Highways (Port River Expressway Project) Regulations 2004 (SA)

Case
No judgment structure available for this case.

South Australia

Highways (Port River Expressway Project) Regulations 2004

under the Highways Act 1926

1Short title

These regulations may be cited as the Highways (Port River Expressway Project) Regulations 2004.

3Interpretation

In these regulations—

Act means the Highways Act 1926;

Expressway means the transport infrastructure to be known as the Port River Expressway, the design and construction of which forms part of the Port River Expressway Project;

Project means the Port River Expressway Project.

4Port River Expressway Project
  1. (1)

    Particulars of the principal features of the Port River Expressway Project are contained in Schedule 1 as follows:

    1. (a)

      the principal features of Stage 2 of the Project are contained in Part 1 of Schedule 1;

    2. (b)

      the principal features of Stage 3 of the Project are contained in Part 2 of Schedule 1;

    3. (c)

      the authorisations and declarations for the closure of roads and government railway lines under section 39G of the Act, and the obstruction of navigation under section 39H of the Act, for the implementation of Stages 2 and 3 of the Project are contained in Part 3 of Schedule 1;

    4. (d)

      Figure 1 showing the concept design for Stages 2 and 3 of the Project is set out in Part 4 of Schedule 1.

  2. (2)

    The land to which the Port River Expressway Project applies is the area of land bounded by the bold black line connecting the coordinate points shown in Figures 2 to 5 in Schedule 2.

5Responsibility for carrying out Port River Expressway Project

The responsibility for carrying out the Port River Expressway Project is assigned to the Commissioner.

Schedule 1—Principal features of Port River Expressway Project

Part 1—Stage 2 of the Project

Division 1—Connector

1—Francis Street

  1. (1)

    Francis Street will be reconstructed and widened to 4 lanes between Evans Street and Ocean Steamers Road.

  2. (2)

    A 4-way controlled intersection will be constructed at the junction of Francis Street with the Eastern Bypass to the south and Grand Trunkway Extension to the north, connecting Francis Street to St Vincent Street East, Bedford Street and Eastern Parade.

2—Eastern Bypass

  1. (1)

    The Eastern Bypass will be constructed along a disused rail reserve between Francis Street and Bedford Street to enable traffic travelling in a westerly direction along the Expressway to exit the Expressway via the Eastern Bypass and St Vincent Street East.

  2. (2)

    St Vincent Street East will be reconstructed and the intersection of St Vincent Street, Ocean Steamers Road and St Vincent Street East will be modified to allow continuous movement between St Vincent Street and St Vincent Street East.

  3. (3)

    Ocean Steamers Road will be severed by approaches to both the new road and rail bridges. Access to Francis Street from Ocean Steamers Road from the north or south will be closed. Local access will be provided to the sheds on Francis Street and businesses on Santo Parade via Ocean Steamers Road (south). A stub on Ocean Steamers Road (south) will provide access to the southern parcel of land adjacent to Dock 1.

3—Grand Trunkway Extension

  1. (1)

    Grand Trunkway Extension will be constructed to replace the Ocean Steamers Road link that is to be closed.

  2. (2)

    A new 4-way controlled intersection will be constructed at the junction of Grand Trunkway, Eastern Parade and Grand Trunkway Extension. Eastern Parade will be realigned south to a position that will enable the existing rail track crossing Eastern Parade to pass through the centre of this new intersection.

Division 2—Road bridge

4—Road bridge

  1. (1)

    A road bridge across the Port River (downriver from the Birkenhead Bridge) will be constructed with minimum clearance above the shipping channel to AHD 10.0 (10 metres above Mean Sea Level) with a nominal 30 metre opening span and fendering for river traffic.

  2. (2)

    The road bridge works will commence from the former junction of Francis Street and Ocean Steamers Road.

  3. (3)

    The road bridge western approach will form a T-junction with the extension of Nelson Street (Birkenhead Bridge). West of Nelson Street, the Expressway Road Bridge will connect to the existing Victoria Road.

  4. (4)

    The junction of Nelson Street and Semaphore Road will be realigned to the east to allow for the connection of Nelson Street to the Expressway. The existing freight rail crossing at Nelson Street will become redundant and be removed.

Division 3—Associated works

5—Associated works

  1. (1)

    A bridge/traffic control centre and car park will be built between the road and rail bridges on the east side of the river crossing to provide service for the operation of the 2 bridges.

  2. (3)

    The following improvements will be required:

    1. (a)

      improvements to the following junctions:

      1. (i)

        Ocean Steamers Road and St Vincent Street;

      2. (ii)

        Bedford Street and Wilkins Road;

      3. (iii)

        Elder Road and Wills Street;

      4. (iv)

        Santo Parade and Ocean Steamers Road;

    2. (b)

      alignment improvements for Wilkins Road adjacent to Heini Becker Park.

Division 4—Maintenance and operation

5A—Maintenance and operation of road bridge

Maintenance and operation of the road bridge and its associated works will be carried out after completion of the bridge and associated works.

Part 2—Stage 3

Division 1—Rail bridge

6—Main rail line to Outer Harbor

  1. (1)

    A new switch will transfer the main rail line to Outer Harbor along the northern boundary of Symons and Clark Transport Pty Ltd.

  2. (2)

    The track will cross the proposed Grand Trunkway Extension (where a rail crossing will be installed), travel through Incitec Pivot site and cross Ocean Steamers Road.

  3. (3)

    The structure of the rail bridge across the Port River will begin approximately 100 metres east of Ocean Steamers Road and be constructed with minimum clearance above the shipping channel of AHD 10.0 (10 metres above Mean Sea Level) with a nominal 30 metre opening span and fendering for river traffic.

  4. (4)

    On the western side of the river, the rail bridge structure will extend to a point approximately where the rail runs parallel to Elder Road.

  5. (5)

    As a result of the rail track being above the existing surface level of Stirling Street, minor modifications will be required to raise and upgrade the intersection of Stirling Street and Elder Street to provide priority access for road trains to Stirling Street.

  6. (6)

    An emergency de-railer will be installed in the vicinity of Stirling Street consisting of a length of at grade track parallel to the main rail line. In an emergency situation, a train will run along the length of the de-railer line until stopping in the ground beyond the track. The de-railer will provide the means to avoid an incident occurring on the rail bridge structure, particularly where the bridge crosses the river.

7—Port Flat Yard

  1. (1)

    Track modifications to the Port Flat Yard adjacent to the Grand Trunkway will be undertaken consisting of the relocation of turnouts at the entrance of the yard to the north. This will allow trains to shunt in the yard without initiating the level crossing signals on Eastern Parade and interfering with road traffic.

  2. (2)

    An extension of Kerry Logistics' yard will be required to the north to allow for the modifications at the entrance to Port Flat Yard.

  3. (3)

    Additional track will be built in Port Flat Yard parallel to the existing track as a replacement for wagon storage currently on the site of the proposed Grand Trunkway Extension.

  4. (4)

    The eastern leg of the rail triangle will provide access to Port Flat Yard from the main rail line, with the current track to be realigned to obtain maximum operational benefit.

  5. (5)

    The western leg of the rail triangle linking Outer Harbor to Port Flat Yard will be constructed.

Division 2—Bridge/traffic control centre

8—Bridge/traffic control centre

A bridge/traffic control centre will be built between the Road and Rail Bridges on the east side of the river crossing to provide service for the operation of the 2 bridges.

Division 3—Maintenance and operation

9—Maintenance and operation of rail bridge

Maintenance and operation of the rail bridge and its associated works will be carried out after completion of the bridge and associated works.

Part 3—Authorisations and declarations for closure of roads and government railway lines and obstruction of navigation

Division 1—Permanent closure of roads

10—Permanent closure of roads

Pursuant to section 39G(1)(b) of the Act, the Commissioner is authorised to permanently close any road that it is necessary to permanently close for the purposes of implementing Stages 2 and 3 of the Project.

Division 2—Permanent closure of government railway lines

11—Permanent closure of particular government railway lines

  1. (1)

    Pursuant to section 39G(2)(b) of the Act, for the purposes of implementing Stages 2 and 3 of the Project, the Commissioner is authorised—

    1. (a)

      to permanently limit the use of the government railway lines listed in subregulation (2); or

    2. (b)

      to permanently close any or all of those government railway lines,

as the case requires.

  1. (2)

    The government railway lines are—

    1. (a)

      the rail corridor between Francis Street and Eastern Parade, Port Adelaide; and

    2. (b)

      (following their transfer from the Australian Rail Track Corporation to the Crown)—

      1. (i)

        the rail corridor between Signal 1456 (Glanville Station) and Signal 3 (Birkenhead); and

      2. (ii)

        the rail corridor between Signal 14 (Gillman Junction) and Signal 1155 (Port Adelaide Junction).

Division 3—Permanent obstruction of navigation

12—Permanent obstruction of navigation in Port River

  1. (1)

    Pursuant to section 39H(2) of the Act—

    1. (a)

      it is declared that the permanent obstruction of navigation over that area of the Port River bounded by bold black lines in Figures 2 and 3 in Schedule 2 (the delineated area) is necessary for the construction and maintenance of the road bridge and rail bridge as part of the implementation of Stages 2 and 3 of the Project; and

    2. (b)

      accordingly, the Commissioner is authorised to permanently obstruct navigation over the delineated area of the Port River.

Part 4—Concept design

Figure 1 shows the concept design for Stages 2 and 3 of the Project.

Schedule 2—Land to which Port River Expressway Project applies

Explanation of Coordinates shown in Figures 2 to 5—

1The Coordinate Origin is Permanent Survey Mark S317 (E=50000 N=100000, local in metres) that is located on the southern corner of Victoria Road and Heath Street, Cadastral No 6628/18085.

2The Point Nos and Coordinates shown in Figures 2 to 5 are defined in the table below.

 

Point No

Coordinates

1

E=50255.093742

N=100280.466961

2

E=50284.469641

N=100130.194413

3

E=50308.355774

N=100046.041002

4

E=50349.065143

N=99968.665976

5

E=50405.081495

N=99901.536880

6

E=50591.558382

N=99870.563362

7

E=50575.031897

N=99793.754809

8

E=50636.806950

N=99776.249925

9

E=50682.112751

N=99770.354818

10

E=50706.695341

N=99767.847600

11

E=50805.950983

N=99770.947036

12

E=50879.305329

N=99797.742481

12a

E=50893.476599

N=99823.324470

13

E=50906.761873

N=99853.588072

14

E=50937.245930

N=99844.646885

15

E=50949.674738

N=99872.425437

16

E=50999.032592

N=99918.567716

17

E=51117.341000

N=100098.102000

18

E=51144.684453

N=100127.767420

19

E=51174.756242

N=100114.961019

20

E=51120.715208

N=100037.653696

20a

E=51138.574510

N=100063.092203

21

E=51074.096859

N=99971.201679

22

E=51060.777584

N=99965.688945

23

E=51044.668530

N=99941.887035

24

E=51044.960323

N=99929.441355

24a

E=51019.918389

N=99893.460816

25

E=50998.634035

N=99865.924412

26

E=50989.622495

N=99865.421832

27

E=50973.645105

N=99843.014211

28

E=50971.921662

N=99831.365568

29

E=50965.790717

N=99823.433724

30

E=51042.790068

N=99849.718465

30a

E=51095.525607

N=99859.116393

30b

E=51099.103000

N=99861.432000

30c

E=51122.121000

N=99863.856000

31

E=51130.373864

N=99865.326608

31a

E=51175.523619

N=99873.593837

31b

E=51175.406374

N=99874.678969

32a

E=51189.409371

N=99884.051193

32b

E=51188.960979

N=99893.120115

32c

E=51192.356831

N=99893.288015

32d

E=51193.121670

N=99877.429132

32e

E=51219.346967

N=99887.028116

32f

E=51219.058860

N=99894.918496

32g

E=51265.602917

N=99903.958719

33

E=51324.902946

N=99925.663716

34

E=51403.634946

N=99894.762502

34a

E=51443.495229

N=99874.652234

34b

E=51424.341836

N=99878.964592

35

E=51401.366088

N=99882.333263

36

E=51378.768997

N=99886.294186

36a

E=51351.681675

N=99885.286143

37a

E=51351.937792

N=99879.853471

38

E=51321.614368

N=99878.424100

39

E=51220.902188

N=99857.658860

39a

E=51193.970143

N=99859.836123

39b

E=51194.286113

N=99853.284510

39c

E=51191.206466

N=99847.788532

40a

E=51190.782724

N=99855.745861

40b

E=51180.900094

N=99854.780246

40c

E=51165.869146

N=99854.200626

41

E=51139.704534

N=99847.938893

42

E=51088.890361

N=99843.203021

43

E=51058.833914

N=99840.401765

43a

E=51050.588000

N=99839.264000

44a

E=51037.747000

N=99836.538000

45a

E=51027.742000

N=99833.818000

46

E=51028.671306

N=99828.996545

47

E=51015.067034

N=99827.691523

48

E=51010.193934

N=99821.313397

49

E=50999.519720

N=99820.336380

50

E=50953.400793

N=99806.734121

51

E=50938.615572

N=99773.609429

52a

E=50773.337141

N=99738.789166

53

E=50757.998103

N=99712.226760

54

E=50849.142305

N=99652.374575

55

E=50884.919267

N=99604.164579

56

E=50954.120727

N=99522.472431

57

E=50963.028900

N=99505.147082

58

E=50974.694129

N=99489.500765

58a

E=50976.687312

N=99487.584362

59

E=51010.397158

N=99476.945829

60

E=51149.168951

N=99483.022273

61

E=51177.007041

N=99492.135074

62

E=51180.970307

N=99494.338663

62a

E=51187.781321

N=99500.046779

63

E=51194.315627

N=99506.736892

64

E=51199.396039

N=99514.588272

65

E=51200.721378

N=99519.896103

66

E=51201.065492

N=99531.719106

67

E=51237.078321

N=99530.670934

68

E=51237.176600

N=99528.693743

69

E=51245.562117

N=99521.098855

70

E=51257.291903

N=99521.679221

71

E=51285.481363

N=99536.020608

72

E=51313.845934

N=99546.952818

73

E=51351.844699

N=99561.601101

74

E=51366.774000

N=99568.574236

75

E=51424.153155

N=99589.901647

76

E=51478.239243

N=99610.814050

77

E=51531.119308

N=99631.260444

78

E=51542.565292

N=99601.668100

79

E=51353.396721

N=99528.501438

80

E=51342.424502

N=99530.894489

81

E=51239.827430

N=99475.658410

82

E=51241.451221

N=99442.692053

83

E=51198.367998

N=99439.807980

84

E=51195.461736

N=99447.604692

85

E=51189.660398

N=99455.450445

86

E=51154.231000

N=99441.179000

87

E=51154.722716

N=99432.503573

88

E=51134.131307

N=99440.295735

89

E=50940.235423

N=99431.763619

90

E=50911.240890

N=99471.848756

91

E=50842.640167

N=99513.855106

92

E=50807.269772

N=99549.723035

93

E=50781.385794

N=99586.323419

94

E=50747.546625

N=99639.809839

95

E=50699.115982

N=99679.766673

96

E=50652.420970

N=99703.058309

97

E=50560.379470

N=99724.043421

98

E=50524.461385

N=99728.605017

99

E=50518.981926

N=99686.550157

100

E=50423.232321

N=99698.569624

101

E=50428.729818

N=99740.762927

102

E=50350.482672

N=99750.700314

103

E=50331.953638

N=99747.979616

104

E=50306.313417

N=99741.089647

105

E=50286.463231

N=99731.159635

105a

E=50250.093827

N=99737.981471

105b

E=50244.648063

N=99709.691187

105c

E=50203.268323

N=99717.659668

106a

E=50198.213674

N=99723.884252

107

E=50174.442340

N=99724.244950

108

E=50159.107204

N=99715.475928

109

E=50154.599147

N=99712.302923

110

E=50108.239083

N=99703.682556

111

E=50046.075900

N=99691.714142

112

E=50028.602764

N=99688.100827

113

E=50027.638188

N=99848.500883

114

E=50001.664598

N=99905.791924

115

E=49999.674656

N=99924.335069

116

E=49997.679888

N=99999.913661

117

E=49998.357984

N=100030.972905

118

E=49996.586191

N=100098.089430

118a

E=49995.142243

N=100113.646551

119

E=49996.386261

N=100119.996601

120

E=50036.074576

N=100122.082486

121

E=50041.160134

N=99934.466838

122

E=50090.587366

N=99861.733627

123

E=50224.384159

N=99816.926959

123a

E=50315.247147

N=99843.774857

124a

E=50398.932920

N=99836.554069

125

E=50399.928215

N=99848.448341

126

E=50278.294332

N=99985.504017

127

E=50232.149457

N=100276.925848

Legislative history

Notes

  • Please note—References in the legislation to other legislation or instruments or to titles of bodies or offices are not automatically updated as part of the program for the revision and publication of legislation and therefore may be obsolete.

  • Earlier versions of these regulations (historical versions) are listed at the end of the legislative history.

  • For further information relating to the Act and subordinate legislation made under the Act see the Index of South Australian Statutes or of regulations

    The Highways (Port River Expressway Project) Regulations 2004 were revoked by Sch 2 of the Highways (Port River Expressway Project) Regulations 2019 on 1.9.2019.

    Principal regulations and variations

    Year

    No

    Reference

    Commencement

    2004

    165

    Gazette 5.8.2004 p2858

    5.8.2004: r 2

    2005

    146

    Gazette 23.6.2005 p1922

    23.6.2005: r 2

    2009

    296

    Gazette 10.12.2009 p6249

    10.12.2009: r 2

    Provisions varied

    Entries that relate to provisions that have been deleted appear in italics.

    Provision

    How varied

    Commencement

    r 2

    omitted under the Legislation Revision and Publication Act 2002

    23.6.2005

    r 3

    Project

    inserted by 146/2005 r 4

    23.6.2005

    r 4

    r 4(1)

    varied by 146/2005 r 5

    23.6.2005

    r 4(2)

    varied by 296/2009 r 4

    10.12.2009

    r 5

    varied by 146/2005 r 6

    23.6.2005

    rr 6—10

    deleted by 146/2005 r 7

    23.6.2005

    Sch 1

    Pt 1

    Pt 1 Div 1

    cl 2

    cl 2(3)

    varied by 146/2005 r 8(1), (2)

    23.6.2005

    cl 3

    cl 3(2)

    substituted by 146/2005 r 8(3)

    23.6.2005

    Pt 1 Div 2

    cl 4

    cl 4(2)

    varied by 146/2005 r 8(4)

    23.6.2005

    Pt 1 Div 3

    cl 5

    cl 5(1)

    varied by 146/2005 r 8(5)

    23.6.2005

    cl 5(2)

    deleted by 146/2005 r 8(6)

    23.6.2005

    Pt 1 Div 4

    inserted by 146/2005 r 8(7)

    23.6.2005

    Pt 2

    Pt 2 Div 2

    cl 8

    varied by 146/2005 r 8(8)

    23.6.2005

    Pt 2 Div 3

    inserted by 146/2005 r 8(9)

    23.6.2005

    Pt 3

    substituted by 146/2005 r 8(10)

    23.6.2005

    Pt 4

    inserted by 146/2005 r 8(10)

    23.6.2005

    varied by 296/2009 r 5

    10.12.2009

    Sch 2 before substitution by 296/2009

    Fig 3

    substituted by 146/2005 r 9

    23.6.2005

    Sch 2

    substituted by 296/2009 r 6

    10.12.2009

    Historical versions

    23.6.2005

Actions
Download as PDF Download as Word Document


Cases Citing This Decision

0

Cases Cited

0

Statutory Material Cited

0