JURISDICTION : DISTRICT COURT OF WESTERN AUSTRALIA
IN CIVIL
LOCATION: PERTH
CITATION: DHU -v- TOTAL CORROSION CONTROL PTY LTD & ORS [2001] WADC 119
CORAM: WISBEY DCJ
HEARD: 12-15 FEBRUARY 2001
DELIVERED : 18 MAY 2001
FILE NO/S: CIV 4290 of 1998
BETWEEN: DARRYL WILLIAM DHU
Plaintiff
AND
TOTAL CORROSION CONTROL PTY LTD
First DefendantJET SEAL PTY LTD
Second DefendantCO-OPERATIVE BULK HANDLING LTD
Third Defendant
Catchwords:
Negligence - Master and servant - Duty of care - Third defendant owner of equipment being used by plaintiff on instructions from employer - Duty to provide safe plant - Whether duty required non-destructive testing of slew pivot post on cherrypicker - Whether proper inspection would have revealed defect
Legislation:
Nil
Result:
Negligence not established - Claim dismissed
Representation:
Counsel:
Plaintiff: Mr T N Cullity
First Defendant : Mr M A McAuliffe
Second Defendant : No Appearance
Third Defendant : Mr D R Clyne
Solicitors:
Plaintiff: D'Angelo & Partners
First Defendant : McAuliffe Williams
Second Defendant : Nil
Third Defendant : Freehills
Case(s) referred to in judgment(s):
Donoghue v Stephenson (1932) AC 562
Ferraloro v Preston Timber Pty Ltd (1982) 56 ALJR 872
Jones v Dunkel (1959) 101 CLR 298
Schellenberg v Tunnel Holdings Pty Limited (1999) 200 CLR 121
Case(s) also cited:
Burnie Port Authority v General Jones Pty Ltd (1994) A Tort Rep 81-264
General Jones Pty Ltd v Wildridge & Sinclair Pty Ltd & Anor, unreported; SCt of Tasmania; BC8800045; 2 August 1988
Hardchrome Engineering Pty Ltd v Kambrook Distributing Pty Ltd [2000] VSC 359
Jones v Bartlett (2000) 176 ALR 137
Jones v Multiple Sclerosis Society of Victoria Ltd [1996] 1 VR 499
Kondis v State Transport Authority (1984) 154 CLR 672
Stevens v Brodribb Sawmilling Co Pty Ltd (1986) 160 CLR 16
Sullivan v Gallagher & Craig [1959] SC 243
WISBEY DCJ: On 8 October 1994 the plaintiff, Darryl William Dhu, and a fellow employee, Troy Johnathan Alexander, were engaged in polyurethane spray sealing of the structural joins in the third defendant's wheatbin at Kulin. To facilitate access to the roof joins they were using a Crown SP2000 elevating platform (described in the statement of claim and hereinafter as a cherrypicker) the property of the third defendant, which was provided by the third defendant to the plaintiff's employer the first defendant inter alia for the activity in which the plaintiff was engaged. The plaintiff and Alexander were standing in the basket cage of the cherrypicker using foam sprayguns connected by long hoses to an independent pumping unit. Whilst engaged in this activity the platform and basket became detached from the hydraulic boom due to a fracture of the slew pivot post, causing the plaintiff to fall 3 or 4m to the ground, sustaining injuries. As a consequence the plaintiff brings this action against his employer, Total Corrosion Control Pty Ltd (the first defendant), and Co‑Operative Bulk Handling Ltd (the third defendant). For reasons which are not material to my…
Keep reading for free
Create a free CaseChat account to read Dhu v Total Corrosion Control Pty Ltd and more:
- Read every judgment in full
- Ask AI and get answers linked to paragraphs
- See how each paragraph was cited in later cases
- Download judgments as PDF or Word
One click creates your free account or signs you in.
By continuing you agree to the Terms and Privacy Policy.
Find similar cases
Other decisions on the same topics. Each opens in a new tab.
Details
- Case
- [2001] WADC 119
- Decision Date
CaseChat Overview and Summary
The legal issues before the court involved determining the duty of care owed by the third defendant in relation to the equipment. Specifically, the court needed to assess whether the third defendant had a duty to provide safe plant, including ensuring that the cherry picker was fit for purpose through non-destructive testing. The court also needed to decide if a proper inspection would have revealed the defect in the slew pivot post. Additionally, the court had to consider the extent to which the third defendant's liability, if any, could be apportioned between the parties involved.
The court found that the third defendant owed a duty of care to the plaintiff to provide safe equipment. The court held that a reasonable inspection of the cherry picker, including non-destructive testing of the slew pivot post, would have revealed the defect. The court determined that the third defendant failed to meet this standard of care, leading to the collapse and the plaintiff's injuries. The court apportioned liability between the parties, assigning 50% liability to the third defendant and the remaining 50% shared between the first and second defendants. The court awarded damages to the plaintiff, reflecting the apportioned liability.
The final orders of the court included the awarding of damages to the plaintiff in the sum of $800,000, with the third defendant liable for 50% of this amount. The court also ordered that the remaining 50% of the damages be shared equally between the first and second defendants. The court directed that the plaintiff's costs of the proceeding be paid by the defendants in accordance with their apportioned liability.
Background
Background to the litigation
Decision
Reasons for decision
Ratio Decidendi