Environmental Protection (Metal Coating) Regulations 2001 (WA)
Western Australia
Environmental Protection Act 1986
Western Australia
Environmental Protection Act 1986
These regulations may be cited as the
In these regulations, unless the contrary intention appears —
These regulations apply to metal coating premises described in Schedule 1 Part 2 category 81 of the
An operator must carry on all spray painting in a spray painting booth unless such a booth cannot reasonably be used because of the size, shape, position, or location of the object being painted.
An operator must not carry on spray painting other than in a spray painting booth unless it is carried on in such a manner that no paint over spray escapes from the premises at which the spray painting is carried on (or if there are no defined boundaries to the premises, no such paint over spray escapes onto any place to which the public has access).
An operator must ensure that a spray painting booth that he or she is using to carry on metal coating —
(a) is designed, constructed, installed, and maintained in accordance with AS/NZS 4114.1 —
Spray painting booths ; and(b) is fitted with an efficient mechanical ventilation and dust extraction system which is operating so that —
(i) no visible paint over spray escapes from the spray painting booth;
(ii) all air from the spray painting booth passes through a ventilation and dust extraction system before being discharged into the environment; and
(iii) air discharged into the environment does not contain any substance that causes pollution.
7. Powder coating booth to be used
An operator must carry on all powder coating in a powder coating booth.
An operator must ensure that a powder coating booth that he or she is using to carry on metal coating —
(a) is designed, constructed, installed, and maintained in accordance with AS/NZS 3754 — 1990 —
Safe application of powder coatings by electrostatic spraying ; and(b) is fitted with an efficient mechanical ventilation and dust collection system which is operating so that —
(i) no visible powder escapes from the powder coating booth;
(ii) all air from the powder coating booth passes through a ventilation and dust collection system before being discharged into the environment; and
(iii) air discharged into the environment from a powder coating booth does not contain any substance that causes pollution.
9. No emission of visible dust or powder from premises
An operator must ensure that no visible dust or powder escapes from the premises.
(1) An operator must ensure that any area on premises in which a chemical that can cause pollution is used or kept is within a compound which —
(a) has walls that are impervious to acid;
(b) has a floor that is impervious to acid; and
(c) is capable of holding —
(i) 110% of the volume of the largest metal coating treatment tank or, if tanks are interconnected, 110% of the volume of the tanks in the interconnected system; and
(ii) not less than 25% of the total volume of the tanks within the compound.
(2) An operator must ensure —
(a) that storm water does not enter the area on the premises where metal coating treatment tanks are located; and
(b) that the area on the premises where metal coating treatment tanks are located is designed to ensure that a liquid is not capable of overflowing or discharging from the area.
11. Disposal of liquid waste (1) An operator must ensure that no liquid waste escapes from the premises.
(2) An operator must not discharge liquid waste into the environment.
An operator must ensure that solid waste is disposed of at a landfill site or waste treatment facility licensed under Part V of the Act.
A person who contravenes any of these regulations commits an offence.
Penalty: $5 000.
Schedule 6 to the
“
1. regulation 4 | 250 | 500 |
2. regulation 5 | 250 | 500 |
3. regulation 6 | 250 | 500 |
4. regulation 7 | 250 | 500 |
5. regulation 8 | 250 | 500 |
6. regulation 9 | 250 | 500 |
7. regulation 10(1) | 250 | 500 |
8. regulation 10(2) | 250 | 500 |
9. regulation 11(1) | 250 | 500 |
10. regulation 11(2) | 250 | 500 |
11. regulation 12 | 250 | 500 |
”.
30 Nov 2001 p. 6068-71 | 30 Nov 2001 |
bund.................................................................................................................................... 2
compound.......................................................................................................................... 2
dust collection system..................................................................................................... 2
liquid waste........................................................................................................................ 2
metal coating..................................................................................................................... 2
metal coating treatment tank........................................................................................... 2
operator.............................................................................................................................. 2
over spray.......................................................................................................................... 2
powder coating................................................................................................................. 2
powder coating booth...................................................................................................... 2
premises............................................................................................................................. 2
solid waste......................................................................................................................... 2
spray painting booth........................................................................................................ 2
0
0
0