Part 101 Manual of Standards (Extensions of Time Due to COVID-19) Amendment Instrument 2020 (No. 1) (Cth)
I, SHANE PATRICK CARMODY, Director of Aviation Safety, on behalf of CASA, make this instrument under regulation 101.028 of the Civil Aviation Safety Regulations 1998.
[Signed S. Carmody]
Shane Carmody
Director of Aviation Safety
2 April 2020
Part 101 Manual of Standards (Extensions of Time Due to COVID-19) Amendment Instrument 2020 (No. 1)
1 Name of instrument
This instrument is the Part 101 Manual of Standards (Extensions of Time Due to COVID-19) Amendment Instrument 2020 (No. 1).
2 Commencement
This instrument commences on the day it is registered.
3 Amendment of the Part 101 Manual of Standards
Schedule 1 amends the Part 101 (Unmanned Aircraft and Rockets) Manual of Standards 2019.
Schedule 1 Amendments
[1] Section 1.03
repeal and substitute
1.03 Provisions which take effect later than on commencement
A provision of this MOS mentioned in column 1 of an item in the following Table takes effect on the day mentioned in column 2 for the item.
| Item | This provision: (Column 1) | Takes effect on: (Column 2) |
| 1 | Chapter 2 | 10 October 2020 |
| 2 | Chapter 4 | 10 April 2020 |
| 3 | Chapter 9, except Division 9.2 | 10 April 2020 |
| 4 | Chapter 10, except Divisions 10.1 and 10. 4 | 10 October 2020 |
Note 1 Each item in this Table sets out the date on which the corresponding relevant provisions of this MOS take effect.
Note 2 Chapters 1 and 5, Division 9.2 of Chapter 9, Divisions 10.1 and 10.4 of Chapter 10, and Chapter 11 took effect on 10 April 2019, the day after registration of this MOS. Chapters 3, 6, 7 and 8 are reserved.
0
0
0