Greenhouse and Energy Minimum Standards (Registration Fees) Instrument (No. 1) 2022 (Cth)

Case
No judgment structure available for this case.

Greenhouse and Energy Minimum Standards (Registration Fees) Instrument (No. 1) 2022

I, Penelope Sirault, GEMS Regulator, make the following instrument.

Dated: 18 March 2022                        

Penelope Sirault

GEMS Regulator

Contents

1  Name........................................................................................................................................ 1

2  Commencement........................................................................................................................ 1

3  Authority.................................................................................................................................. 1

4  Interpretation............................................................................................................................ 1

5  Fees.......................................................................................................................................... 1

6  Schedules................................................................................................................................. 1

Schedule 1—Repeals   2

Greenhouse and Energy Minimum Standards (Registration Fees) Instrument (No. 1) 2021  2

Schedule 2—Fees payable   3

1  Name

This instrument is the Greenhouse and Energy Minimum Standards (Registration Fees) Instrument (No. 1) 2022.

2  Commencement

(1)  Each provision of this instrument specified in column 1 of the table commences, or is taken to have commenced, in accordance with column 2 of the table. Any other statement in column 2 has effect according to its terms.

Commencement information
Column 1 Column 2 Column 3
Provisions Commencement Date/Details
1.  The whole of this instrument The day after this instrument is registered.

Note:          This table relates only to the provisions of this instrument as originally made. It will not be amended to deal with any later amendments of this instrument.

(2)  Any information in column 3 of the table is not part of this instrument. Information may be inserted in this column, or information in it may be edited, in any published version of this instrument.

3  Authority

This instrument is made under section 8 of the Greenhouse and Energy Minimum Standards (Registration Fees) Act 2012.

4  Interpretation

(1)  Unless the contrary intention appears, words and expressions used in this instrument have the same meaning as given in the Greenhouse and Energy Minimum Standards Act 2012 and the Greenhouse and Energy Minimum Standards (Registration Fees) Act 2012.

(2)  The descriptions in column 4 of Schedule 2 are a generic description of the products covered by the GEMS Determinations listed in column 3 of Schedule 2.  They are provided for ease of reference only. Whether a model is covered by a GEMS Determination is determined by the relevant GEMS determination listed in column 3 of Schedule 2.

5  Fees

  Column 2 of Schedule 2 sets out the registration fees specified for registration applications in relation to models of GEMS products covered by the GEMS determinations listed in column 3 of Schedule 2.

6  Schedules

(1)Each instrument that is specified in Schedule 1 to this instrument is amended or repealed as set out in the applicable items in the Schedule, and any other item in Schedule 1 to this instrument has effect according to its terms.

(2) Schedule 2 sets out the registration fees payable in accordance with section 5 of this instrument.

Schedule 1—Repeals

Greenhouse and Energy Minimum Standards (Registration Fees) Instrument (No. 1) 2021

1  The whole of the instrument

Repeal the instrument.

Schedule 2—Fees payable

Column 1
Fee band
Column 2
Fee amount
Column 3
GEMS determinations
Column 4
Generic description of products covered by the GEMS Determination
1 $440

1.    Greenhouse and Energy Minimum Standards (Self-ballasted Compact Fluorescent Lamps for General Lighting Services) Determination 2017

2.    Greenhouse and Energy Minimum Standards (Transformers and Electronic Step-down Converters for ELV lamps) Determination 2012

3.    Greenhouse and Energy Minimum Standards (Double-Capped Fluorescent Lamps) Determination 2017

4.    Greenhouse and Energy Minimum Standards (Ballasts for Fluorescent Lamps) Determination 2012

5.    Greenhouse and Energy Minimum Standards (Incandescent Lamps for General Lighting Services) Determination 2015

6.    Greenhouse and Energy Minimum Standards (Rotary Clothes Dryers) Determination 2015

7.    Greenhouse and Energy Minimum Standards (Clothes Washing Machines) Determination 2015

8.    Greenhouse and Energy Minimum Standards (Dishwashers) Determination 2015

9.    Greenhouse and Energy Minimum Standards (External Power Supplies) Determination 2014

10.    Greenhouse and Energy Minimum Standards (Digital Television Set-top Boxes) Determination 2012

11.    Greenhouse and Energy Minimum Standards (Television) Determination 2013 (No.2)

12.    Greenhouse and Energy Minimum Standards (Computers) Determination 2013

13.    Greenhouse and Energy Minimum Standards (Computer Monitors) Determination 2014

14.    Greenhouse and Energy Minimum Standards (Swimming Pool Pumps) Determination 2021

1.   Compact Fluorescent Lamps

2.   Extra Low Voltage Lighting Converters

3.   Double-capped Fluorescent Lamps

4.   Ballasts for Fluorescent Lamps

5.   Incandescent Lamps

6.   Clothes Dryers

7.   Clothes Washing Machines

8.   Dishwashers

9.   External Power Supplies

10.  Set Top Boxes

11.  Televisions

12.  Computers

13.  Computer Monitors

14.  Swimming Pool Pumps

2 $540 15.    Greenhouse and Energy Minimum Standards (Electric Water Heaters) Determination 2012 15.  Electric Water Heaters
3 $670

16.    Greenhouse and Energy Minimum Standards (Gas Water Heaters) Determination 2017

17.    Greenhouse and Energy Minimum Standards (Air Conditioners up to 65kW) Determination 2019

18.    Greenhouse and Energy Minimum Standards (Air Conditioners above 65kW) Determination 2022

19.    Greenhouse and Energy Minimum Standards (Three Phase Cage Induction Motors) Determination 2019

20.    Greenhouse and Energy Minimum Standards (Household Refrigerating Appliances) Determination 2012

21.    Greenhouse and Energy Minimum Standards (Household Refrigerating Appliances) Determination 2019

16.  Gas Water Heaters

17.  Residential and small commercial air conditioners

18.  Large commercial air conditioners

19.  Electric Motors

20.  Refrigerators

21.  Refrigerators

4 $780

22.    Greenhouse and Energy Minimum Standards (Liquid-Chilling Packages Using the Vapour Compression Cycle) Determination 2012

23.    Greenhouse and Energy Minimum Standards (Close Control Air Conditioners) Determination 2012

24.    Greenhouse and Energy Minimum Standards (Refrigerated Cabinets) Determination 2020

25.    Greenhouse and Energy Minimum Standards (Refrigerated Display Cabinets) Determination 2012

26.    Greenhouse and Energy Minimum Standards (Power Transformers) Determination 2012

22.  Chiller Towers

23.  Close Control Air Conditioners

24.  Commercial Refrigerated Display/Storage Cabinets

25.  Commercial Refrigerators/Display Cabinets

26.  Distribution Transformers

Actions
Download as PDF Download as Word Document


Cases Citing This Decision

0

Cases Cited

0

Statutory Material Cited

0