Pacific National Pty Ltd v Aurizon Network Pty Ltd

Link copied
Case Copied 27 min read

SUPREME COURT OF QUEENSLAND

CITATION:

Pacific National Pty Ltd v Aurizon Network Pty Ltd [2016] QSC 218

PARTIES:

PACIFIC NATIONAL PTY LTD ACN 098 060 550

(plaintiff)

v

AURIZON NETWORK PTY LTD ACN 132 181 116

(defendant)

FILE NO:

BS7967/14

DIVISION:

Trial Division

PROCEEDING:

Application

DELIVERED ON:

12 September 2016

DELIVERED AT:

Brisbane

HEARING DATE:

Delivered Ex Tempore on 12 September 2014

JUDGE:

Jackson J

ORDER:

The order of the court is that:

1.    The application is dismissed.

2.    The plaintiff pay the defendant’s costs of the application.

CATCHWORDS:

LIMITATION OF ACTIONS – GENERAL MATTERS – AMENDMENT OF ORIGINATING PROCESSES AND PLEADINGS OUTSIDE LIMITATION PERIOD – AMENDMENTS INTRODUCING NEW CAUSE OF ACTION OR PARTICULARISING CAUSE OF ACTION – where the defendant managed rail transport infrastructure and the plaintiff contracted to access the network – where there was damage to the track after flooding rains and the plaintiff’s train was derailed – where the plaintiff’s pleaded causes of action were breach of contract or negligence by, inter alia, failing to properly and safely maintain the network and ensure safe management – where the plaintiff applied for leave to amend the statement of claim after the limitation period expired – where new causes of action alleged breaches of contract or negligence by, inter alia, failing to inspect or assess the track on particular days and prior to the wet season – where the new causes of action alleged that a direction by the defendant to proceed on the track was misleading or deceptive in contravention of s 52 of the Trade Practices Act 1974 (Cth) – whether the new causes of action arose out of the same facts or substantially the same facts

Civil Proceedings Act 2011 (Qld), s 16
Limitation of Actions Act 1974 (Qld), s 10(1)(a)
Rules of the Supreme Court 1900 (Qld), O 32 r 1(5)
Trade Practices Act 1974 (Cth), s 52, s 82

Uniform Civil Procedure Rules 1999 (Qld), r 5, r 376

Commonwealth v Cornwell (2007) 229 CLR 519; [2007] HCA 16, applied
Draney v Barry [2002] 1 Qd R 145; [1999] QCA 491, cited
Gould v Johnson (1702) 2 Salk 422; 91 ER 367, applied
Wardley Australia Ltd v Western Australia (1992) 175 CLR 514; [1992] HCA 55, applied

Weldon v Neal (1887) 19 QBD 394, cited

COUNSEL:

R Anderson QC for the plaintiff

R Derrington QC and D Butler for the defendant

SOLICITORS:

Schweikert Harris for the plaintiff

McInnes Wilson Lawyers for the defendant

  1. Jackson J: On 1 and 2 February 2010, there were flooding rains in central Queensland, including on the Blackwater railway line from Wycarbah to Warren. 

  1. At approximately 1:45 am at a point 33.092 kilometres along that line, a train owned and operated by the plaintiff was derailed and damaged.  The loss suffered as a result of the damage is alleged to have been about $4 million.  The defendant was the manager of the rail network infrastructure on which the train was…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Pacific National Pty Ltd v Aurizon Network Pty Ltd and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details
Case
[2016] QSC 218
Decision Date

CaseChat Overview and Summary

In the matter of Pacific National Pty Ltd versus Aurizon Network Pty Ltd, the plaintiff, a rail freight operator, sought to amend its statement of claim after the limitation period had expired. The plaintiff alleged that the defendant, a rail infrastructure manager, breached its contractual and tortious obligations by failing to maintain the rail network safely, which resulted in the derailment of the plaintiff’s train following heavy rainfall and flooding. The plaintiff sought to introduce new causes of action, alleging breaches of contract and negligence related to the failure to inspect or assess the track on specific days and before the wet season. Additionally, the plaintiff claimed that a direction by the defendant to proceed on the track was misleading or deceptive, in contravention of section 52 of the Trade Practices Act 1974 (Cth).

The court was required to determine whether the new causes of action introduced by the plaintiff were permissible under the law. Specifically, the court had to consider whether the new causes of action arose out of the same facts or substantially the same facts as those pleaded in the original statement of claim. The court also needed to decide if the amendments introduced new causes of action that were not merely variations of the original claims.

The court found that the new causes of action introduced by the plaintiff were not permissible because they introduced new factual allegations that were not part of the original claim. The court held that the amendments sought to introduce new causes of action which were not based on the same facts as the original claims. Consequently, the plaintiff's application for leave to amend the statement of claim was dismissed. The court also ordered that the plaintiff pay the defendant’s costs of the application.

Orders

Orders of the court

The order of the court is that:

1. The application is dismissed.

2. The plaintiff pay the defendant’s costs of the application.

Background

Background to the litigation

Full text does not contain this section.

Evidence

Evidence Before The Court

Full text does not contain this section.

Decision

Reasons for decision

Full text does not contain this section.

Ratio Decidendi

Legal Principle Established

Full text does not contain this section.