Hail Creek Coal Holdings Pty Ltd v O'Loughlin

Link copied
Case Copied 58 min read

LAND COURT OF QUEENSLAND

CITATION: Hail Creek Coal Holdings Pty Ltd & Ors v O’Loughlin & Ors [2023] QLC 22
PARTIES: Hail Creek Coal Holdings Pty Limited,
Marubeni Resources Development Pty Ltd, and
Sumisho Coal Development Queensland Pty Ltd
(applicants)
v
Michael Thomas O'Loughlin Junior, Clayton Douglas O'Loughlin, Tarquin Michael O'Loughlin, and Jarrod Patrick O'Loughlin
(respondents)
FILE NO: MER065-23
DIVISION: General
PROCEEDING: Application to decide compensation and conduct
DELIVERED ON: 8 December 2023
DELIVERED AT: Brisbane
HEARD ON: 18, 19 and 20 October 2023
HEARD AT: Brisbane
MEMBER: JR McNamara
ORDERS:

I determine for MDL 442:

1. Ten Thousand, Three Hundred and Fifty-four dollars and Fifty cents ($10,354.50) be paid pursuant to and in satisfaction of the general liability to compensate under s 81 of the Mineral and Energy Resources (Common Provisions) Act 2014;

1. Twenty-five Thousand, Nine Hundred and Forty-seven dollars and Thirty-three cents ($25,947.33) representing negotiation and preparation costs be paid pursuant to and in satisfaction of any liability under s 91 of the Mineral and Energy Resources (Common Provisions) Act 2014.

1.    That the disputed terms of the Conduct and Compensation Agreement are decided in accordance with the Schedule attached to these orders.

1.    Any submission as to costs must be filed and served within 28 days of the publication of these reasons.

CATCHWORDS:

ENERGY AND RESOURCES – MINERALS – MINING FOR MINERALS – COMPENSATION – where the Applicants hold a Mining Development Licence (MDL442) located within the Respondents’ land – where the Applicants propose to conduct advanced exploration activity on the Respondents’ land – where the Respondents are a family enterprise operating Exevale station – whether the impacts of exploration activity cause claimed effects on cattle – whether such effects are compensatable effects pursuant to s 81 of the Mineral and Energy Resources (Common Provisions) Act 2014 (MERCPA) – whether proposed exploration activity and associated noise and disturbance cause ‘mismothering’ of calves – where the court heard such evidence for the first time – where the Respondents claim compensation for loss of opportunity for a time beyond the duration of the proposed exploration activity – where the Respondents claim reduced income as a result of the reduction of calves caused by proposed exploration activity – where the Respondents claim reduced value of meat sold due to reduction of weight gain caused by proposed exploration activity – where the Respondents claim compensation for additional management time under s 81(4)(b) MERCPA – where the parties agree on compensation under s 91 MERCPA – where the Court determines compensation under s 81 MERCPA

ENERGY AND RESOURCES – MINERALS – MINING FOR MINERALS – CONDUCT OF MINING OPERATIONS – where the Applicants propose drilling and exploration activity on the Respondents’ land – where draft conduct and compensation agreement provides for conditions of rehabilitation – where Respondents’ seek inclusion of ‘dust and soil’ under biosecurity clauses – where conduct clauses are presented in a draft conduct and compensation agreement – where the Court determines disputed conduct conditions under s…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Hail Creek Coal Holdings Pty Ltd v O'Loughlin and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details

Case
[2023] QLC 22
Decision Date

CaseChat Overview and Summary

In the case of Hail Creek Coal Holdings Pty Ltd v O'Loughlin, the court addressed a dispute between the applicants, who held a Mining Development Licence (MDL442) and proposed to conduct advanced exploration activities on the respondents' land, and the respondents, a family enterprise operating Exevale station. The respondents claimed compensation for various impacts caused by the proposed exploration activities, including the effect on cattle, reduced income, and additional management time. The court also needed to determine certain conditions for the conduct of the mining operations under the Mineral and Energy Resources (Common Provisions) Act 2014 (MERCPA).

The legal issues included whether the proposed exploration activities would cause compensatable effects under s 81 of the MERCPA, and if so, the extent of the compensation. The court also had to decide on the appropriate conditions for the conduct of the mining operations under s 96 of the MERCPA, particularly regarding biosecurity measures and weed monitoring.

The court reasoned that the proposed exploration activities would indeed cause compensatable effects, but not to the extent claimed by the respondents. The court found that the respondents were entitled to compensation for the deprivation of possession of the land’s surface and for the diminution of the use of the land for the 180-day period required to complete the activities, including rehabilitation. However, the court disallowed the claim for additional and ongoing compensation beyond the 180-day period. Regarding the conduct conditions, the court decided that the Applicants' proposed conditions for vehicle washdown and weed monitoring were appropriate, rejecting the respondents' suggested amendments.

The final orders required Hail Creek Coal Holdings Pty Ltd to pay a total of $10,354.50 for compensation under s 81 of the MERCPA and $25,947.33 for negotiation and preparation costs under s 91 of the MERCPA. The court also decided the disputed terms of the Conduct and Compensation Agreement in accordance with the attached schedule. Any submissions regarding costs were to be filed within 28 days of the publication of the reasons.

Orders

Orders of the court

I determine for MDL 442:

1. Ten Thousand, Three Hundred and Fifty-four dollars and Fifty cents ($10,354.50) be paid pursuant to and in satisfaction of the general liability to compensate under s 81 of the Mineral and Energy Resources (Common Provisions) Act 2014;

1. Twenty-five Thousand, Nine Hundred and Forty-seven dollars and Thirty-three cents ($25,947.33) representing negotiation and preparation costs be paid pursuant to and in satisfaction of any liability under s 91 of the Mineral and Energy Resources (Common Provisions) Act 2014.

1. That the disputed terms of the Conduct and Compensation Agreement are decided in accordance with the Schedule attached to these orders.

1. Any submission as to costs must be filed and served within 28 days of the publication of these reasons.

Background

Background to the litigation

Evidence

Evidence before the court

Under the heading ‘Biosecurity’ in the draft CCA Special Condition 21 (vehicle washdown) proposed by the Applicants provides:“21.1 All vehicles and machinery of the Tenement Holder and its Associates must be washed down prior to entry of the Land, on each occasion the vehicle or machinery enters the Land, in order to minimise the risk of introducing Weeds to the Land, and the Tenement Holder must obtain a certificate that can be produced to the Landholder as evidence the vehicle or machine has been washed down. 21.2 Each vehicle or machine will be inspected by the Landholder prior to entry to the Land. If the vehicle or machine has not been sufficiently washed down and there is evidence of seeds or vegetation on the vehicle then (underlining added):a) if the vehicle or machine only requires a minor or spot additional wash down to address the issue, that will occur at the Landholders’ washdown facility on a dedicate area of the Land before the vehicle or machine continues to enter the Land; orb) if the vehicle or machine requires a major washdown to address the issue, the vehicle or machine will be refused entry to the Land, and must depart the Land to be washed down at an external facility before returning to the Land, when it will be inspected again.” The underlined words in special condition 21.2 above are the subject of dispute. The Respondents say the words ‘soil, dust’ should be included such that it would read: “…and there is evidence of soil, dust, seeds or vegetation…”. The Applicants argue against the inclusion of the word soil. When the suggestion of the inclusion of the word ‘soil’ was put by Senior Counsel for the Respondents to Mr Thompson (Weed Control Impacts) he responded: “Well, you can – you can add the words soil/dust to that thing quite acceptably, but I point you to the term ‘not being sufficiently washed down’ as probably covering that – that concern you have. It’s a definition of what you consider – seeing everything. It comes off the wash down bay and it’s still got dust adhered underneath. It’s not sufficiently washed down in my view.” The avoidance of dust in vehicles in a rural landscape would seem unlikely if not impossible. Based on the evidence of Mr Thompson and accepting that the presence of soil would indicate that a particular vehicle or machine “has not been sufficiently washed down”, in my view the addition of the words “soil, dust” to Special Condition 21.2 is unnecessary. In my view the wording proposed by the Applicants is preferred. The Respondents also proposed the replacement of the word “major” with the word “further” in special condition 21.2 (b). No explanation for the proposed change was given and the matter was not discussed at the hearing. In my view, the word “major” should remain. Special Condition 21.7 (Reef 2050 Compliance) Resolved.Special Condition 22.4 (responsibility for Weeds) The condition concerns the weed monitoring period relevant to “New Weeds” after completion of the advanced activities. The Applicants say the monitoring period should be 5 years, the Respondents say 10 years. The Applicants say the only evidence is that of Mr Thompson and that their offer of responsibility for weeds for 5 years after the activities is generous:“The total duration of the mining company’s period of responsibility for weed control depends on a number of factors:• For weed species not present during a baseline assessment, but subsequently found on the disturbed area, responsibility should extend until subsequent inspections do not record the weed on the disturbed area. Typically, this will take two growth seasons. A three year period inclusive of the implementation year is advisable.• For weed species present on the disturbed areas prior to the disturbance, the period need only be 1 full growth season. A two year period inclusive of the implementation is advisable.”

Decision

Reasons for decision

Mr Clayton O’Loughlin (Respondent) was asked his view on the need for fencing during rehabilitation. He said that the cattle will come along and pull the ‘baby seed’ out and “in my experience as what has happened in the past”. He was asked about rehabilitation without fencing. He said, “some have, some haven’t.”Conclusions – loss of opportunity Although arguing that their claim is not a ‘double dip’, the Respondents have presented their claim in a way that they seek both the agreed amounts of $1,312 for deprivation of possession of the land’s surface and $5,558 for diminution of the use of the land for the 180-day period the Applicants say will be required to complete the activities including rehabilitation, and the loss assessed by Dr Stephens ($7,433.88) ongoing and annually for 2 to 3 years. That does appear to be a double dip if it ($7,433.88) was intended to represent compensation for the 180-day period. If, however, it is intended to commence at the expiration of the 180-day period and apply annually from that point until rehabilitation is complete, then perhaps not. However, having accepted compensation for deprivation of possession and for diminution of use as assessed by Mr Cavanagh, and presenting this claim as an additional amount for diminution of use calculated using a different methodology is confusing. In that regard, I prefer the methodology applied by Mr Cavanagh. That is, to determine the averaged stocking rate based on his classification of the land having reviewed aerial photography and soils and land type mapping (LongPaddock 2023a and b). The stocking rate used by Mr Cavanagh was 3.23 ha per AE, and the average daily weight gain of 0.85Kg per day. Livestock expert (for the Applicants), Mr Newsome thought both were generous in favour of the Respondents. I accept that Mr Cavanagh’s assessment of the nature of the pasture was conducted on a brief inspection and otherwise using aerial photography and maps. However, in my view the variables are more certain which renders it less prone to error. I accept that the timeframe for rehabilitation and restoration work to be carried out to the standard of the immediately adjacent country can be achieved in the 180-day period in the right conditions as stated by Mr Thompson and Mr Pearson. Agreement to any reasonable request for temporary fencing of drill pads is likely to ensure that outcome in those areas. In his affidavit, Mr Pearson says he expects the reestablishment of areas affected to be achieved within 180 days of completion of the exploration and rehabilitation activities subject to normal weather conditions. That might just require greater attention being given to the areas impacted towards the end of the drilling and rehabilitation program and the installation of temporary fencing. The amounts of $1,312 and $5,888 as agreed between the parties for compensation pursuant to s 81(4)(a)(i) and (iii) are allowed. The claim for additional and ongoing compensation of $7,433.88 is disallowed. Reduced income – mismothering (survival of calves) or lower birthing rates as a result of the Applicants’ activities

Ratio Decidendi

Legal principle established

In their compensation statement, the Applicants say that they have allowed for a ‘180-day window’ within which their exploration activities, including post-disturbance rehabilitation activities, will be undertaken. That includes the time for cultural heritage and environmental inspections, the creation of new access tracks and drill pads, undertaking the drilling activities, undertaking sampling and logging of the drill holes, and rehabilitating the drill sites and new access tracks. They say they will not be on the land at all times during the 180-day period.Preparation and location During opening submissions, Senior Counsel for the Applicants presented Queensland Globe imagery comprising four plans: the first showing the cadastral boundaries of Exevale and the road reserve; the second included the proposed drill sites and access tracks; the third included affected Exevale paddock boundaries; and the fourth included an overlay of a Powerlink (transmission line) easement (below). The imagery confirms that three Exevale paddocks will be impacted by the proposed advanced activities: the Front Paddock, the Bullock Paddock, and the Three Springs Paddock. Dr Stephens was engaged by the Respondents to provide an opinion on the economic impacts and/or loss of profits that the Respondents might suffer having regard to the activities of the Applicants. Usefully included in Dr Stephens’ report, is the following table: A more detailed plan showing the location of the proposed advanced activities (below) was attached to the 10 July 2023 Affidavit of Exploration Superintendent Bradley Pearson. The plan shows the location of the road reserve (shaded) and the actual physical location of Turrawulla Road (mostly off alignment just to the east of the road reserve). The road reserve and the physical road are in a NNW/SSE alignment. The outline of MDL 442 can be seen, as can the location of 15 proposed drill holes and the existing drill hole to be rehabilitated. Three of the drill hole sites are on the road reserve. The remaining 12 sites are in relatively close proximity to either the road reserve and/or the physical road. The plan shows (in yellow) 1.5 km of existing access tracks intended to be used, and (in green) 6.75 km of new tracks proposed for access to drill sites. In the hearing, it was accepted that the distance between the most northern drill site and the most southern was approximately 7 kilometres.Disturbance Each drill site will consist of a drill pad – an area of 30 metres x 33 metres, or 0.1 hectare. The dimensions of the disturbance area at any one location are limited by the EA to a maximum 1000m2. There will be only one drill hole per drill pad unless a ‘re-drill’ is required, in which case the second hole will be in close proximity to the first. Mr Pearson, in his affidavit, says that when the sites were inspected it did not appear that any of the sites required any slashing, nor did it appear that any levelling was required. In evidence, Mr Pearson noted that during an inspection tour with the O’Loughlins, he was unable to identify any access to one site, R008, and it was uncertain if that site would be drilled.