Greenhouse and Energy Minimum Standards (Registration Fees) Instrument (No. 1) 2020 (Cth)
Greenhouse and Energy Minimum Standards (Registration Fees) Instrument (No. 1) 2020
I, Shane Gaddes, GEMS Regulator, acting in accordance with my powers under subsection 8 (1) of the Greenhouse and Energy Minimum Standards (Registration Fees) Act 2012, make this Instrument for the purpose of specifying the fees payable in relation to applications under section 41 of the Greenhouse and Energy Minimum Standards Act 2012.
Shane Gaddes
GEMS Regulator
Dated 10 August 2020
Part 1 Preliminary
Name of Instrument
This Instrument is the Greenhouse and Energy Minimum Standards (Registration Fees) Instrument (No. 1) 2020.
Commencement
This Instrument commences on the day after it is registered.
Revocation
This Instrument revokes the Greenhouse and Energy Minimum Standards (Registration Fees) Instrument (No. 2) 2019.
Object
The object of this Instrument is to specify, for the purposes of subsection 8 (1) of the Greenhouse and Energy Minimum Standards (Registration Fees) Act 2012, the fees payable in relation to applications under section 41 of the Greenhouse and Energy Minimum Standards Act 2012 to register models of GEMS products.
Interpretation
(1) Unless the contrary intention appears words and expressions used in this Instrument have the same meaning as given in the Greenhouse and Energy Minimum Standards Act 2012 and the Greenhouse and Energy Minimum Standards (Registration Fees) Act 2012.
(2) The descriptions in column 4 of Schedule 1 are a generic description of the products covered by the GEMS Determinations listed in column 3 of Schedule 1. They are provided for ease of reference only. Whether a model is covered by a GEMS Determination is determined by the relevant GEMS determination listed in column 3 of Schedule 1.
Part 2 Fees
Fees
Column 2 of Schedule 1 sets out the registration fees specified for registration applications in relation to models of GEMS products covered by the GEMS determinations listed in column 3 of Schedule 1.
Schedule 1: Fees payable
(section 5)
| Column 1 Fee band | Column 2 Fee amount | Column 3 GEMS determinations | Column 4 Generic description of products covered by the GEMS Determination. |
| 1 | $440 | 1. Greenhouse and Energy Minimum Standards (Self-ballasted Compact Fluorescent Lamps for General Lighting Services) Determination 2017 2. Greenhouse and Energy Minimum Standards (Transformers and Electronic Step-down Converters for ELV lamps) Determination 2012 3. Greenhouse and Energy Minimum Standards (Double-Capped Fluorescent Lamps) Determination 2017 4. Greenhouse and Energy Minimum Standards (Ballasts for Fluorescent Lamps) Determination 2012 5. Greenhouse and Energy Minimum Standards (Incandescent Lamps for General Lighting Services) Determination 2015 6. Greenhouse and Energy Minimum Standards (Rotary Clothes Dryers) Determination 2015 7. Greenhouse and Energy Minimum Standards (Clothes Washing Machines) Determination 2015 8. Greenhouse and Energy Minimum Standards (Dishwashers) Determination 2015 9. Greenhouse and Energy Minimum Standards (External Power Supplies) Determination 2014 10. Greenhouse and Energy Minimum Standards (Digital Television Set-top Boxes) Determination 2012 11. Greenhouse and Energy Minimum Standards (Television) Determination 2013 (No.2) 12. Greenhouse and Energy Minimum Standards (Computers) Determination 2013 13. Greenhouse and Energy Minimum Standards (Computer Monitors) Determination 2014 | 1. Compact Fluorescent Lamps 2. Extra Low Voltage Lighting Converters 3. Double-capped Fluorescent Lamps 4. Ballasts for Fluorescent Lamps 5. Incandescent Lamps 6. Clothes Dryers 7. Clothes Washing Machines 8. Dishwashers 9. External Power Supplies 10. Set Top Box 11. Televisions 12. Computers 13. Computer Monitors |
| 2 | $540 | 14. Greenhouse and Energy Minimum Standards (Electric Water Heaters) Determination 2012 | 14. Electric Water Heaters |
| 3 | $670 | 15. Greenhouse and Energy Minimum Standards (Gas Water Heaters) Determination 2017 16. Greenhouse and Energy Minimum Standards (Air Conditioners up to 65kW) Determination 2019 17. Greenhouse and Energy Minimum Standards (Three Phase Cage Induction Motors) Determination 2019 18. Greenhouse and Energy Minimum Standards (Household Refrigerating Appliances) Determination 2012 19. Greenhouse and Energy Minimum Standards (Household Refrigerating Appliances) Determination 2019 | 15. Gas Water Heaters 16. Air Conditioners 17. Electric Motors 18. Refrigerators 19. Refrigerators |
| 4 | $780 | 20. Greenhouse and Energy Minimum Standards (Liquid-Chilling Packages Using the Vapour Compression Cycle) Determination 2012 21. Greenhouse and Energy Minimum Standards (Close Control Air Conditioners) Determination 2012 22. Greenhouse and Energy Minimum Standards (Refrigerated Cabinets) Determination 2020 23. Greenhouse and Energy Minimum Standards (Refrigerated Display Cabinets) Determination 2012 24. Greenhouse and Energy Minimum Standards (Power Transformers) Determination 2012 | 20. Chiller Towers 21. Close Control Air Conditioners 22. Commercial Refrigerated Display/Storage Cabinets 23. Commercial Refrigerators/Display Cabinets 24. Distribution Transformers |
0
0
0