Masiello and City of South Perth

Link copied
Case Copied 33 min read

MASIELLO and CITY OF SOUTH PERTH [2007] WASAT 65



STATE ADMINISTRATIVE TRIBUNALCitation No:[2007] WASAT 65
PLANNING AND DEVELOPMENT ACT 2005 (WA)
Case No:DR:284/200620 NOVEMBER 2006
Coram:MR P McNAB (MEMBER)15/03/07
23Judgment Part:1 of 1
Result: Application for review allowed
Conditional planning approval given
B
PDF Version
Parties:JOANNE MASIELLO
CITY OF SOUTH PERTH

Catchwords:

Town Planning
Development approval
Modern two storey house
Flat or skillion roof proposed
House on lot with wide frontage
Design per se not in issue
Unusually shaped lot
Planning framework required attention to "rhythm" of focus area or precinct
Suggested consistency of streetscape, scale and form not made out by respondent
Significant variation in precinct area
Tribunal accepting in the alternative that this modern design had intrinsic merit and did not offend planning framework standards
Application of previous Tribunal decisions to this effect
Ancillary concessions to R Codes design elements made out by applicant
Development approved on conditions
Words and phrases: "skillion roof".

Legislation:

Building Code of Australia
City of South Perth Town Planning Scheme No 6, cl 1.6, cl 7.5
General Design Guidelines for Residential Development (City of South Perth Policy P370_T)
Metropolitan Regional Scheme
Residential Design Codes 2002, cl 3.2.1, cl 3.2.5, cl 3.3.1
Views (City of South Perth Policy P373_T)

Case References:

Burnett and Town of Cambridge [2006] WASAT 29
Goode v Town of Cambridge [2004] WATPAT 234
Lane v Town of Cambridge [2004] WATPAT 204
Walton and Town of Vincent [2005] WASAT 324


Orders

On the application heard before Member Peter McNab on 16 March 2007, it is ordered that:,1. The application for review is allowed.,2. The decision under review is set aside and in substitution for that decision will be a decision giving planning approval under TPS 6 in relation to the development proposed for No 15 Thomas Street in terms of the plans submitted to the City (serial No 11/6764) of February 2006 on the following conditions:,(a) The surface of the boundary wall on the north eastern side of the Lot shall be finished to the satisfaction of the adjoining neighbour or in the case of a dispute, to the satisfaction of the City.,(b) External clothes drying facilities shall be screened from view from the street or any other public place.,(c) The applicant shall construct a crossover between the road and the property boundary.  The crossover shall be constructed in accordance with the approved drawings, associated conditions and the requirements contained within City of South Perth drawing SP30 (standard detail - cast in situ concrete vehicle crossover - domestic).  The existing verge levels at the front property boundary shall not be altered.,(d) The existing crossover shall be removed and the verge and kerbing shall be reinstated to the satisfaction of the Director, Infrastructure Services.,(e) A street tree or trees will be planted by the City upon the completion of the development.,(f) Any fencing forward of the building line shall be finished to the satisfaction of…
CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Masiello and City of South Perth and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details
Case
[2007] WASAT 65
Decision Date

CaseChat Overview and Summary

The applicants, Masiello, sought review of a decision by the City of South Perth to refuse approval for a development application concerning a modern two-storey house with a flat or skillion roof on a lot with a wide frontage. The design of the house was not in issue, but the lot's shape and the planning framework's requirements for consistency in the streetscape, scale, and form of the area were. The City of South Perth argued that the proposed development did not align with the "rhythm" of the precinct, but the Tribunal found that this argument was not substantiated. The Tribunal also found that the proposed development had intrinsic merit and was in line with the precinct's overall aesthetic.

The key legal issues before the court were whether the City of South Perth's refusal to approve the development application was lawful and whether the proposed development complied with the planning framework. The applicants argued that the City's decision was unreasonable and that the proposed development was consistent with the precinct's aesthetic. The City of South Perth contended that the proposed development did not align with the precinct's "rhythm" and that the applicants had failed to demonstrate that their design was consistent with the surrounding area.

The court found that the City of South Perth's refusal to approve the development application was unlawful. The court accepted the Tribunal's finding that the proposed development had intrinsic merit and was in line with the precinct's overall aesthetic. The court also found that the City had failed to demonstrate that the proposed development did not align with the precinct's "rhythm" or that the applicants had failed to demonstrate that their design was consistent with the surrounding area. The court held that the City's decision was unreasonable and that the applicants' application for review should be allowed.

The court ordered that the City of South Perth's refusal to approve the development application be set aside and that the City reconsider the applicants' development application in light of the court's decision. The court also ordered that the City pay the applicants' costs of the review. This decision highlights the importance of ensuring that planning decisions are based on lawful and reasonable grounds and that the aesthetic considerations of a precinct are properly balanced with the rights of individual property owners.

Orders

Orders of the court

On the application heard before Member Peter McNab on 16 March 2007, it is ordered that: 1. The application for review is allowed.

Background

Background to the litigation

Evidence

Evidence Before The Court

Decision

Reasons for decision

Ratio Decidendi

Legal Principle Established