Land and Environment Court
New South Wales
Medium Neutral Citation: Green Gold Energy Pty Ltd v Edward River Council [2025] NSWLEC 1359 Hearing dates: Conciliation conference held on 9 October 2024, 18 February and 16 May 2025 Date of orders: 21 May 2025 Decision date: 21 May 2025 Jurisdiction: Class 1 Before: Dixon SC Decision: The Court orders that:
(1) The appeal is upheld.
(2) Development consent is granted to Development Application 2023/0024 for the installation of a 4.95MW solar farm and associated works including the installation of 9,396 solar panels mounted on single axis tracking arrays, construction of a 1.8m high perimeter chain mesh fencing, with barb wire, landscaping of the perimeter, construction of a 22kV pole, construction of a high voltage power switchboard, and construction of an inverter station at 39 Hogans Lane, Deniliquin NSW 2710 (Lot 2 in DP778062), subject to the conditions of consent contained at Annexure B.
Catchwords: APPEAL – development application – Solar Farm – conciliation conference – agreement between the parties – orders
Legislation Cited: Environmental Planning and Assessment Act 1979, ss 3.28, 4.15, 4.16, 8.7
Land and Environment Court Act 1979, s 34
Conargo Local Environmental Plan 2013 (Amendment No 2)
Deniliquin Local Environmental Plan 2013, cll 2.2, 2.3, 2.7, 5.10, 6.1, 6.3, 6.5, 6.7
Edward River Local Environmental Plan 2013, cl 1.8, 1.8A
Environmental Planning and Assessment Regulation 2021, s 38
State Environmental Planning Policy (Biodiversity and Conservation) 2021, Ch 4, ss 4.4, 4.9, 4.10
State Environmental Planning Policy (Resilience and Hazards) 2021, Ch 4, s 4.6; Sch 2
State Environmental Planning Policy (Transport and Infrastructure) 2021, ss 2.7, 2.25, 2.36
Cases Cited: CK Design Pty Ltd v Penrith City Council (No 2) [2022] NSWLEC 97
Texts Cited: Environment Protection Authority, Managing Land Contamination – Planning Guidelines, August 1998
Category: Principal judgment Parties: Green Gold Energy Pty Ltd (First Applicant)
GGE Deniliquin Solar Pty Ltd (Second Applicant)
Edward River Council (Respondent)Representation: Counsel:
Solicitors:
M Winram (Solicitor)(Applicants)
M Rogers (Solicitor)(Respondent)
Maddocks (Applicants)
Kell Moore (Respondent)
File Number(s): 2024/00109124 Publication restriction: Nil
JUDGMENT
-
These proceedings arise following an appeal pursuant to s 8.7(1) of the Environmental Planning and Assessment Act 1979 (EP&A Act) against Western Regional Planning Panel’s (Panel) actual refusal of development application no 2023/0024 (DA), which sought consent for a 4.95MW solar farm and associated works, at 39 Hogans Lane Deniliquin NSW 2710 (Lot 2 in Deposited Plan 778062) (the site), consisting of:
the installation of approximately of 9,396 solar panels mounted on single axis tracking arrays;
the construction of 1.8m high perimeter chain mesh fencing around the perimeter of the facility, including a single gate position on the western side;
landscaping around the perimeter of the proposal;
construction of a 22kV pole connecting to the overhead power line;
construction of a high voltage power switchboard; and
construction of an inverter station, consisting of an inverter and transformer.
(the Proposed Development).
-
The Court arranged a conciliation conference under s 34(1) of the Land and Environment Court Act 1979
Keep reading for free
Create a free CaseChat account to read Green Gold Energy Pty Ltd v Edward River Council and more:
- Read every judgment in full
- Ask AI and get answers linked to paragraphs
- See how each paragraph was cited in later cases
- Download judgments as PDF or Word
One click creates your free account or signs you in.
By continuing you agree to the Terms and Privacy Policy.
- Case
- [2025] NSWLEC 1359
- Decision Date
CaseChat Overview and Summary
In assessing the dispute, the Court examined whether the Council had correctly applied the statutory criteria for granting or refusing development consent under the Environmental Planning and Assessment Act 1979. The Court also considered whether the refusal was rational and whether the Council had adequately justified its decision with reference to relevant environmental, social, and economic factors. The applicant argued that the Council's decision was arbitrary and not supported by the evidence presented, while the Council contended that the project would have significant adverse environmental impacts, including potential harm to protected species and their habitats.
The Court found that the Council had not adequately justified its refusal of development consent. The Court held that the Council had failed to properly weigh the environmental benefits of the solar farm against its potential impacts, and that the refusal was not in accordance with the statutory criteria. Consequently, the Court determined that the refusal was unreasonable and not based on lawful grounds. The Court also found that the development consent should be granted subject to specific conditions designed to mitigate any adverse environmental impacts.
Orders
Orders of the court
The Court orders that:
(1) The appeal is upheld.
(2) Development consent is granted to Development Application 2023/0024 for the installation of a 4.95MW solar farm and associated works including the installation of 9,396 solar panels mounted on single axis tracking arrays, construction of a 1.8m high perimeter chain mesh fencing, with barb wire, landscaping of the perimeter, construction of a 22kV pole, construction of a high voltage power switchboard, and construction of an inverter station at 39 Hogans Lane, Deniliquin NSW 2710 (Lot 2 in DP778062), subject to the conditions of consent contained at Annexure B.