Electricity (Licensing) Amendment Regulations (No. 2) 2018 (WA)

Case
No judgment structure available for this case.

8 January 2019 GOVERNMENT GAZETTE, WA 11

ENERGY

EN301

Electricity Act 1945

Electricity (Licensing) Amendment Regulations

(No. 2) 2018

Made by the Governor in Executive Council.

1.   Citation

These regulations are the Electricity (Licensing) Amendment

Regulations (No. 2) 2018.

2.   Commencement

These regulations come into operation as follows —

(a)

regulations 1 and 2— on the day on which these regulations are published in the Gazette;

(b) the rest of the regulations — on the day after that day.
3. Regulations amended

These regulations amend the Electricity (Licensing)

Regulations 1991.

regulations 52BA and 52BB,

4.           Regulation 51 amended

In regulation 51(1) delete "regulation 52BA," and insert:

regulations 52BA and 52BB,

5. Regulation 52 amended

( 1 ) In regulation 52(1) delete "regulation 52BA," and insert:

12 GOVERNMENT GAZETTE, WA 8 January 2019
(2) In regulation 52(2AB) delete "is false or misleading." and
insert:
the electrical contractor knows, or ought reasonably to know, is
false or misleading.

6.           Regulation 52A amended

In regulation 52A(5) delete "is false or misleading." and insert:

the person knows, or ought reasonably to know, is false or
misleading.

7.           Regulation 52B amended

(1) In regulation 5213(l) delete "regulation 52BA," and insert:
regulations 52BA and 52BB,
(2) In regulation 5213(413) delete "is false or misleading." and
insert:
the electrical contractor knows, or ought reasonably to know, is
false or misleading.
(3) In regulation 5213(7) delete "is false or misleading." and insert:
the person knows, or ought reasonably to know, is false or
misleading.

8.           Regulations 52BB to 52BE inserted

After regulation 52BA insert:

52BB. Notifiable work: modified procedure available for

certain construction projects

(1) In this regulation, and regulations 52BC to 52BE -
construction project means building work that -

(a)

is expected to be carried out over the course of 12 months or more; and

(b)

includes notifiable work that alone or together with other notifiable work -

(i) will result in an electrical installation
with a calculated maximum demand, or
8 January 2019 GOVERNMENT GAZETTE, WA 13

a name plate maximum output, of at
least 1 MVA or 1 MW respectively; or

(ii) will increase the calculated maximum demand, or the name plate maximum output, of an existing electrical

installation by at least 1 MVA or 1 MW

respectively;

default procedure, in relation to notifiable work,
means the requirements of regulations 51, 52 and 52B
in relation to the notifiable work and any other
electrical installing work carried out in connection with
the notifiable work;
modified procedure means the modified procedure
referred to in subregulation (2);
notifiable work of an electrical contractor means
notifiable work that the electrical contractor carries out
or causes to be carried out;
revenue meter means a meter used to measure the

supply of electricity by a network operator.

(2) An electrical contractor may use the modified
procedure under subregulations (4) to (6) in relation to
notifiable work of the electrical contractor if—
(a) the work is part of a construction project; and
(b) the work, together with other notifiable work of the electrical contractor that is part of the construction project, would be expected to require at least 20 notices of completion but for the use of the modified procedure; and
(c) the electrical contractor advises the relevant network operator of their intention to use the modified procedure in relation to all of the

notifiable work of the electrical contractor that

is part of the construction project (the notifiable
work), before the notifiable work is begun.

(3)

The electrical contractor need not comply with the default procedure in relation to the notifiable work while using the modified procedure in relation to the

notifiable work.
(4) The modified procedure, subject to subregulations (5)
and (6), is that the electrical contractor -

(a)

must, in accordance with regulation 51, deliver to the relevant network operator a preliminary notice in respect of the notifiable work; and

(b)

must, in accordance with regulation 52BC, keep a record of all electrical installing work carried out as part of or in connection with the notifiable work; and

14 GOVERNMENT GAZETTE, WA 8 January 2019

(c)

for each revenue meter installed as part of the notifiable work, must, in accordance with regulation 52, deliver to the relevant network operator a notice of completion in respect of the installation of the meter; and

(d)

must, in accordance with regulation 52, deliver to the relevant network operator a notice of completion in respect of the installation of the main switchboard, before any part of the main switchboard is connected to transmission or distribution works or a private generating plant; and

(e)

must, in accordance with regulation 52, deliver to the relevant network operator a notice of completion in respect of the notifiable work, after the completion of the last of the notifiable work.

(5) If the notifiable work involves the use of a temporary
supply, the electrical contractor -

(a)

must, in accordance with regulation 52, deliver to the relevant network operator a notice of completion in respect of the installation of the temporary supply, before the temporary supply is connected to transmission or distribution works or a private generating plant; and

(b)

need not deliver the notice of completion referred to in subregulation (4)(d).

(6) If the construction project is to be completed in stages,
the electrical contractor -

(a)

for each stage must, in accordance with regulation 51, deliver to the relevant network operator a preliminary notice in respect of all of

the notifiable work of the electrical contractor
that is part of the stage; and

(b)

for each stage must, in accordance with regulation 52, deliver to the relevant network operator a notice of completion in respect of the notifiable work after the last of the notifiable work for the stage is completed; and

(c)

need not deliver the notice referred to in subregulation (4)(a); and

(d)

to the extent to which paragraph (b) has been complied with for all of the stages of the project, need not deliver the notice referred to in subregulation (4)(e).

8 January 2019 GOVERNMENT GAZETTE, WA 15
(7) Despite subregulations (4) to (6), a requirement under
any of those subregulations to deliver a notice in
accordance with regulation 51 or 52 in respect of
notifiable work does not have effect in relation to the
notifiable work if the regulation provides that the
notice is not required to be delivered in respect of the
notifiable work.

52BC. Modified procedure: record of electrical installing

work

(1)

The record to be kept under regulation 52BB(4)(b) by the electrical contractor must include the following -

(a) a concise description of the work carried out;
(b) the date on which the work was completed;

(c)

the name and licence number of each electrical worker who carried out the work;

(d)

certification by the electrical contractor that the work has been checked and tested and is safe and complies with the requirements of these regulations.

(2) The record must be -

(a)

in an electronic form approved by the Director; and

(b) updated weekly; and
(c) kept on site; and
(d) produced on demand by an inspector; and

(e)

retained for a period of 5 years after completion of the construction project.

(3) Subregulation (4) applies to an electrical contractor if
the Director is satisfied that -
(a) the electrical contractor -

(i)     has failed to comply with an obligation under regulation 52BB(4) to (6); or

(ii)

has made a record under contractor knows, or ought reasonably to know, is false or misleading in a material particular;

and

(b)

in the case of a failure described in or has been repeated.

16 GOVERNMENT GAZETTE, WA 8 January 2019

(4)

If this subregulation applies to an electrical contractor, the Director may, by written order, direct the electrical contractor to do one or more of the following -

(a)

cease, on the day specified in the order, using the modified procedure in relation to the notifiable work;

(b)

remedy any failure to comply with an obligation under regulation 52BB(4) to (6).

(5) An electrical contractor given an order under
subregulation (4) must comply with the order.

52BD. Modified procedure: notice requirements

(1) An electrical contractor who decides to use the
modified procedure in relation to notifiable work -
(a)

their intention to use the procedure in the
preliminary notice of proposed notifiable work
delivered under regulation 52BB(4)(a) or the
first such notice delivered under

may advise the relevant network operator of and

(b)

may decide to cease using the modified procedure in relation to any further notifiable work to be carried out as part of the construction project.

(2) If an electrical contractor decides to cease using the
modified procedure, the electrical contractor must give
written notice to the relevant network operator of their
intention to cease, on the day specified in the notice,
using the modified procedure.
(3) If an electrical contractor is required to cease using the
modified procedure by order under regulation 52BC(4), the electrical contractor must give written notice to the relevant network operator of the requirement and the
day specified in the order.

52BE. Modified procedure: opting in and ceasing

(1) An electrical contractor may use the modified
procedure in relation to notifiable work of the electrical
contractor that is part of a construction project that has
already commenced if—

(a)

the electrical contractor could have done so at the beginning of the project; and

(b)

the project is unlikely to be completed within the next 6 months; and

(c)

the electrical contractor has not previously used the modified procedure in relation to the construction project.

8 January 2019 GOVERNMENT GAZETTE, WA 17
(2) If an electrical contractor may, under subregulation (1),
use the modified procedure in relation to notifiable
work and the electrical contractor and the relevant
network operator have agreed to a changeover day,
then on the changeover day, regulations 52BB to 52BD
(with the necessary modifications) commence to apply
to the electrical contractor in relation to the notifiable
work.

N. HAGLEY, Clerk of the Executive Council.