Electricity (Licensing) Amendment Regulations (No. 2) 2011 (WA)

Case
No judgment structure available for this case.

17 May 2011 GOVERNMENT GAZETTE, WA 1813

ENERGY

EN:301*

Electricity Act 1945

Electricity (Licensing) Amendment Regulations

(No. 2) 2011

Made by the Lieutenant-Governor and Administrator in Executive
Council.

1.            Citation

These regulations are the Electricity (Licensing) Amendment
Regulations (NO. 2) 2011.

2.            Commencement

These regulations come into operation as follows —

(a)

regulations 1 and 2— on the day on which these regulations are published in the Gazette;

(b) the rest of the regulations — on the day after that day.
regulation 2(1);

3.            Regulations amended

These regulations amend the Electricity (Licensing)
Regulations 1991.

4.            Regulation 3 amended

(1) In regulation 3(1) delete the definitions of:
Australian/New Zealand Wiring Rules
legal practitioner

(2) In regulation 3(1) insert in alphabetical order:

Australian/New Zealand Wiring Rules has the

meaning given in the Electricity Regulations 1947

1814 GOVERNMENT GAZETTE, WA 17 May 2() 11

legal practitioner means an Australian legal
practitioner as defined in the Legal Profession
Act 2008 section 3;
main switchboard has the meaning given in the

Australian/New Zealand Wiring Rules clause 1.4.92;

(3) In regulation 3(1) in the definition of pri vate generating plant

before "pressure" insert:

nominal

5.            Regulation 19 amended

(1) Before regulation 19(1) insert:

(1A) In this regulation -

flexible cord

has the meaning given in the professionally qualified engineer means a person who—

(a)

holds a power electrical engineering specialisation; and

(b)

is, or is eligible to be, a member of the body known as Engineers Australia otherwise than at the grade of student;

servicing, in relation to an electrical appliance, portable
sub-distribution board or residual current device,

means -

(a)

identifying a faulty component of the appliance, board or device and replacing it with a

similar engineering specification; or
component having an equal or substantially

(b)

affixing a flexible cord to the appliance, board or device.

(2) In regulation 19(2):

(a) in paragraph (h) delete "appliance" (second occurrence)

and insert:

appliance, portable sub-distribution board or
residual current device

17 May 2011 GOVERNMENT GAZETTE, WA 1815

(b) after paragraph (h) insert:

(ia) to the testing and servicing of —

(i)     an electrical appliance; or

(ii)     a portable sub-distribution board; or

(iii)     a residual current device,

connected, or to be connected, by means of a plug and flexible cord to a plug socket outlet through which electricity is supplied or to be supplied at a nominal pressure not exceeding 1 000 volts alternating current or 1 500 volts direct current; or

(3) Delete regulation 19(4).

6.            Regulation 49 amended

(1) Delete regulation 49(1a).
(2) In regulation 49(2) delete "Subject to subregulation (1a), if"
and insert:
If
7. Regulation 49B amended
Delete regulation 49B(2) and insert:

(2) Subregulation (1)(a) is taken to be complied with if the electrical work has been carried out in accordance with the requirements referred to in regulation 49(1).

8.            Regulation 51 amended

(1) In regulation 51(1) delete "preliminary notice of the proposed
notifiable work" and insert:

a preliminary notice of the proposed notifiable work, in

a form approved by the Director and duly completed,

(2) In regulation 51(2):

(a) in paragraphs (a) and (b) delete "carried out" and insert:

carried out, or caused to be carried out,

1816 GOVERNMENT GAZETTE, WA 17 May 2() 11
(b) in paragraph (b) before "preliminary notice" insert:

a

(c) in paragraph (b) delete "exemption." and insert:

exemption; or

(d) after paragraph (b) insert:

(c) carried Out, or caused to be carried out, on a

main switchboard or on consumers mains if the
work does not require -

(i)     an alteration to service apparatus or distribution works; or

(ii)     disconnection from, or connection to, distribution works; or

(iii)     isolation from distribution works (by means of switching or the removal of fuses or links) to allow the work to be carried out safely;

or

(d) that consists of the addition or removal of

control or protective gear; or

(e) that consists of the disconnection of a final

sub-circuit from, or the removal of, a private
generating plant with a capacity not exceeding

25 kW.

(3) Delete regulation 5 1(3) and insert:

(3) In this regulation -

consumers mains has the meaning given in the
Australian/New Zealand Wiring Rules clause 1.4.33;
control or protective gear includes residual current
devices, voltage surge suppression devices, indicating
and recording instruments, indicating lamps,
data-loggers and associated wiring;
required time, in relation to delivering a preliminary

notice of proposed notifiable work, means -

(a) at least 3 working days before the proposed

notifiable work is begun, if the electrical
contractor requires advice from the relevant
network operator in relation to the proposed
notifiable work before it is begun; or

17 May 2011 GOVERNMENT GAZETTE, WA 1817

(b) at any time before the proposed notifiable work

is begun, if the electrical contractor does not
require such advice.

9.           Regulation 52 amended

(1) In regulation 52(1) delete "(2)," and insert:
(2) and (2AA),
(2) In regulation 52(2) delete "send" and insert:
deliver
(3) After regulation 52(2) insert:

(2AA) Subregulation (1) does not apply to notifiable work

carried Out at a mine if—

(a) the work does not involve an initial connection

to distribution works or a private generating

plant; and

(b) the work does not -

(i)     require an alteration to a main switchboard; or

(ii)     require an alteration to service apparatus or distribution works; or

(iii)     consist of the installation or removal of a private generating plant; or

(iv)     alter the capacity of a private generating

plant;

and

(c) the electrical contractor who carries out the work, or causes it to be carried out, makes a record of the work in a form approved by the

Director.

(2AB) An electrical contractor who makes a record for the

purposes of subregulation (2AA)(c) that the electrical
contractor knows to be false or misleading commits an
offence.

1818 GOVERNMENT GAZETTE, WA 17 May 2() 11

(2AC) The principal employer, as defined in the Mines Safety

and Inspection Act 1994 section 4(1), at a mine
commits an offence if the principal employer fails to
ensure that each record made for the purposes of
subregulation (2AA)(c) in respect of notifiable work

carried Out at the mine -

(a)

contains a declaration, signed or executed by the electrical contractor making the record, that the notifiable work to which the record applies has been checked and tested and is safe and complies with these regulations; and

(b)

is kept at the mine until the mine closes or otherwise ceases to operate.

(4) In regulation 52(3) delete "sends" and insert:
delivers
(5) After regulation 52(3) insert:

(4) For the purposes of this regulation, notifiable work is taken to be completed if the electrical installation on which the work was carried Out -

(a) is in use; or

(b)

is connected to distribution works or a private generating plant or can be connected to distribution works or a private generating plant without the use of tools; or

(c)

is ready for connection to distribution works or a private generating plant.

(5) If notifiable work is carried Out, or caused to be carried

Out, by more than one electrical contractor -

(a)

each electrical contractor must comply with subregulation (1) in respect of the portion of the work carried Out, or caused to be carried Out, by that electrical contractor; and

(b)

each notice of completion delivered under subregulation (1) must describe the portion of the work to which it relates; and

(c)

for the purposes of this regulation, in respect of each electrical contractor, the work is taken to be completed when the portion of the work carried out, or caused to be carried out, by that electrical contractor -

(i) is in use; or

17 May 2011 GOVERNMENT GAZETTE, WA 1819

(ii)     is connected to distribution works or a private generating plant or can be connected to distribution works or a private generating plant without the use of tools; or

(iii)     is ready for connection to distribution works or a private generating plant.

10.          Regulation 52A amended

(1) In regulation 52A(l) in the definition of preliminary notice
before "preliminary" insert:
a
(2) In regulation 52A(2) before "preliminary" insert:
a
(3) Delete regulation 52A(4) and insert:
(4) If an electrical contractor delivers a notice under
subregulation (2)(b), the relevant network operator is to
deliver to the electrical contractor a receipt, which,
without limiting the Interpretation Act 1984
sections 75 and 76, may be delivered by a means of
electronic communication approved by the Director.

(4) In regulation 52A(5) delete "gives" and insert:

delivers a
(5) After regulation 52A(5) insert:
(6) An electrical contractor commits an offence if the
electrical contractor delivers -

(a)

a preliminary notice for proposed notifiable work that will not be carried out, or caused to be carried Out, by or under the direction of the electrical contractor; or

(b)

a notice of completion for notifiable work that was not carried Out, or caused to be carried Out, by or under the direction of the electrical contractor.

1820 GOVERNMENT GAZETTE, WA 17 May 2() 11

11.          Regulation 52B amended

(1) In regulation 5213(1) delete "a certificate of compliance," and
insert:
an electrical safety certificate,
(2) In regulation 5213(2) delete "certificate of compliance" and
insert:
electrical safety certificate
(3) Delete regulation 5213(3) and insert:
(3) Subregulation (1) does not apply to -
(a) maintenance work; or

(b)

in-house electrical installing work carried Out under the authority of an in-house electrical installing work licence; or

(c)

electrical installing work that is carried out at a mine if the electrical contractor makes a record of the work in a form approved by the Director; or

(d)

electrical installing work that is associated with the installation of a temporary builders supply; or

(e)

electrical installing work carried out, or caused to be carried Out, by an electrical contractor exempted in writing by the Director from the requirement to prepare and deliver an electrical safety certificate, subject to any conditions that

are imposed in respect of the exemption.

(4A) In subregulation (3)(d) -

temporary builders supply means a self-contained

switchboard that -

(a) is mounted on a pole or stand; and
(b) is relocatable; and
(c) is connected to a single phase supply; and
(d) has no sub-mains connected; and
(e) consists of a meter, a service protective device, a residual current device and plug socket outlets for electrical appliances used for building

purposes.

17 May 2011 GOVERNMENT GAZETTE, WA 1821
(4B) An electrical contractor who makes a record for the
purposes of subregulation (3)(c) that the electrical
contractor knows to be false or misleading commits an
offence.
(4C) The principal employer, as defined in the Mines Safety
and Inspection Act 1994 section 4(1), at a mine
commits an offence if the principal employer fails to
ensure that each record made for the purposes of
subregulation (3)(c) in respect of electrical installing
work carried out at the mine -

(a)

contains a declaration, signed or executed by the electrical contractor making the record, that the electrical installing work to which the record applies has been checked and tested and is safe and complies with these regulations; and

(b)

is kept at the mine until the mine closes or otherwise ceases to operate.

(4) In regulation 52B(4):

(a) delete "A certificate of compliance" and insert:

An electrical safety certificate

(b) in paragraph (b) delete "certificate of compliance" and insert:

electrical safety certificate

(5) In regulation 52B(5) delete "a certificate of compliance" and
insert:
an electrical safety certificate

(6) In regulation 52B(6) delete "certificate of compliance." and

insert:

electrical safety certificate.

(7) In regulation 52B(7) delete "gives a certificate of compliance"

and insert:

delivers an electrical safety certificate

Note: The heading to amended regulation 52B is to read:

Electrical safety certificates

1822 GOVERNMENT GAZETTE, WA 17 May 2011
12. Regulation 54 amended
In regulation 54( 1) delete "sent" and insert:

delivered

By Command of the Lieutenant-Governor and Administrator,

PETER CONRAN, Clerk of the Executive Council.