Rail Safety Regulations 2010 (TAS)
Rail Safety Regulations 2010
I, the Governor in and over the State of Tasmania and its Dependencies in the Commonwealth of Australia, acting with the advice of the Executive Council, make the following regulations under the Rail Safety Act 2009 .8 November 2010
PETER G. UNDERWOOD
Governor
By His Excellency’s Command,
LARA GIDDINGS
Minister for Infrastructure
1. | A decision to design or construct, or to commission the design or construction of, rolling stock or new railway tracks | As soon as reasonably practicable after the decision is made |
2. | The introduction into service of rolling stock of a type not previously operated by the operator, or the re-introduction into service of rolling stock not currently operated by the operator | At least 28 days before the date on which the operator intends to introduce or re-introduce the rolling stock into service |
3. | A change to a safety- critical element of existing rolling stock | At least 28 days before the date on which the operator intends to bring the change into operation |
4. | A change to one or more of the classes of rail infrastructure used in the operator’s accredited operations | At least 28 days before the date on which the operator intends to introduce the new class of rail infrastructure into service |
5. | A change to a safety standard for the design of rail infrastructure or rolling stock | At least 28 days before the date on which the operator intends to adopt the change |
6. | The decision to adopt a new safety standard for the design of rail infrastructure or rolling stock | At least 28 days before the date on which the operator intends to adopt the new standard |
7. | A change to the frequency or procedures for the inspection or maintenance of railway infrastructure or rolling stock | At least 28 days before the date on which the operator intends to bring the change into effect |
8. | A change to any safe- working system rule or procedure relating to the conduct of the operator’s railway operations | At least 28 days before the date on which the operator intends to bring the change into effect |
9. | A decision to introduce a new safe-working system rule or procedure relating to the conduct of the operator’s railway operations | As soon as is reasonably practicable after the decision is made |
10. | The replacement of the person, nominated in the safety management system as the contact person for dealing with queries in relation to the safety management system of the operator, with another person | As soon as is reasonably practicable after it is known the replacement will occur |
Regulation 9(a)
Displayed and numbered in accordance with the
Notified in the
These regulations are administered in the Department of Infrastructure, Energy and Resources.