Director, Fair Work Building Industry Inspectorate v Construction, Forestry, Mining and Energy Union

Link copied
Case Copied 20 min read

FEDERAL COURT OF AUSTRALIA

Director, Fair Work Building Industry Inspectorate v Construction, Forestry, Mining and Energy Union [2013] FCA 846

Citation: Director, Fair Work Building Industry Inspectorate v Construction, Forestry, Mining and Energy Union [2013] FCA 846
Parties: DIRECTOR, FAIR WORK BUILDING INDUSTRY INSPECTORATE v CONSTRUCTION, FORESTRY, MINING AND ENERGY UNION and COMMUNICATIONS, ELECTRICAL, ELECTRONIC, ENERGY, INFORMATION, POSTAL, PLUMBING AND ALLIED SERVICES UNION OF AUSTRALIA
File number: QUD 236 of 2012
Judge: COLLIER J
Date of judgment: 20 August 2013
Catchwords: INDUSTRIAL LAW – ss 43(1)(b), 44 and 69(1)(b) Building and Construction Industry Improvement Act 2005 (Cth) – pecuniary penalties – industrial action – coercion – intent to apply undue pressure – unauthorised work stoppages – admitted contraventions of statutory provisions by unions – union liability arising on account of conduct of union officials – agreed penalties – appropriate penalties within permissible range – application of totality principle where multiple contraventions of legislation – specific deterrence particularly relevant factor for consideration in relation to one of the respondents
Legislation: Building and Construction Industry Improvement Act 2005 (Cth) ss 5, 38, 43(1)(b), 44, 49(1)(a), 49(5), 69, 69(1)(b)
Fair Work Act 2009 (Cth) s 417
Cases cited: Alfred v Construction, Forestry, Mining and Energy Union [2011] FCA 556 cited
Construction, Forestry, Mining and Energy Union v Williams (2009) 262 ALR 417; [2009] FCAFC 171 cited
Johnson v R (2004) 205 ALR 346; [2044] HCA 15 cited
Minister for Industry, Tourism and Resources v Mobil Oil Australia Pty Ltd [2004] FCAFC 72 cited
NW Frozen Foods Pty Ltd v Australian Competition and Consumer Commission (1996) 71 FCR 285 cited
Ponzio v B & P Caelli Constructions Pty Ltd (2007) 158 FCR 543 cited
Veen v R (No 2) (1988) 164 CLR 465 cited
Date of hearing: 16 May 2013
Place: Brisbane
Division: FAIR WORK DIVISION
Category: Catchwords
Number of paragraphs: 40
Counsel for the Applicant: Mr CJ Murdoch
Solicitor for the Applicant: Clayton Utz
Counsel for the Eighth and Ninth Respondents: Mr W Friend SC
Solicitor for the Eighth and Ninth Respondents: Hall Payne

IN THE FEDERAL COURT OF AUSTRALIA

QUEENSLAND DISTRICT REGISTRY

FAIR WORK DIVISION

QUD 236 of 2012

BETWEEN:

DIRECTOR, FAIR WORK BUILDING INDUSTRY INSPECTORATE
Applicant

AND:

CONSTRUCTION, FORESTRY, MINING AND ENERGY UNION
Eighth Respondent

COMMUNICATIONS, ELECTRICAL, ELECTRONIC, ENERGY, INFORMATION, POSTAL, PLUMBING AND ALLIED SERVICES UNION OF AUSTRALIA
Ninth Respondent

JUDGE:

COLLIER J

DATE OF ORDER:

20 AUGUST 2013

WHERE MADE:

BRISBANE

THE COURT DECLARES THAT:

1.The Construction, Forestry, Mining and Energy Union (CFMEU) contravened, by operation of s 69(1)(b) of the Building and Construction Industry Improvement Act 2005 (Cth) (BCII Act):

(a) section 44 of the BCII Act with respect to the coercion on the TRI Project on 9 November 2010;

(b) section 43(1)(b) of the BCII Act with respect to the coercion on the QIMR Project on 9 November 2010 and 10 November 2010;

(c) section 43(1)(b) of the BCII Act with respect to the coercion on the Carrara Stadium Project on 9 November 2010.

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Director, Fair Work Building Industry Inspectorate v Constru... and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details
Case
[2013] FCA 846
Decision Date

CaseChat Overview and Summary

The case before the court involved the Director of the Fair Work Building Industry Inspectorate, who was pursuing the Construction, Forestry, Mining and Energy Union (CFMEU) and the Construction, Engineering, Printing and Related Industries Union (CEPU) for contraventions of the Building and Construction Industry Improvement Act 2005 (Cth). The central dispute was whether the unions' actions, specifically those of their officials, amounted to coercion and undue pressure in relation to building work at various sites in Queensland. The CFMEU was accused of contravening sections 43(1)(b) and 44 of the Act, while the CEPU was accused of contravening section 43(1)(b). The court needed to decide whether the unions' conduct warranted pecuniary penalties and if so, the appropriate amount.

The primary legal issue was whether the conduct of the union officials constituted coercion and undue pressure, leading to contraventions of the Building and Construction Industry Improvement Act 2005 (Cth). The court also needed to determine the appropriate penalties for these contraventions, considering factors such as deterrence, the totality principle, and the history of similar conduct by the unions. The unions admitted to the contraventions, which played a significant role in the court's decision on penalties.

The court found that the union officials' actions did indeed constitute coercion and undue pressure, warranting penalties under the Act. The court considered the totality principle, which dictates that penalties should reflect the overall conduct rather than isolated incidents. Given the CFMEU's history of similar conduct, the court imposed a penalty of $99,000. The CEPU, with a comparatively shorter history, was fined $20,000. The court emphasized the importance of deterrence, especially for the CFMEU, whose officials exhibited a disregard for compliance and previous penalties. The penalties proposed by the parties were deemed appropriate, reflecting the seriousness of the conduct and the need for deterrence.

The court's final orders were that the CFMEU pay $99,000 as a pecuniary penalty for the contraventions of sections 43(1)(b) and 44, and that the CEPU pay $20,000 for the contravention of section 43(1)(b). Both penalties were to be paid to the Commonwealth. The court's decision underscores the importance of compliance with industrial laws and the consequences of failing to adhere to these regulations.

Orders

Orders of the court

3. Pursuant to s 49(1)(a) of the BCII Act the CFMEU pay a sum of $99,000.00 by way of pecuniary penalty in respect of the contraventions of s 43(1)(b) and s 44 of the BCII Act.

4. Pursuant to s 49(1)(a) of the BCII Act the CEPU pay a sum of $20,000.00 by way of pecuniary penalty in respect of the contraventions of s 43(1)(b) of the BCII Act.

5. The penalties payable by the respondents be paid to the Commonwealth pursuant to s 49(5) of the BCII Act.

Note: Entry of orders is dealt with in Rule 39.32 of the Federal Court Rules 2011.

Background

Background to the litigation

Before turning to consideration of the appropriateness of the orders and penalties submitted by the parties, it is necessary to recount the agreed facts which form the background to the proceeding now before the Court.Background Watpac Construction (Queensland) Pty Ltd (“Watpac”) is a construction company engaged in major building projects in Queensland. At all material times, Watpac was engaged as the managing contractor for construction work involving:·the Translation Research Institute Project (“the TRI Project”) at Annerley, a suburb of Brisbane;·the Queensland Institute of Medical Research Centre Project (“QIMR Project”) at the Royal Brisbane Hospital in Brisbane; and·the Carrara Stadium Refurbishment and Extension Project (“Carrara Stadium Project”) at Carrara, a suburb of the Gold Coast. The construction work engaged in by Watpac in all three projects was “building work” within the definition of s 5 of the BCII Act. At material times, sub-contractors were engaged in building work at the QIMR Project site and the Carrara Stadium Project site, namely:·At the QIMR Project site on 9 and 10 November 2010, building work was engaged in by:▪ QR Concrete Pty Ltd;▪ Triple M Mechanical Services (Qld) Pty Ltd;▪ Talbrace Pty Ltd;▪ Gibbus Pty Ltd trading as Swiftform;(“QIMR Project sub-contractors”).·at the Carrara Stadium Project on 9 November 2010, building work was engaged in by:▪ Shepherd Contracting Pty Ltd;▪ Siganto and Stacey Pty Ltd;▪ Mewcastle Pty Ltd;(“Carrara Stadium Project sub-contractors”).Events on 9 November 2010 at the TRI Project Site On 9 November 2010 Watpac engaged employees to perform construction work on the TRI Project. On that day work was scheduled to commence at 6.30 am. Mr Patrick O’Doherty and Mr Joseph Myles were both organisers of the CFMEU. On 9 November 2010 Mr O’Doherty and Mr Myles entered the site at approximately 6 am and spoke to some of the Watpac employees there. Shortly after Mr O’Doherty and Mr Myles spoke with the employees, some of them left the site and some remained but did not commence work. The employees did not seek the permission of Watpac to behave in this way. The parties agree that:·Mr O’Doherty and Mr Myles induced, counselled, procured and organised the Watpac employees at the TRI Project site to not commence work as scheduled on 9 November 2010.·Mr Stewart Roberts, a project manager employed by Watpac, said words to Mr O’Doherty to the effect of “What has happened?” Mr O’Doherty replied to the effect:We have put a vote to the workforce that Watpac doesn’t have a union ratified EBA in Queensland. This is part of a campaign.·Mr Roberts said words to Mr Myles to the effect of “What is going on?” Mr Myles replied to the effect:This is a campaign to get Watpac to change to a union EBA. Queensland doesn’t have one, other States do have the union EBA.·The actions of Mr O’Doherty and Mr Myles were taken with intent to coerce Watpac or with intent to apply undue pressure to Watpac to agree to accept a building enterprise agreement with the CFMEU.·Mr O’Doherty and Mr Myles acted in breach of s 44 of the BCII Act.·By the actions of Messrs O’Doherty and Myles, pursuant to s 69(1)(b) of the BCII Act the CFMEU is taken to have acted in breach of s 44 of the BCII Act.·The CFMEU has contravened s 44 of the BCII Act.Events on 9 and 10 November 2010 at the QIMR Project Site

Evidence

Evidence Before The Court

Decision

Reasons for decision

Further, I consider that the facts demonstrate the need to impose penalties which meet the objective of specific deterrence, particularly in relation to the CFMEU whose organisers appear to have shown a somewhat cavalier disregard both of the need to comply with the law and of penalties which have been previously imposed on the union for similar conduct.Conclusion Conduct in the workplace constituting coercion as admitted by the respondents is a serious matter. In my view such conduct warrants a penalty adequate to act as a deterrent for such future conduct. However, I note that the respondents have admitted the relevant contraventions and have co-operated with the Director, thus saving the Director the need to take the matter to contested trial. Further, I note that it is not in dispute that a number of contraventions of the BCII Act have taken place, and to that extent it is appropriate to apply the totality principle as explained by the High Court in the criminal context in Johnson v R (2004) 205 ALR 346; [2004] HCA 15. The penalties proposed by the parties are such as to have regard to the entirety of the conduct in question. In relation to the conduct of the CFMEU, the penalty proposed – namely $99,000 – is at the upper end of the range for a contravention of the BCII Act. In my view, given the CFMEU’s history of similar conduct and their involvement in the contraventions the subject of this proceeding, a penalty in this amount is appropriate. I consider further that the penalty proposed in the lesser amount of $20,000 for the CEPU is similarly appropriate given their comparatively shorter history of contraventions and their smaller role in events the subject of the application before me. Accordingly, in the circumstances I am prepared to make the orders proposed by the parties.

Ratio Decidendi

Legal Principle Established