PDE Investments No 8 Pty Ltd v Manly Council

Link copied
Case Copied 25 min read

Land and Environment Court


of New South Wales


CITATION: PDE Investments No 8 Pty Ltd v Manly Council [2004] NSWLEC 355
PARTIES:

APPLICANT
PDE Investments No 8 Pty Ltd

RESPONDENT
Manly Council
FILE NUMBER(S): 10322 of 2004
CORAM: Tuor C.
KEY ISSUES: Development Application :- Residential Flat Building
Planning Principle: Floor Space Ratio and Building Envelope
Bulk of building
Impact on privacy
Impact on heritage significance of item in the vicinity
LEGISLATION CITED: State Environmental Planning Policy No 65 - Design Quality of Residential Development
Manly Local Environmental Plan 1998
CASES CITED:
DATES OF HEARING: 16-17/06/2004
DATE OF JUDGMENT: 07/06/2004
LEGAL REPRESENTATIVES:


APPLICANT
Mr I Hemmings, Barrister
Solicitors
Wiltshire Webb

RESPONDENT
Mr S Griffiths
Solicitors
Pike Pike and Fenwick



JUDGMENT:

IN THE LAND AND


ENVIRONMENT COURT


OF NEW SOUTH WALES

                          10322 of 2004

                          Tuor C

                          6 July 2004
PDE INVESTMENTS No 8 PTY LTD
                                  Applicant
      v
MANLY COUNCIL
                                  Respondent
Judgment

      Introduction

1 This an appeal against the refusal by Manly Council (the council) of a development application (106/03) to demolish two existing buildings and construct a residential flat building with basement car parking at 76-78 North Steyne, Manly.


      The site and it context

2 The site is located opposite the beachfront promenade at Manly, between Steinton and Carlton Streets. It has an eastern frontage that is angled to North Steyne and a western frontage to Whistler Street both of about 23m and a depth of about 38m along its northern boundary and 44.5m along its southern boundary with an area of 924.7sqm. The site contains two allotments (being lot 3 and 4 DP10218) which both contain two early twentieth century residential flat buildings with 12 apartments and no off street parking.

3 Adjoining development to the south and north is a four and five storey residential flat buildings respectively. Although similar in height they are different in style and the expression of the upper most storey, their setbacks to North Steyne and corner location.

4 Other development along North Steyne is mixed, but predominantly three storey apartment buildings of different periods. There are also three multi storey developments further to the south of the site that range from 8 to 14 storeys. These buildings are uncharacteristic of the area and are of a scale that the current planning controls do not seek to emulate. The area is undergoing change and a number of recent buildings have been or are being constructed which are four storeys with additional accommodation in a roof form or secondary structure.

5 Development to the rear of the site along Whistler Street is generally lower is scale being a mixture of dwelling houses and three storey residential flat buildings of different styles.

6 The landscape character of the area is generally urban with little planting. The Norfolk Island Pines along the beach are a significant landscape element.


      Background

7 The development application was lodged on 5 March 2003 and was notified to adjoining residents. One objection was received on behalf of the adjoining property at 75…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read PDE Investments No 8 Pty Ltd v Manly Council and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details
Case
[2004] NSWLEC 355
Decision Date

CaseChat Overview and Summary

The case of PDE Investments No 8 Pty Ltd v Manly Council involved a challenge by the applicant, PDE Investments No 8 Pty Ltd, against the decision of the Manly Council to refuse a development application for the demolition of existing buildings on a site at 76-78 North Steyne, Manly, and the construction of a five-storey residential flat building. The Land and Environment Court of New South Wales was tasked with determining whether the Council's refusal was justified. The key issues centered around compliance with planning controls, particularly the Floor Space Ratio (FSR) and building envelope, as well as the impact on the privacy and heritage significance of the nearby Ocean Beach reserve.

The Court found that the proposed development did not comply with the planning controls in several respects. Firstly, regarding the building envelope, the Court agreed with the Council's expert that the proposed development exceeded the required setbacks and wall heights, resulting in additional bulk that was inconsistent with the streetscape. The Court also held that the balconies on the upper levels added to the bulk and did not comply with the setback requirements. Secondly, concerning the FSR, the Court determined that the proposal exceeded the maximum allowable FSR, resulting in a building of greater bulk than permitted by the planning controls. The Court noted that while the applicant argued that the objectives of the FSR control were met, the Court found that the proposal did not comply with the FSR objectives, particularly in relation to privacy and overshadowing. Finally, regarding heritage impact, the Court found that the bulk and setback of the proposal would not provide a consistent backdrop for the Ocean Beach reserve and could impact its heritage significance if emulated by other developments.

Based on these findings, the Court dismissed the appeal and upheld the Council's decision to refuse the development application. The Court emphasized that planning controls should be adhered to in order to maintain the character of the area and protect the amenity of adjoining properties. The proposal, with its excessive bulk and non-compliance with planning controls, did not meet these objectives and therefore could not be approved.