Edjasen Pty Ltd v Cumberland Council

Case

[2018] NSWLEC 1251

24 May 2018

No judgment structure available for this case.

Land and Environment Court


New South Wales

Medium Neutral Citation: Edjasen Pty Ltd v Cumberland Council [2018] NSWLEC 1251
Hearing dates: Conciliation conference on 24 May 2018
Date of orders: 24 May 2018
Decision date: 24 May 2018
Jurisdiction:Class 1
Before: O’Neill C
Decision:

See [4] below

Catchwords: DEVELOPMENT APPLICATION: conciliation conference; agreement between the parties; orders
Legislation Cited: Land and Environment Court Act 1979
Category:Principal judgment
Parties: Edjasen Pty Ltd (Applicant)
Cumberland Council (Respondent)
Representation: Solicitor:
M Draybi, Centurion Lawyers (Applicant)
J McCullan, Marsdens Law Group (Respondent)
File Number(s): 2017/292680
Publication restriction: No

Judgment

  1. COMMISSIONER: In this matter, at or after a conciliation conference, an agreement under s 34(3) of the Land and Environment Court Act 1979 (the Court Act) was reached between the parties as to the terms of a decision in the proceedings that was acceptable to the parties. As the presiding Commissioner, I was satisfied that the decision was one that the Court could have made in the proper exercise of its functions (this being the test applied by s 34(3) of the Court Act). As a consequence, s 34(3)(a) of the Act required me to “dispose of the proceedings in accordance with the decision”.

  2. The Court Act also required me to “set out in writing the terms of the decision” (s 34(3)(b)). The orders made to give effect to the agreement constitute that document.

  3. In making the orders to give effect to the agreement between the parties, I was not required to make, and have not made, any merit assessment of the issues that were originally in dispute between the parties.

  4. The final orders to give effect to the parties’ agreement under s34(3) of the Land and Environment Court Act 1979 are:

  1. The Applicant is granted leave to amend Development Application No. 2017/440/1 and to rely upon the following amended plans and documents:

Plan Number and Description

Drawn By

Dated

Site Analysis – Drawing No. 16156 / A03 – Revision D

Baini Design

27/04/2018

Basement / Driveway Section – Drawing No. 16156 / A04 – Revision D

Baini Design

27/04/2018

Ground Floor Plan (U1 – U6) – Drawing No. 16156 / A05 – Revision D

Baini Design

27/04/2018

Ground Floor Plan (U6 – U16) – Drawing No. 16156 / A06 – Revision D

Baini Design

27/04/2018

First Floor Plan (U1 – U5) – Drawing No. 16156 / A07 – Revision D

Baini Design

27/04/2018

First Floor Plan (U6 – U16) – Drawing No. 16156 / A08A – Revision D

Baini Design

27/04/2018

First Floor Plan (U13 – U16) – Drawing No. 16156 / A08B – Revision D

Baini Design

27/04/2018

Roof Plan – Drawing No. 16156 / A09 – Revision D

Baini Design

27/04/2018

West & East Elevations – Drawing No. 16156 / A10 – Revision D

Baini Design

27/04/2018

Elevation (U1 – U5) – Drawing No. 16156 / A11 – Revision D

Baini Design

27/04/2018

Elevation (U6 – U12) – Drawing No. 16156 / A12 – Revision D

Baini Design

27/04/2018

Elevation (U14 – U16) – Drawing No. 16156 / A13 – Revision D

Baini Design

27/04/2018

Section A-A / F-F / G-G – Drawing No. 16156 / A14 – Revision D

Baini Design

27/04/2018

Sections B-B / C-C / D-D / E-E – Drawing No. 16156 / A15 – Revision D

Baini Design

27/04/2018

Demolition Plan – Drawing No. 16156 / A16 – Revision D

Baini Design

27/04/2018

Schedule of Materials and Finishes – Drawing No. 16156 / A20 – Revision D

Baini Design

27/04/2018

Storm Water Concept Plan Basement Level Sheet 1 of 2 – Drawing No. 101 – Issue E

Australian Consulting Engineers

12/04/2018

Storm Water Plan Basement Level Sheet 2 of 2 – Drawing No. 102 – Issue E

Australian Consulting Engineers

12/04/2018

Storm Water Layout Plan Ground Level Sheet 1 of 3 – Drawing No. 103 – Issue E

Australian Consulting Engineers

12/04/2018

Storm Water Layout Plan Ground Level Sheet 2 of 3 – Drawing No. 104 – Issue E

Australian Consulting Engineers

12/04/2018

Storm Water Layout Plan Ground Level Sheet 3 of 3 – Drawing No. 105 – Issue E

Australian Consulting Engineers

12/04/2018

OSD and WSUD Details Sheet – Drawing No. 106 – Issue E

Australian Consulting Engineers

12/04/2018

Miscellaneous Details Sheet – Drawing No. 107 – Issue E

Australian Consulting Engineers

12/04/2018

BASIX Certificate No. 769122M_02

AKV Pty Ltd

15 May 2018

  1. The appeal is upheld.

  2. Development Application No. 2017/440/1 (as amended) for the demolition of existing buildings and ancillary structures on-site, consolidation of three (3) residential lots into one (1) lot and construction of a multi-dwelling housing development comprising sixteen (16) units over basement parking providing for 24 vehicles (plus a communal car wash space), and one (1) at grade garage space on Lots 113, 114 and 93 in Deposited Plan 5296 (otherwise known as Nos. 78 to 80 Burnett Street and No. 21 Richardson Street in Merrylands) is approved subject to the conditions in Annexure “A”.

……………………….

Susan O’Neill

Commissioner of the Court

Annexure A (399 KB, pdf)

Annexure B (4.26 MB, pdf)

Decision last updated: 28 May 2018

Actions
Download as PDF Download as Word Document


Cases Citing This Decision

0

Cases Cited

0

Statutory Material Cited

1