Gas Infrastructure (Planning Permit Exemption) Regulations 2013 (TAS)
Gas Infrastructure (Planning Permit Exemption) Regulations 2013
I, the Governor in and over the State of Tasmania and its Dependencies in the Commonwealth of Australia, acting with the advice of the Executive Council, make the following regulations under the Gas Act 2000 .8 July 2013
PETER G. UNDERWOOD
Governor
By His Excellency’s Command,
BRYAN GREEN
Minister for Energy and Resources
Regulation 3
1. | Gas connection infrastructure work | The meter for the gas connection will not straddle any title boundary, and – |
(a) if any of the work will be in respect of a building 15 metres or less from a road, the meter for the gas connection will be placed – | ||
(i) on a wall of the building that does not face the road; or | ||
(ii) if that is impracticable, so that the meter is not visible from the road or is capable of being screened from the road; and | ||
(b) if any of the work will be on masonry walls of sites identified in a planning scheme as an historic site, place or area – | ||
(i) the meter for the gas connection will be concealed (so as not to be visible on any external wall); and | ||
(ii) the fittings for the gas connection infrastructure will be fixed using non-corrosive fixings inserted into mortar joints |
1. | Gas distribution infrastructure work on a road (other than its carriageway | The work will be carried out in accordance with a conservation plan prepared by a suitably qualified person in accordance with the principles outlined in the "Australia ICOMOS Burra Charter" adopted in 1999 by the body known as the Australia International Council on Monuments and Sites, and – |
(a) any gas pipeline associated with the gas distribution infrastructure will not be visible from the road; and | ||
(b) the work will not destroy any significant features related to the historic or heritage significance of the area; and | ||
(c) the work will not destroy or permanently remove any building, tree, rock or stone | ||
2. | Gas distribution infrastructure work on a road (other than its carriageway | It has been established by a survey – |
(a) undertaken in consultation with the responsible Department in relation to the Aboriginal Relics Act 1975 ; and | ||
(b) involving a desktop assessment and, if required, an on-site survey – | ||
that no sites or relics of Aboriginal cultural heritage or significance in the area will be disturbed by the work | ||
3. | Gas distribution infrastructure work on a road (other than its carriageway | The work will be carried out in accordance with a species management or recovery plan prepared by a suitably qualified person, being a plan that – |
(a) ensures that impacts on the threatened species are avoided or minimised; and | ||
(b) has been approved by the relevant council | ||
4. | Gas distribution infrastructure work on a road (other than its carriageway | The work will be carried out in accordance with a vegetation management plan prepared by a suitably qualified person, being a plan that – |
(a) ensures that impacts on the priority State or bioregional (forest and non-forest) vegetation are avoided or minimised; and | ||
(b) has been approved by the relevant council | ||
5. | Gas distribution infrastructure work on a road (other than its carriageway | The work will be carried out in accordance with a soil and water management plan prepared by a suitably qualified person with experience in site management, being a plan that – |
(a) involving or affecting soil or water management issues; and | (a) addresses erosion control practices, sediment control practices and site remediation and revegetation programs; and | |
(b) requiring the disturbance of 250m | (b) has been approved by the relevant council | |
6. | Gas distribution infrastructure work on a road (other than its carriageway | The work is within the scope of the authority conferred by the gas entity’s licence |
[ |
1. | Gas distribution infrastructure work on land (other than a road) in an area identified in a planning scheme as involving or affecting an historic site, place or area | The work will not affect any part of the historic site, place or area |
2. | Gas distribution infrastructure work on land (other than a road) in a sensitive area | It has been established by a survey – |
(a) undertaken in consultation with the responsible Department in relation to the Aboriginal Relics Act 1975 ; and | ||
(b) involving a desktop assessment and, if required, an on-site survey – | ||
that no sites or relics of Aboriginal cultural heritage or significance in the area will be disturbed by the work | ||
3. | Gas distribution infrastructure work (other than on a road) involving or affecting native vegetation where an on-site or desktop survey conducted by a suitably qualified person (in consultation with the responsible Department in relation to the Threatened Species Protection Act 1995 ) has found that threatened species inhabit or depend on the area around the proposed worksite | The work will be carried out in accordance with a species management or recovery plan prepared by a suitably qualified person, being a plan that – |
(a) ensures that impacts on the threatened species are avoided or minimised; and | ||
(b) has been approved by the relevant council | ||
4. | Gas distribution infrastructure work involving or affecting prime agricultural land (which is agricultural land that is classified or capable of being classified as Class 1, 2 or 3 land using the class definitions and methodology from the "Land Capability Handbook", K.E. Noble, Department of Primary Industry, Tasmania, 1992) | Any ground-level structure associated with the work will not be sited on a part of the land that is in actual agricultural use |
5. | Gas distribution infrastructure work (other than on a road) involving or affecting soil and water management issues – | The work will be carried out in accordance with a soil and water management plan prepared by a suitably qualified person with experience in site management, being a plan that – |
(a) on land lying less than 40 metres from a waterway or wetland; or | (a) ensures that the transport of pollutants that may impact on water quality and aquatic ecology will be minimised; and | |
(b) on land having a gradient of, or more than, one in four; or | (b) addresses erosion control practices, sediment control practices and site remediation and revegetation programs; and | |
(c) under a waterway | (c) has been approved by the relevant council | |
6. | Gas distribution infrastructure work involving the clearing of 500m | All Zone A Landscape Priority Areas in the vicinity of the worksite have been identified by a suitably qualified person following the visual management system methods outlined in – |
(a) "The Forest Landscape - Visual Management System", Forestry Commission Tasmania, 1983; and | ||
(b) "A Manual for Forest Landscapes", Forestry Commission Tasmania, 1990 – | ||
and the work will be carried out in accordance with the requirements of those visual management system methods | ||
7. | Gas distribution infrastructure work involving the clearing of less than 100m | The slope is less than 20% (1:5) |
8. | Gas distribution infrastructure work (other than on a road) involving or affecting native vegetation where an on-site survey carried out by a suitably qualified person (in consultation with the responsible Department in relation to the Nature Conservation Act 2002 ) has identified the presence of priority State or bioregional (forest and non-forest) vegetation (or both) | The work will be carried out in accordance with a vegetation management plan prepared by a suitably qualified person, being a plan that – |
(a) ensures that impacts on the priority State or bioregional (forest and non-forest) vegetation are avoided or minimised; and | ||
(b) has been approved by the relevant council | ||
9. | Gas distribution infrastructure work (other than on a road) of a kind that is not specified in another item of this table | The work is within the scope of the authority conferred by the gas entity’s licence and will be carried out in accordance with a weed and vegetation disease management plan, being a plan that has been – |
(a) prepared by a suitably qualified person; and | ||
(b) approved by the relevant council |
Displayed and numbered in accordance with the
Notified in the
These regulations are administered in the Department of Infrastructure, Energy and Resources.