Petroleum Search Subsidy Regulations (Cth)
Statutory Rules 1964,
No. 119.
(
a )a class of operations specified in column 1 of the table in the First Schedule to these Regulations is a prescribed class of operations; and(
b )the part specified in column 2 of that table opposite to a prescribed class of operations in column 1 is prescribed in relation to that class.
(
a )the scale of rates set out in the Second Schedule to these Regulations is the prescribed scale with respect to stratigraphic drilling; and(
b )the scale of rates set out in the Third Schedule to these Regulations is the prescribed scale with respect to test drilling.
(2.) Each amount set out in the Second and Third Schedules to these Regulations is the amount of subsidy per foot that is applicable to so much of the footage of a hole in relation to which the relevant Schedule applies as—
(
(
b )is included in the portion of the hole that commences at the depth specified in the first column of the relevant Schedule opposite to that amount and extends—(i) to the depth specified in the second column of the relevant Schedule opposite to that amount; or
(ii) where the depth of the hole is less than the depth so specified in that second column, or where no depth is so specified in that second column—to the depth to which the hole has been drilled.
(
THE SCHEDULES.
FIRST SCHEDULE.
Regulation 4.
Relation of Subsidy to Costs.
Column 1. | Column 2. |
Class of operations. | Part. |
Geophysical survey........................................................................................... ot | Three-tenths |
Test drilling........................................................................................... | Three-tenths |
Stratigraphic drilling........................................................................................... | Four-tenths |
SECOND SCHEDULE.
Regulation
5 (
Subsidy for
Stratigraphic Drilling.
Depths. | Rate of subsidy per foot. | |||||||
From. | To. | Drilled. | Drilled and Cored. | |||||
£ | £ | |||||||
0 | 1,000 | 1 | 10 | 0 | 3 | 0 | 0 | |
1,000 | 2,000 | 1 | 12 | 0 | 3 | 4 | 0 | |
2,000 | 3,000 | 1 | 16 | 0 | 3 | 12 | 0 | |
3,000 | 4,000 | 2 | 2 | 0 | 4 | 4 | 0 | |
4,000 | 5,000 | 2 | 12 | 0 | 5 | 4 | 0 | |
5,000 | 6,000 | 3 | 6 | 0 | 6 | 12 | 0 | |
6,000 | 7,000 | 4 | 2 | 0 | 8 | 4 | 0 | |
7,000 | 8,000 | 2 | 0 | 10 | 4 | 0 | ||
8,000 | 9,000 | 6 | 4 | 0 | 12 | 8 | 0 | |
9,000 | 10,000 | 7 | 8 | 0 | 14 | 16 | 0 | |
10,000 | 11,000 | 8 | 14 | 0 | 17 | 8 | 0 | |
11,000 | 12,000 | 10 | 2 | 0 | 20 | 4 | 0 | |
12,000 | 13,000 | 11 | 12 | 0 | 23 | 4 | 0 | |
13,000 | 14,000 | 13 | 4 | 0 | 26 | 8 | 0 | |
14,000 | .. | 14 | 18 | 0 | 29 | 16 | 0 | |
THIRD SCHEDULE.
Regulation
5 (
Subsidy for
Test Drilling.
Depths. | Rate of subsidy per foot. | ||||||
From. | To. | Drilled. | Drilled and Cored. | ||||
£ | £ | ||||||
0 | 1,000 | 18 | 0 | 1 | 16 | 0 | |
1,000 | 2,000 | 1 | 0 | 0 | 2 | 0 | 0 |
2,000 | 3,000 | 1 | 2 | 0 | 2 | 4 | 0 |
3,000 | 4,000 | 1 | 6 | 0 | 2 | 12 | 0 |
4,000 | 5,000 | 1 | 14 | 0 | 3 | 8 | 0 |
5,000 | 6,000 | 2 | 4 | 0 | 4 | 8 | 0 |
6,000 | 7,000 | 2 | 16 | 0 | 5 | 12 | 0 |
7,000 | 8,000 | 3 | 12 | 0 | 7 | 4 | 0 |
8,000 | 9,000 | 4 | 10 | 0 | 9 | 0 | 0 |
9,000 | 10,000 | 5 | 10 | 0 | 11 | 0 | 0 |
10,000 | 11,000 | 6 | 12 | 0 | 13 | 4 | 0 |
11,000 | 12,000 | 7 | 16 | 0 | 15 | 12 | 0 |
12,000 | 13,000 | 9 | 2 | 0 | 18 | 4 | 0 |
13,000 | 14,000 | 10 | 10 | 0 | 21 | 0 | 0 |
14,000 | .. | 12 | 0 | 0 | 24 | 0 | 0 |
0
0
0