Railway (Tilley to Karara) Act 2010The Parliament of Western Australia enacts as follows:
This is the
This Act comes into operation on the day on which it receives the Royal Assent.
A railway, with all necessary, proper and usual works and facilities in connection with the railway, may be constructed and maintained along the line described in Schedule 1.
In this Part —
This Part applies if the Public Transport Authority enters into a contract or arrangement with another person (the
For the purposes of the construction of the railway, the
For the purposes of the construction of the railway, the
[s. 3]
1. The Tilley to Karara railway commences about 336.5 kilometres along the Avon Yard to Mullewa Railway line at point 1 in the sequence specified in the Table then continues, generally in an easterly or south‑easterly direction, along a straight line between each of the points in the sequence, and terminates at point 10, about 74 kilometres from point 1.
1 | 404000 | 6773000 |
2 | 418900 | 6773000 |
3 | 420000 | 6773700 |
4 | 423803 | 6774160 |
5 | 428775 | 6770355 |
6 | 443240 | 6770410 |
7 | 450215 | 6772010 |
8 | 467440 | 6771655 |
9 | 471475 | 6772630 |
10 | 474220 | 6771125 |
2. The course to be taken by the railway is shown as a red line on Public Transport Authority Plan 17‑C‑15‑1001.
Note for this Schedule:
Coordinate references are to Map Grid of Australia 1994 grid coordinates in Zone 50 of the Universal Transverse Mercator Grid System based on the Geocentric Datum of Australia.
This is a compilation of the
25 of 2010 | 7 Jul 2010 | 7 Jul 2010 (see s. 2) | |
27 of 2021 | 22 Dec 2021 | 1 Jul 2023 (see s. 2(e) and SL 2023/40 cl. 2(b)) | |
23 of 2023 | 24 Oct 2023 | 15 Nov 2023 (see s. 2(d) and SL 2023/161 cl. 2) |
construction of the railway............................................................................................. 5
contractor........................................................................................................................... 5
proposal............................................................................................................................. 4
Public Transport Authority............................................................................................ 4
specified............................................................................................................................. 4
0
0
0