Greenhouse and Energy Minimum Standards (Exemption) Instrument (No. 1) 2020 (Cth)
Greenhouse and Energy Minimum Standards (Exemption) Instrument (No. 1) 2020
I, Shane Gaddes, being the person occupying the position of GEMS Regulator, make the following instrument.
Dated 26 June 2020
Shane Gaddes
GEMS Regulator
Contents
1 Name........................................................................................................................................ 1
2 Commencement........................................................................................................................ 1
3 Authority.................................................................................................................................. 1
4 Definitions................................................................................................................................ 1
5 Exemption................................................................................................................................ 1
6 Conditions of exemption.......................................................................................................... 1
7 Repeal....................................................................................................................................... 1
Schedule 1—Exemption and condition of exemption 2
1 Name
This instrument is the Greenhouse and Energy Minimum Standards (Exemption) Instrument (No. 1) 2020.
2 Commencement
This instrument commences the day after it is registered.
3 Authority
This instrument is made under subsection 37(1) of the Greenhouse and Energy Minimum Standards Act 2012.
4 Definitions
In this instrument:
Act means the Greenhouse and Energy Minimum Standards Act 2012.
Determination means the Greenhouse and Energy Minimum Standards (Air Conditioners up to 65kW) Determination 2019.
exemption period means the period that this instrument remains in force (see section 7 for the repeal of this instrument).
exempt model: see section 5.
5 Exemption
The models specified in clause 1 of the Schedule (the exempt models) are exempt from the requirements of the Determination as described at clause 2 of the Schedule with respect to the supplies of the exempt models specified at clause 3 of the Schedule.
6 Conditions of exemption
The conditions at clause 4 of the Schedule are specified for the purposes of subsection 37(2) of the Act.
7 Repeal
This instrument is repealed on the day after the end of the period of 12 months beginning on the day this instrument is registered.
Schedule 1—Exemption and condition of exemption
1 Specification of exempt models
Brand Model Number Description No. of units covered 1
Lennox
LCS-17C-3X-4
17kW three phase Outdoor Condensing Unit for add-on cooling
4
2
Lennox
LCS-18C-1X-4
17kW single phase Outdoor Condensing Unit for add-on cooling
244
2 Requirements from which the models are exempt
Requirements of the Determination as follows:
GEMS level requirements
The models are exempted from the GEMS level requirements contained in Part 2 and Schedule 1 of the Determination
3 Supplies to which the exemption applies
This exemption only applies in relation to the supply of air conditioners with the specifications set out in clause 1 of this Schedule by Kirby HVAC&R Pty Ltd.
4 Specification of conditions of exemption
This exemption is subject to the following conditions:
(1) The supply of the air conditioners is restricted to the number of units identified in clause 1 of this Schedule.
(2) Kirby HVAC&R Pty Ltd must:
(a)notify the GEMS Regulator when delivery of the air conditioners identified in clause 1 is received;
(b)report sales of the units to the GEMS Regulator every 3 months from the date of delivery; and
(c)report the amount of stock remaining at the end of the exemption period (if any) to the GEMS Regulator.
0
0
0