Environmental Protection (Diesel and Petrol) Amendment Regulations 2012 (WA)
EV301*
Environmental Protection Act 1986
Environmental Protection (Diesel and Petrol)
Amendment Regulations 2012
Made by the Governor in Executive Council.
1. Citation
These regulations are the Environmental Protection (Diesel and
Petrol) Amendment Regulations 2012.2. Commencement
These regulations come into operation as follows —
(a) regulations 1 and 2 — on the day on which these regulations are published in the Gazette; (b) the rest of the regulations — on the day after that day. 3. Regulations amended
These regulations amend the Environmental Protection (Diesel
and Petrol) Regulations 1999.4. Regulation 1 amended
In regulation 1 delete “(Diesel and Petrol)” and insert:
(Petrol)
9 October 2012 GOVERNMENT GAZETTE, WA 4749 5. Regulation 3 amended
(1) In regulation 3(1) delete the definitions of:
ASTM
AVSR additive
fuel
IP(2) In regulation 3(1) insert in alphabetical order: ASTM followed by a designation refers to the standard test method of that designation, as amended from time to time, published by the standards development
organisation known as ASTM International;
fuel means —
(a) petrol; or
(b) any substance that is used as a substitute for petrol; or (c) any substance that is supplied or represented as petrol or as a substance that is used as a substitute for petrol; petrol blend means a product that consists of a petroleum or shale product mixed with ethanol;
prescribed blended petrol means petrol that contains at
least 4% of ethanol by volume but no more than 10%of ethanol by volume;
summer means a period that begins at the start of
15 October in any year and ends at the end of 15 Aprilin the following year;
(3) In regulation 3(1) in the definition of petrol delete “product”
and insert:product, or petrol blend, 6. Regulation 3A amended
Delete regulation 3A(b) and insert:
(b) diesel;
| 4750 | GOVERNMENT GAZETTE, WA | 9 October 2012 |
7. Regulation 3B replaced
Delete regulation 3B and insert:
3B. Exemption where state of emergency has been
declared(1)
A fuel supplier or a fuel distributor does not commit an offence under regulation 9(1) if the fuel supplier or fuel distributor supplies or uses petrol that does not
conform with the specification in that regulation at a place in the State during a period when an order is in force under the Fuel, Energy and Power Resources
Act 1972 section 43 declaring that a state of emergency exists in —
(a) the whole State; or
(b)
a part of the State that includes the place at which the petrol is supplied or used.
(2) A fuel supplier does not commit an offence under any
of the following (the relevant provision) —(a) regulation 10(2);
(b) regulation 11(2) or (3),
if the fuel supplier supplies or uses petrol that does not
conform with the specification set out in the relevant
provision during a period when an order is in force
under the Fuel, Energy and Power Resources Act 1972
section 43 declaring that a state of emergency exists in
the Perth area, in any part of the Perth area or in the
whole State.
8. Part 2 deleted
Delete Part 2.
9. Regulations 7 and 8 deleted
Delete regulations 7 and 8.
10. Regulation 9 amended
Delete regulation 9(1) and insert:
(1) A fuel supplier or a fuel distributor who supplies or
uses petrol at a place in the State commits an offence if
the methyl tertiary-butyl ether in the petrol is more than
0.10% volume by volume.Note: The heading to amended regulation 9 is to read: Methyl tertiary-butyl ether in petrol
9 October 2012 GOVERNMENT GAZETTE, WA 4751 11. Regulations 10 to 13 replaced
Delete regulations 10 to 13 and insert:
10. Reid Vapour Pressure of petrol supplied in Perth area during summer: until 15 April 2016
(1) This regulation applies until the end of 15 April 2016. (2) A fuel supplier commits an offence if —
(a) during a period of 30 consecutive days that is entirely during summer, the fuel supplier supplies or uses petrol at a place in the Perth area; and (b) the average Reid Vapour Pressure of the petrol over that 30-day period, calculated under subregulation (3), is — (i) for petrol (other than prescribed blended petrol) — more than 67 kPa; or
(ii) for prescribed blended petrol — more than 74 kPa.
(3) For the purposes of subregulation (2)(b), the average Reid Vapour Pressure of petrol supplied or used by a fuel supplier over a period of 30 consecutive days is the average of the Reid Vapour Pressure (ascertained in accordance with regulation 19) of at least 4 samples,
taken on separate days at regular intervals in that
30 days, of the petrol supplied or used by the fuel
supplier in that time.11. Reid Vapour Pressure of petrol supplied in Perth area during summer: from 15 October 2016
(1) This regulation applies on and after 15 October 2016. (2) A fuel supplier commits an offence if —
(a) the fuel supplier supplies or uses petrol at a place in the Perth area during summer; and (b) the Reid Vapour Pressure of the petrol supplied or used is — (i) for petrol (other than prescribed blended petrol) — more than 64 kPa; or
(ii) for prescribed blended petrol — more than 71 kPa.
(3) A fuel supplier commits an offence if —
(a)
the fuel supplier supplies or uses petrol (other than prescribed blended petrol) at a place in the Perth area during a month in summer; and
| 4752 | GOVERNMENT GAZETTE, WA | 9 October 2012 |
(b)
the monthly volumetric average Reid Vapour Pressure of the petrol in the month during which the petrol is supplied or used, calculated under subregulation (4), is more than 62 kPa.
(4) For the purposes of subregulation (3)(b), the monthly
volumetric average Reid Vapour Pressure of petrol in a
particular month is to be calculated as follows —
(a)
a sample is to be taken from each batch of the petrol supplied or used during the month by the fuel supplier;
(b)
the Reid Vapour Pressure of each sample taken is to be ascertained using the same standard test method prescribed by regulation 19;
(c)
the Reid Vapour Pressure of each sample taken is to be multiplied by a fraction that is equal to the volume of petrol in the batch from which
the sample was taken divided by the total
volume of petrol supplied or used in the
relevant month;(d)
the figures calculated under paragraph (c) for each sample of petrol are to be added together.
(5) For the purposes of subregulations (3) and (4) —
(a) if petrol is supplied or used during the period that begins at the start of 15 October and ends at the end of 31 October in any year — a reference in those subregulations to a month is
taken to be a reference to that period; and(b) if petrol is supplied or used during the period that begins at the start of 1 April and ends at the end of 15 April in any year — a reference in those subregulations to a month is taken to be a reference to that period.
12. Part 4 heading replaced
Delete the heading to Part 4 and insert:
Part 4 — Record keeping and testing
requirements
13. Regulations 15 and 16 replaced
Delete regulations 15 and 16 and insert:
16. Duties of fuel suppliers as to petrol products
(1) In this regulation — petrol product means any product (for example,
unleaded petrol or premium unleaded petrol) that
consists of petrol.
9 October 2012 GOVERNMENT GAZETTE, WA 4753
(2) A fuel supplier commits an offence if the fuel supplier
does not, for each petrol product supplied or used by
the fuel supplier at a place in the State —
(a)
ensure that analyses and calculations are conducted in relation to the petrol product in accordance with this regulation; and
(b)
keep a record of the results of those analyses and calculations in accordance with regulation 14.
(3) An analysis of each petrol product must be conducted
in respect of each batch of the petrol product entered
for home consumption.(4) An analysis under subregulation (3) must —
(a) determine the amount of methyl tertiary-butyl ether in the petrol product in accordance with the standard test method prescribed by regulation 18; and
(b)
if the petrol product is supplied or used in the Perth area during summer — determine the Reid Vapour Pressure of the petrol product in accordance with a standard test method prescribed by regulation 19.
(5) If, before the end of 15 April 2016, a fuel supplier supplies or uses a petrol product in the Perth area during summer, the average Reid Vapour Pressure of the petrol product for each consecutive period of
30 days during summer must be calculated in
accordance with regulation 10(3).(6) If, on or after 15 October 2016, a fuel supplier supplies
or uses a petrol product (other than a petrol product
consisting of prescribed blended petrol) in the Perth
area during summer, the monthly volumetric average
Reid Vapour Pressure of the petrol product for each
month in summer must be calculated in accordance
with regulation 11(4).14. Regulations 17 to 19 replaced
Delete regulations 17 to 19 and insert:
17. Fuel warranties
(1) A person who supplies fuel to another person must, if
the other person is —(a) a fuel distributor; or
(b) a person who supplies fuel to a fuel distributor,
| 4754 | GOVERNMENT GAZETTE, WA | 9 October 2012 |
give that other person a written warranty that the fuel
has been supplied in accordance with these regulations.
(2) A person who supplies fuel is not required to give such a warranty in respect of regulation 9(1), 10(2) or 11(2) or (3) if, by reason of regulation 3B, the person was not required to comply with those regulations when supplying the fuel. (3) A person who does not comply with subregulation (1)
commits an offence.(4) A person who gives a warranty that fuel has been
supplied in accordance with these regulations when in
fact the fuel has not been so supplied commits an
offence.18. Measuring methyl tertiary-butyl ether
For the purposes of these regulations the amount of
methyl tertiary-butyl ether in any petrol is the amount
determined in accordance with ASTM D4815.19. Measuring Reid Vapour Pressure
For the purposes of these regulations the Reid Vapour
Pressure of petrol is to be determined in accordance
with any of the following standard test methods —(a) ASTM D323;
(b) ASTM D5190;
(c) ASTM D5191.
15. Regulation 22 deleted
Delete regulation 22.
16. Schedule 1 amended
(1) In Schedule 1 in the Table delete “Northam (shire)” and insert: Northam (2) In Schedule 1 in the Table delete “Northam (town)”. 17. Schedules 2 and 3 deleted
Delete Schedules 2 and 3.
By Command of the Governor,
G. MOORE, Clerk of the Executive Council.