Road Traffic (Fees for Vehicle Licences) Regulations 1997 (WA)

Case
No judgment structure available for this case.

2344 GOVERNMENT GAZETTE, WA [13 May 1997
TR303
to these regulations is 1 July 1997.

ROAD TRAFFIC ACT 1974

ROAD TRAFFIC (FEES FOR VEHICLE LICENCES)

REGULATIONS 1997

Made by the Lieutenant-Governor and deputy of the Governor in Executive

Council.

Citation

1.     These regulations may be cited as the Road Traffic (Fees for Vehicle

Licences) Regulations 1997.

Specified day: section 28A

2. For the purposes of section 28A of the Act, the specified day in relation

13 May 19971 GOVERNMENT GAZETTE, WA 2345

Second Schedule amended

3.     (1) Part III of the Second Schedule to the Road Traffic Act 1974* is

amended by deleting Divisions 2 and 3 and substituting the following

Divisions -

Division 2 - Licence fees for vehicles other than family
vehicles and heavy vehicles

Calculation of licence fees

1. The licence fee payable for a vehicle other than a family vehicle or a heavy vehicle for a period of 12 months is calculated in accordance with this Division.

Motor car

2.     (1) For a motor car with an engine other than a rotary type, the

fee is $1.93 per power unit plus $3.70 per 100 kg unit or part thereof of tare weight, subject to a maximum fee payable of $299.95.

(2) For a motor car with a rotary type engine, the fee is $7.00 per

100 kg unit or part thereof of tare weight, subject to a maximum fee payable of $299.95.
Motor wagon, caravan (motor propelled) or tow truck
3. For a motor wagon, caravan (motor propelled) or tow truck -

(a) with tare weight not exceeding 1 600 kg, the fee is $2.32

tare weight; per power unit plus $4.46 per 100 kg unit or part thereof of
(b) with tare weight exceeding 1 600 kg but not exceeding 2 600 kg, the fee is $3.01 per power unit plus -
(i) $99.73 for the first 1 700 kg or part thereof of tare weight; and
(ii) $5.88 for each additional 100 kg unit or part thereof of tare weight,
subject to a maximum fee payable of $299.95;
(c) with tare weight exceeding 2 600 kg but not exceeding 3 100 kg, the fee is $3.70 per power unit plus -
(i) $194.58 for the first 2 700 kg or part thereof of tare

weight; and

(ii) $7.21 for each additional 100 kg unit or part thereof of tare weight,

subject to a maximum fee payable of $299.95;

(d) with tare weight exceeding 3 100 kg but not exceeding 4 500 kg, the fee is $299.95.

Tractor (prime mover type)

4.      For a tractor (prime mover type) -

(a) per power unit plus $4.46 per 100 kg unit or part thereof of with tare weight not exceeding 1 600 kg, the fee is $2.32

tare weight;

with tare weight exceeding 1 600 kg but not exceeding

(b) 2 600 kg, the fee is $3.01 per power unit plus -
(i) $99.73 for the first 1 700 kg or part thereof of tare
weight; and
2346 GOVERNMENT GAZETTE, WA [13 May 1997
(ii) $5.88 for each additional 100 kg unit or part thereof of tare weight;
(c) with tare weight exceeding 2 600 k but not exceeding 3 060 kg, the fee is $3.70 per power unit plus -
(i) $194.58 for the first 2 700 kg or part thereof of tare weight; and
(ii) $7.21 for each additional 100 kg unit or part thereof of tare weight;
(d) with tare weight exceeding 3 060 kg but not exceeding 4 500 kg, the fee is $7.78 per power unit plus -
(i) $511.32 for the first 3 350 kg or part thereof of tare weight; and
(ii) $38.16 for each additional 250 kg unit or part thereof of tare weight,
subject to a maximum fee payable of $799.95.

Omnibus

5.      For an omnibus, the fee is $2.65 per power unit plus -

(a) if the tare weight does not exceed 762 kg - $21.50; or
(b) if the tare weight exceeds 762 kg -
(i) $48.34 for the first 1 016 kg or part thereof of tare weight; and
(ii)
$13.45 for each additional 254 kg unit or part thereof of tare weight.

Motor cycle

6.     (1) For a motor cycle with engine capacity not exceeding

250 cubic centimetres, the fee is $16.13.

centimetres, the fee is $21.01. (2) For a motor cycle with engine capacity exceeding 250 cubic

Motor carrier

7. For a motor carrier the fee is the amount corresponding to the

appropriate range of tare weights in the Table to this item.

Table

Tare Weight Amount
Exceeding Not Exceeding
kg kg $

27.97

- 508
508
762 41.96
762
- 55.97

Caravan (trailer type)

8. For a caravan (trailer type) -
(a) with tare weight not exceeding 2 540 kg, the fee is -

(i)      $11.63 for the first 508 kg or part thereof of tare

weight; and

(ii)     $4.69 for each additional 254 kg unit or part thereof

of tare weight;

13 May 19971 GOVERNMENT GAZETTE, WA 2347

(b) with tare weight exceeding 2 540 kg, the fee is -

(i)      $54.94 for the first 2 794 kg or part thereof of tare

weight; and

(ii)     $5.83 for each additional 254 kg unit or part thereof

of tare weight.

Plant trailer

9.     For a plant trailer, the fee is the amount corresponding to the

appropriate range of tare weights in the Table to this item.

Table

Tare Weight Amount
Exceeding Not Exceeding
kg kg $
- 1 016 11.63
1 016 3 048 34.92
3 048 5 080 69.84

Exceeding 5 080 kg -

for the first 6 486 kg or part thereof ...................$83.72

and for each additional 1 016 kg or part thereof ..........$13.88

Semi-trailer, converter dolly trailer or trailer

10.      For a semi-trailer, converter dolly trailer or trailer, other than a

plant trailer, the fee is the amount corresponding to the appropriate

range of tare weights in the Table to this item.

Table

Tare Weight Amount
Exceeding Not Exceeding
kg kg $
- 508 11.63
508 762 21.01
762 1 016 32.68
1 016 1 270 62.89
1 270 1 524 128.02
1 524 1 778 144.34
1 778 2040 169.85
2040 2 286 345.06

Exceeding 2 286 kg but not exceeding 4 500 kg -

for the first 2 540 kg or part thereof ..................$390.07

and for each additional 254 kg or part thereof ............$45.01

Tractor

11.     For a tractor (other than prime mover type) - (a) with tare weight not exceeding 2 794 kg, the fee is -

(i) $55.98 for the first 762 kg or part thereof of tare weight; and
(ii)
$16.33 for each additional 254 kg unit or part thereof of tare weight;

(b) with tare weight exceeding 2 794 kg, the fee is -

(i) $205.16 for the first 3 048 kg or part thereof of tare
weight; and
2348 GOVERNMENT GAZETTE, WA [13 May 1997
(ii) $18.55 for each additional 254 kg unit or part thereof of tare weight.

Tractor plant, fork lift truck or tow motor

12.     For a tractor plant, fork lift truck or tow motor, the fee is $4.31

per 254 kg unit or part thereof of tare weight.

Mobile crane

13.     For a mobile crane -

(a) where the owner lodges a statutory declaration that the

crane will not be used or let for hire and will not be used on

behalf of any person other than the owner the fee is $4.31 per 254 kg unit or part thereof of tare weight;
(b) where a crane is used or let for hire or is used to perform

work on behalf of any person other than the owner the fee

is $8.62 per 254 kg unit or part thereof of tare weight.

Division 3 - Licence fees for family vehicles

Calculation of licence fees

1.     The licence fee for a family vehicle for a period of 12 months is

calculated in accordance with items 2 and 3 of this Division.

Motor car

2.     (1) For a motor car with an engine other than a rotary type, the

fee is $1.79 per power unit plus $3.44 per 100 kg unit or part thereof of

tare weight.

100 kg unit or part thereof of tare weight. (2) For a motor car with a rotary engine, the fee is $6.52 per
Motor wagon or caravan (motor propelled)

3.     For a motor wagon or caravan (motor propelled) -

(a) with a tare weight not exceeding 1 600 kg, the fee is $2.15 per power unit plus $4.16 per 100 kg unit or part thereof of

tare weight;

(b) with a tare weight exceeding 1 600 kg but not exceeding 2 600 kg, the fee is $2.81 per power unit plus -
(i) $92.95 for the first 1 700 kg or part thereof of tare weight; and
(ii) $5.48 for each additional 100 kg unit or part thereof

of tare weight;

(c) with a tare weight exceeding 2 600 kg but not exceeding 3 100 kg, the fee is $3.44 per power unit plus -
(i) $181.36 for the first 2 700 kg or part thereof of tare
weight; and
(ii) $6.72 for each additional 100 kg unit or part thereof of tare weight.
13 May 1997] GOVERNMENT GAZETTE, WA 2349

(2) Part III of the Second Schedule to the Road Traffic Act 1974 is

amended in Division 4 —

in items 3, 4 and 5, by deleting "subitem." and substituting the

(a) following —

" item. "; and

(b) in item 4, by inserting after "motor wagon" the following .-

4C , caravan (motor propelled) or tow truck ".

[* Reprinted as at 1 June 1995.

For subsequent amendments to the Second Schedule see Act No. 76 of 1996 and Gazette 24 May and 17 December 1996.]

By Command of the Lieutenant-Governor and deputy of the Governor,

J. PRITCHARD, Clerk of the Executive Council.

Actions
Download as PDF Download as Word Document


Cases Citing This Decision

0

Cases Cited

0

Statutory Material Cited

0