Greenhouse and Energy Minimum Standards (Exemption) Instrument (No. 1) 2022 (Cth)
Greenhouse and Energy Minimum Standards (Exemption) Instrument (No. 1) 2022
I, Penelope Sirault, being the person occupying the position of GEMS Regulator, make the following instrument.
Dated: 10 June 2022
Penelope Sirault
GEMS Regulator
Contents
1 Name........................................................................................................................................ 1
2 Commencement........................................................................................................................ 1
3 Authority.................................................................................................................................. 1
4 Definitions................................................................................................................................ 1
5 Exemption................................................................................................................................ 1
6 Repeal....................................................................................................................................... 1
Schedule 1—Exemption 2
1 Name
This instrument is the Greenhouse and Energy Minimum Standards (Exemption) Instrument (No. 1) 2022.
2 Commencement
This instrument commences the day after it is registered.
3 Authority
This instrument is made under subsection 37(1) of the Greenhouse and Energy Minimum Standards Act 2012.
4 Definitions
In this instrument:
Act means the Greenhouse and Energy Minimum Standards Act 2012.
Determination means the Greenhouse and Energy Minimum Standards (Air Conditioners up to 65kW) Determination 2019.
exempt models: see section 5.
5 Exemption
The models specified in clause 1 of Schedule 1 (the exempt models) are exempt from the requirements of the Determination as described at clause 2 of Schedule 1 with respect to the supplies of the exempt models specified at clause 3 of Schedule 1.
6 Repeal
This instrument is repealed on 1 July 2029.
Schedule 1—Exemption
1 Specification of exempt models
Brand Model Number Description 1
Mitsubishi Heavy Industries
FDC335KXZRE1
Mitsubishi Heat Pump Air Conditioner VRF Heat Recovery Multi Series
2
Mitsubishi Heavy Industries
FDC228KXZRE1 / FDT71KXE6F / FDT71KXE6F / FDT71KXE6F / FDT71KXE6F
Mitsubishi Heat Pump Air Conditioner VRF Heat Recovery Multi Series
3
Mitsubishi Heavy Industries
FDC450KXZRE1
Mitsubishi Heat Pump Air Conditioner VRF Heat Recovery Multi Series
4
Mitsubishi Heavy Industries
FDC500KXZRE1
Mitsubishi Heat Pump Air Conditioner VRF Heat Recovery Multi Series
5
Mitsubishi Heavy Industries
FDC560KXZRE1
Mitsubishi Heat Pump Air Conditioner VRF Heat Recovery Multi Series
6
Mitsubishi Heavy Industries
FDC615KXZRE1/FDT28KXE6F x22
Mitsubishi Heat Pump Air Conditioner VRF Heat Recovery Multi Series
7
Mitsubishi Heavy Industries
FDC475KXZRE1/FDT28KXE6F
Mitsubishi Heat Pump Air Conditioner VRF Heat Recovery Multi Series
8
Mitsubishi Heavy Industries
FDC224KXZRE1 /FDT56KXE6F
Mitsubishi Heat Pump Air Conditioner VRF Heat Recovery Multi Series
9
Mitsubishi Heavy Industries
FDC400KXZRE1 /FDT28KXE6F
Mitsubishi Heat Pump Air Conditioner VRF Heat Recovery Multi Series
10
Mitsubishi Heavy Industries
FDC224KXZRE1/FDT28KXZE1
Mitsubishi Heat Pump Air Conditioner VRF Heat Recovery Multi Series
2 Requirements from which model is exempt
Requirements of the Determination as follows:
GEMS level requirements
The models are exempted from the GEMS level requirements contained in Part 3 of the Determination
3 Supplies to which the exemption applies
This exemption only applies in relation to the supply of air conditioner models with the specifications set out in clause 1 of this Schedule by Mitsubishi Heavy Industries Air-Conditioners Australia Pty Ltd.
0
0
0