QUEENSLAND CIVIL AND
ADMINISTRATIVE TRIBUNAL
CITATION:
Field v Carey [2023] QCAT 196
PARTIES:
KEITH JOHN FIELD AND MARIA FIELD (applicant)
v
ADAM BRIAN CAREY (respondent)
APPLICATION NO/S:
BDL185-20
MATTER TYPE:
Building Matters
DELIVERED ON:
28 April 2023
HEARING DATE:
20 October 2022
HEARD AT:
Brisbane
DECISION OF:
Member Richard Oliver
ORDERS:
The Respondent must pay the Applicants the sum of $48,667.74 by 31 August 2023
CONTRACTS – BUILDING, ENGINEERING AND RELATED CONTRACTS – DEFECTIVE WORK – where parties entered into a contract for the construction of a paved concourse around an inground swimming pool – where concrete slab supporting the pavers moved causing cracking of pavers – where no engineering design – where movement due to moisture in the subsoil – whether movement caused by lack of design of reinforcing steel – whether dowels from slab to pool coping sufficient – whether rectification will result in a betterment for the applicants – whether method and cost of rectification reasonable
Fankhauser v Mission Beach Property Management [2017] QCATA 65
Hyder Consulting (Australia) Pty Ltd v Wilh Wilhelmsen Agency Pty Ltd & Anor [2001] NSWCA 313
Hoad v Scone Motors Pty Ltd [1977] NSWLA 88Jones v Dunkel (1959)101 CLR 298
APPEARANCES & REPRESENTATION:
Applicant:
Mr Hick of counsel instructed by Robinson Locke Litigation Lawyers
Respondent:
Irish Bentley Lawyers
REASONS FOR DECISION
[0]In February 2012 the applicants purchased an acreage property at Priors Pocket Road, Moggill with the intention of renovating the property to use for their retirement. The house and grounds needed substantial work. The applicants engaged an architect in mid 2013 drawings were prepared for the renovation work to be undertaken. The work commenced after this and took some years to complete. Part of the renovation and re-modelling work included refurbishment of the swimming pool at the rear of the house.
The swimming pool is rectangular with a U shaped design in the middle of the long side between the pool and the house. The U shape has steps to allow ingress and egress to and from the pool. There is a bond beam coping on the perimeter of the pool with tiles on top of the coping. The pool is separated from the house by lawn and enclosed with typical pool fencing.[1]
[1]To better understand the configuration a photo of the original pool is attachment “A” to these reasons.
As part of the overall redesign of the grounds the applicants decided to integrate the pool area into the new extended tiled back deck of the house so there was a seamless transition from the deck area to the pool. This involved the construction of a concourse around the pool, beyond the coping, with the tiled paving then going across the existing grassed area to the back deck of the house.[2]
[2]Attachment “B” is a photo of the pool after the renovation.
The applicants contacted Mr Carey to inspect the works and provide a quotation to undertake the pool work, as described to him by Mr Field. The quote,…
Keep reading for free
Create a free CaseChat account to read Field v Carey and more:
- Read every judgment in full
- Ask AI and get answers linked to paragraphs
- See how each paragraph was cited in later cases
- Download judgments as PDF or Word
One click creates your free account or signs you in.
By continuing you agree to the Terms and Privacy Policy.
- Case
- [2023] QCAT 196
- Decision Date
CaseChat Overview and Summary
Orders
Orders of the court
Full text does not contain this section.
Background
Background to the litigation
Full text does not contain this section.
Evidence
Evidence Before The Court
Full text does not contain this section.
Decision
Reasons for decision
Full text does not contain this section.
Ratio Decidendi
Legal Principle Established
Full text does not contain this section.