column | Second Column | Third Column |
College of Advanced Education | Qualifying amount | Maximum grant |
$ | $ | |
New South Wales— | ||
| 648,640 | 350,610 |
| 862,360 | 466,140 |
| 254,780 | 137,720 |
| 75,250 | 40,680 |
| 64,640 | 34,940 |
| 163,870 | 88,580 |
| 79,760 | 43,120 |
| 407,510 | 220,270 |
| 95,730 | 51,740 |
| 30,470 | 16,470 |
| 46,210 | 24,980 |
| 2,840,830 | 1,535,590 |
| 381,200 | 206,050 |
5,951,250 | 3,216,890 | |
Victoria— | ||
| 519,250 | 280,670 |
| 91,570 | 49,500 |
| 920,680 | 497,670 |
| 108,380 | 58,590 |
| 293,590 | 158,690 |
| 649,930 | 351,310 |
| 305,960 | 165,380 |
| 1,017,900 | 550,220 |
| 195,850 | 105,870 |
| 155,470 | 84,040 |
| 334,270 | 180,690 |
| 500,950 | 270,780 |
| 4,261,010 | 2,303,250 |
| 56,200 | 30,380 |
| 1,520,360 | 821,810 |
| 526,980 | 284,860 |
| 227,780 | 123,120 |
| 138,730 | 74,990 |
| 99,550 | 53,810 |
| 234,460 | 126,740 |
| 414,590 | 224,100 |
| 202,390 | 109,400 |
| 256,840 | 138,830 |
13,032,690 | 7,044,700 |
First Schedule—
First Column | Second Column | Third Column |
College of Advanced Education | Qualifying amount | Maximum grant |
$ | $ | |
Queensland— | ||
| 42,590 | 23,020 |
| 567,900 | 306,970 |
| 471,990 | 255,130 |
| 88,480 | 47,820 |
| 1,725,370 | 932,640 |
| 467,460 | 252,680 |
| 214,210 | 115,790 |
3,578,000 | 1,934,050 | |
South Australia— | ||
| 268,090 | 144,910 |
| 99,320 | 53,680 |
| 2,477,700 | 1,339,300 |
| 195,390 | 105,610 |
3,040,500 | 1,643,500 | |
Western Australia— | ||
| 4,934,630 | 2,667,370 |
Tasmania— | ||
| 1,375,160 | 743,330 |
Part III.
Grants for Recurrent Expenditure for the Year 1972
First Column | Second Column | Third Column |
College of Advanced Education | Qualifying amount | Maximum grant |
$ | $ | |
New South Wales— | ||
| 971,800 | 525,300 |
| 1,105,950 | 597,810 |
| 308,400 | 166,710 |
| 96,700 | 52,270 |
| 69,870 | 37,770 |
| 181,150 | 97,920 |
| 280,920 | 151,850 |
| 962,230 | 520,130 |
| 103,180 | 55,770 |
| 32,570 | 17,600 |
| 51,140 | 27,640 |
| 3,351,540 | 1,811,640 |
| 638,680 | 345,240 |
8,154,130 | 4,407,650 | |
Victoria— | ||
| 565,460 | 305,660 |
| 95,810 | 51,790 |
| 1,045,680 | 565,240 |
| 115,280 | 62,310 |
| 310,160 | 167,650 |
| 713,330 | 385,590 |
First Schedule—
First Column | Second Column | Third Column |
College of Advanced Education | Qualifying amount | Maximum grant |
$ | $ | |
Victoria— | ||
| 390,420 | 211,040 |
| 1,146,310 | 619,630 |
| 213,970 | 115,660 |
| 170,470 | 92,150 |
| 365,060 | 197,330 |
| 545,170 | 294,690 |
| 4,632,320 | 2,503,950 |
| 59,540 | 32,190 |
| 1,737,440 | 939,160 |
| 604,970 | 327,010 |
| 252,280 | 136,360 |
| 150,180 | 81,180 |
| 100,450 | 54,290 |
| 239,490 | 129,450 |
| 439,210 | 237,410 |
| 251,870 | 136,140 |
| 112,230 | 60,660 |
14,257,100 | 7,706,540 | |
Queensland— | ||
| 41,430 | 22,400 |
| 754,880 | 408,050 |
| 555,330 | 300,180 |
| 103,050 | 55,700 |
| 1,832,300 | 990,440 |
| 609,110 | 329,250 |
| 181,750 | 98,250 |
4,077,850 | 2,204,270 | |
South Australia— | ||
| 288,210 | 155,790 |
| 107,110 | 57,890 |
| 64,910 | 35,090 |
| 2,847,700 | 1,539,300 |
| 209,670 | 113,330 |
3,517,600 | 1,901,400 | |
Western Australia— | ||
| 5,871,960 | 3,174,040 |
Tasmania— | ||
| 2,010,830 | 1,086,930 |
SECOND SCHEDULE Section 4.
Schedule to be Inserted in the Principal Act
SECOND SCHEDULE Section 5.
Grants for Approved Projects
First Column | Second Column | Third Column |
College of Advanced Education | Work or other matter | Commonwealth contribution |
$ | ||
New South Wales— | ||
| Erection of food technology buildings........................................... | 348,030 |
Completion of residential accommodation..................................... | 43,600 | |
Completion of poultry technology buildings................................. | 15,500 | |
Renovation of residential accommodation..................................... |
96,500 | ||
Alteration to dairy technology buildings....................................... | 16,500 | |
Erection of administration building............................................... | 60,000 | |
Equipment...................................................................................... | 19,250 | |
Other works and services............................................................... | 97,870 | |
| Erection of library.......................................................................... | 465,000 |
Completion of central services building........................................ | 72,500 | |
Erection of residential blocks A and B.......................................... | 350,000 | |
Erection of residential village........................................................ | 350,000 | |
Completion of dining hall and kitchen........................................... | 138,000 | |
Erection of principal’s residence.................................................... | 12,500 | |
Site development............................................................................ | 127,000 | |
Equipment...................................................................................... | 59,500 | |
Other works and services............................................................... | 50,000 | |
| Minor works and services.............................................................. | 10,000 |
| Equipment...................................................................................... | 30,000 |
| Erection of administration building............................................... | 139,750 |
Erection of lecture rooms, laboratories and library........................ | 169,120 | |
Erection of residential accommodation.......................................... | 325,930 | |
| 150,420 | |
Erection of ancillary building........................................................ | 51,800 | |
Equipment...................................................................................... | 32,880 | |
Other works and services............................................................... | 306,350 | |
| Initial development......................................................................... | 65,000 |
| Erection of library and amenities building..................................... | 357,000 |
Equipment...................................................................................... | 15,000 | |
Other works and services............................................................... | 203,000 | |
| Erection of library and administration building............................. | 160,000 |
| Purchase of land............................................................................. | 156,000 |
Erection of first tower building...................................................... | 7,705,000 | |
Erection of second tower building................................................. | 750,000 | |
Erection of library and business administration building.............. | 875,000 | |
Erection of science building on the North Sydney site.................. | 48,000 | |
Alterations to existing buildings.................................................... | 465,000 | |
Equipment...................................................................................... | 250,000 | |
Other works and services............................................................... | 258,500 |
Second Schedule—
First Column | Second Column | Third Column |
College of Advanced Education | Work or other matter | Commonwealth contribution |
$ | ||
New South
Wales— | ||
Wagga Agricultural College | Erection of residential accommodation............................................... | 215,730 |
Extensions to dining room and kitchen............................................... | 113,500 | |
Erection of students union building.................................................... | 76,930 | |
Completion of animal and plant science laboratories......................... | 31,060 | |
Erection of dairy buildings.................................................................. | 41,120 | |
Equipment........................................................................................... | 3,430 | |
Other works and services.................................................................... | 66,730 | |
15,394,000 | ||
Victoria— | ||
| Planning.............................................................................................. | 17,500 |
Erection of applied science building—stage I.................................... | 661,500 | |
Erection of applied science building—stage II................................... | 341,500 | |
Erection of residential accommodation............................................... | 187,500 | |
Equipment........................................................................................... | 131,000 | |
Other works and services.................................................................... | 24,000 | |
| Equipment........................................................................................... | 2,500 |
Other works and services.................................................................... | 57,500 | |
| Purchase of land.................................................................................. | 55,000 |
Planning.............................................................................................. | 21,250 | |
Erection of administration and teaching building............................... | 200,000 | |
Alterations to engineering, physics and art building........................... | 167,000 | |
Equipment........................................................................................... | 306,620 | |
Other works and services.................................................................... | 10,500 | |
Erection of library building................................................................. | 350,000 | |
| Purchase of land.................................................................................. | 20,750 |
Completion of headquarters building.................................................. | 57,530 | |
| Erection of animal physiology laboratory........................................... | 20,000 |
Erection of residence........................................................................... | 8,000 | |
Equipment........................................................................................... | 20,500 | |
| Purchase of land.................................................................................. | 46,000 |
Planning.............................................................................................. | 10,000 | |
Erection of assembly hall and amenities building.............................. | 25,000 | |
Erection of engineering, physics and chemistry building................... | 372,500 | |
Equipment........................................................................................... | 136,000 | |
Other works and services.................................................................... | 44,000 | |
| Site works and buildings..................................................................... | 595,880 |
Equipment........................................................................................... | 23,000 | |
| Planning.............................................................................................. | 10,000 |
Erection of applied science building................................................... | 946,000 | |
Alterations to buildings on the Fenwick Street site | 25,000 | |
Erection of residential building........................................................... | 125,000 | |
Equipment........................................................................................... | 87,630 | |
Other works and services.................................................................... | 47,500 | |
| Erection of animal nutrition buildings................................................ | 17,500 |
Erection of chemistry building............................................................ | 78,000 | |
Equipment........................................................................................... | 11,000 | |
| Equipment........................................................................................... | 4,000 |
Second Schedule—
First Column | Second Column | Third Column |
College of Advanced Education | Work or other matter | Commonwealth contribution |
Victoria— | $ | |
| Purchase of land.................................................................................. | 100,000 |
Planning.............................................................................................. | 25,000 | |
| 248,500 | |
Equipment........................................................................................... | 54,500 | |
Other works and services.................................................................... | 26,500 | |
| Planning.............................................................................................. | 50,000 |
Purchase of property........................................................................... | 141,020 | |
Site works and buildings..................................................................... | 1,133,980 | |
Equipment........................................................................................... | 48,000 | |
| Planning.............................................................................................. | 120,000 |
Erection of north-western building..................................................... | 2,945,500 | |
Conversion of building for medical laboratory technology................ | 86,000 | |
Equipment........................................................................................... | 313,500 | |
Other works and services.................................................................... | 7,500 | |
| Extensions to library........................................................................... | 5,000 |
Equipment........................................................................................... | 9,000 | |
Other works and services.................................................................... | 11,000 | |
| Purchase of land.................................................................................. | 30,000 |
Planning.............................................................................................. | 128,000 | |
Completion of engineering building................................................... | 926,500 | |
Erection of library............................................................................... | 631,500 | |
Alterations to applied science building............................................... | 140,000 | |
Equipment........................................................................................... | 156,500 | |
Other works and services.................................................................... | 5,000 | |
| Planning.............................................................................................. | 10,000 |
Erection of physics and chemistry building........................................ | 370,000 | |
Erection of resource materials building.............................................. | 420,000 | |
Erection of student amenities building................................................ | 140,000 | |
Erection of residential accommodation............................................... | 187,500 | |
Equipment........................................................................................... | 82,250 | |
Other works and services.................................................................... | 60,000 | |
| Planning.............................................................................................. | 25,000 |
Erection of science and nutrition building.......................................... | 100,000 | |
| Equipment........................................................................................... | 6,000 |
| Purchase of land for new college........................................................ | 125,000 |
Equipment and minor works and services.......................................... | 30,500 | |
| Erection of laboratory building and animal house.............................. | 524,750 |
Equipment........................................................................................... | 35,000 | |
| Purchase of land.................................................................................. | 45,000 |
Planning.............................................................................................. | 15,000 | |
Alterations to buildings on the Timor Street site................................ | 39,960 | |
Equipment........................................................................................... | 16,500 | |
Student residential building................................................................ | 58,000 | |
Site preparation—new site.................................................................. | 15,000 | |
|
| 87,880 |
15,000,000 |
Second Schedule—
First Column | Second Column | Third Column |
College of Advanced Education | Work or other matter | Commonwealth contribution |
$ | ||
Queensland— | ||
| Erection of resource materials centre................................................... | 429,500 |
Erection of engineering building—stage 1.......................................... | 140,000 | |
Erection of education and chemistry building..................................... | 422,500 | |
Erection of residential block B............................................................ | 71,500 | |
Erection of arts and crafts building...................................................... | 167,000 | |
Erection of affiliated residential college.............................................. | 200,000 | |
Provision of sporting complex............................................................. | 4,500 | |
Equipment............................................................................................ | 75,000 | |
Other works and services..................................................................... | 35,360 | |
| Erection of agricultural engineering building...................................... | 151,000 |
Erection of food technology building.................................................. | 64,500 | |
Erection of library................................................................................ | 49,000 | |
Erection of residential accommodation................................................ | 272,000 | |
Equipment............................................................................................ | 68,500 | |
| Erection of headquarters building........................................................ | 281,500 |
| Erection of civil engineering building................................................. | 1,120,000 |
Erection of physics-paramedical building........................................... | 714,830 | |
Erection of mechanical engineering building...................................... | 266,320 | |
Provision of sporting facilities............................................................. | 15,000 | |
Equipment............................................................................................ | 278,020 | |
Other works and services..................................................................... | 210,000 | |
| Planning............................................................................................... | 15,000 |
Erection of engineering and education blocks..................................... | 369,490 | |
Equipment for engineering and education buildings........................... | 99,330 | |
Erection of residential block B............................................................ | 73,230 | |
Erection of residential block C............................................................ | 106,500 | |
Equipment for residential blocks......................................................... | 18,600 | |
Erection of arts and crafts building...................................................... | 193,750 | |
Equipment for arts and crafts building................................................ | 15,050 | |
Provision of sporting complex............................................................. | 122,500 | |
Erection of dining room....................................................................... | 55,480 | |
Erection of matron’s residence............................................................ | 3,150 | |
Erection of warden’s lodge.................................................................. | 7,500 | |
Erection of animal house..................................................................... | 29,000 | |
Equipment............................................................................................ | 204,340 | |
Site development.................................................................................. | 9,150 | |
Other works and services..................................................................... | 41,900 | |
6,400,000 | ||
South Australia— | ||
| Purchase of land................................................................................... | 14,500 |
Planning............................................................................................... | 15,500 | |
Erection of residential accommodation................................................ | 183,500 | |
Alterations to amenities buildings....................................................... | 143,000 | |
Equipment............................................................................................ | 37,500 | |
Other works and services..................................................................... | 56,000 | |
| Equipment............................................................................................ | 2,500 |
| Alterations to premises........................................................................ | 5,500 |
Second Schedule—
First Column | Second Column | Third Column |
College of Advanced Education | Work or other matter | Commonwealth contribution |
$ | ||
South
Australia— | ||
| Site works and planning....................................................................... | 493,500 |
Erection of library................................................................................ | 583,250 | |
Erection of engineering buildings........................................................ | 1,609,850 | |
Erection of applied science buildings.................................................. | 1,025,050 | |
Completion of metallurgy building..................................................... |
71,000 | ||
Provision of sporting facilities............................................................. | 92,500 | |
Extension to building on the Whyalla site........................................... | 56,000 | |
Improvements to buildings on North Terrace site............................... | 62,500 | |
Alterations to building on Frome Road site......................................... | 134,930 | |
Equipment............................................................................................ | 340,420 | |
Other works and services..................................................................... | 31,000 | |
| Purchase of land................................................................................... | 85,500 |
Planning............................................................................................... | 5,000 | |
Other works and services..................................................................... | 10,000 | |
| Planning............................................................................................... | 9,000 |
Purchase of land................................................................................... | 10,000 | |
5,077,500 | ||
Western Australia— | ||
| Completion of library.......................................................................... | 967,000 |
Erection of commerce and general studies building............................ | 625,000 | |
Erection of engineering building......................................................... | 260,500 | |
Completion of architecture building.................................................... | 200,000 | |
Erection of biological science building............................................... | 350,000 | |
Erection of computer building............................................................. | 180,000 | |
Extension to physics building.............................................................. | 155,000 | |
Erection of student guild building....................................................... | 125,000 | |
Completion of therapies building on the Shenton Park site................ | 267,500 | |
Erection of Watson lecture theatre....................................................... | 40,000 | |
Provision of sporting facilities............................................................. | 75,000 | |
Planning............................................................................................... | 15,000 | |
| 200,000 | |
Erection of maintenance workshop..................................................... | 152,500 | |
Equipment............................................................................................ | 375,000 | |
Other works and services..................................................................... | 262,500 | |
4,250,000 | ||
Tasmania— | ||
| Completion of resources materials building........................................ | 1,441,120 |
Erection of engineering building......................................................... | 612,260 | |
Erection of building for school of education....................................... | 1,078,120 | |
Erection of residential accommodation................................................ | 78,500 | |
Equipment............................................................................................ | 25,000 | |
Other works and services..................................................................... | 15,000 | |
3,250,000 |
THIRD SCHEDULE Section 7.
Names of Colleges of Advanced Education
First Column | Second Column |
Former name | Present name |
Gippsland Institute of Technology | Gippsland Institute of Advanced Education |
Prahran Technical School | Prahran College of Technology |
Queensland Institute of Colleges | Board of Advanced Education |
Queensland Institute of Technology, Capricornia | The Capricornia Institute of Advanced Education |
Queensland Institute of Technology, Darling Downs | Darling Downs Institute of Advanced Education |
The Emily McPherson College of Domestic Economy | The Emily McPherson College |
The School of Mines and Industries, Ballarat | The Ballarat Institute of Advanced Education |
The Victorian School of Speech Therapy | The Victorian School of Speech Science |
Warrnambool Institute of Technology | Warrnambool Institute of Advanced Education |
0
0
0