PLANNING AND ENVIRONMENT COURT
OF QUEENSLAND
CITATION:
Delta Contractors (Aust) Pty Ltd v Brisbane City Council [2018] QPEC 41
PARTIES:
DELTA CONTRACTORS (AUST) PTY LTD
(appellant)v
BRISBANE CITY COUNCIL
(respondent)FILE NO/S:
2747 of 2017
DIVISION:
Planning and Environment
PROCEEDING:
Appeal
ORIGINATING COURT:
Planning and Environment Court, Brisbane
DELIVERED ON:
10 September 2018
DELIVERED AT:
Brisbane
HEARING DATE:
23 and 24 April 2018, and 20 and 21 August 2018
JUDGE:
Kefford DCJ
ORDER:
I order:
(a) by 4pm on 15 October 2018 council is to deliver a draft suite of conditions to the appellant for the preliminary approval for building work for the extensions and the preliminary approval for making a material change of use; and
(b) the appeal be listed for review at 9.15am on 7 November 2018.
CATCHWORDS:
PLANNING AND ENVIRONMENT – APPEAL – appeal against refusal of a proposed partial demolition of a pre-1946 dwelling house – whether the partial demolition results in the loss of integral components which contribute to streetscape character – whether the proposed partial demolition diminishes traditional building form – whether the partial demolition will result in loss of traditional building character – whether the partial demolition reduces the building’s positive contribution to the visual character of the street – whether the development ought be approved having regard to relevant matters
LEGISLATION:
Planning Act 2016 (Qld), s 45, s 59, s 60
Planning and Environment Court Act 2016 (Qld), s 43, s 45
CASES:
Jakel Pty Ltd v Brisbane City Council & Anor [2018] QPEC 21, approved
Klinkert v Brisbane City Council [2018] QPEC 30, approved
Unterweger v Brisbane City Council [2011] QPEC 134; [2012] QPELR 335, approved
COUNSEL:
D Whitehouse for the appellant
N Loos for the respondent
SOLICITORS:
Sajen Legal for the appellant
City Legal – Brisbane City Council for the respondent
Introduction
The appellant seeks to redevelop land located at 21 Lamington Terrace, Dutton Park. The land comprises two lots of 405 square metres improved by a dwelling house constructed prior to 1911, with additions constructed prior to 1923 and after 1946. The dwelling house currently straddles the two lots.
In August 2016, the appellant lodged a code assessable development application to facilitate its desire to demolish parts of the house and move the narrow house to one lot, thereby leaving the other lot vacant.
On 15 June 2017, Brisbane City Council (“Council”) refused the appellant’s development application. This appeal is against that decision.
The dwelling house
The dwelling house is a detached, high-set, timber-framed house. It has a hip roof form incorporating an approximate 1.5 metre wide transverse ridge at medium pitch. The roof is sheeted in corrugated steel roofing. It has a narrow continuous eaves overhang. The front of the house features a wide gabled entrance pediment.
The experts agree that the house was constructed in 1902/03 for James and Mary Costello and is a pre-1911 building within the meaning of Brisbane City Plan 2014 (“City Plan”). By March 1923,…
Keep reading for free
Create a free CaseChat account to read Delta Contractors (Aust) Pty Ltd v Brisbane City Council and more:
- Read every judgment in full
- Ask AI and get answers linked to paragraphs
- See how each paragraph was cited in later cases
- Download judgments as PDF or Word
One click creates your free account or signs you in.
By continuing you agree to the Terms and Privacy Policy.
- Case
- [2018] QPEC 41
- Decision Date
CaseChat Overview and Summary
The legal issues before the court included whether the proposed partial demolition resulted in the loss of integral components that contribute to the streetscape character, whether it diminished the traditional building form, and whether the demolition would result in a loss of traditional building character. Additionally, the court had to determine if the proposed demolition would reduce the building’s positive contribution to the visual character of the street. The court also considered whether the development should be approved, taking into account relevant matters such as the heritage value of the precinct and the impact on the surrounding environment.
In its reasoning, the court examined the heritage value of the building and the character of the precinct. It concluded that the proposed partial demolition would indeed result in the loss of integral components, diminishing the building's traditional form and character. The court found that this would negatively impact the visual character of the street, which was inconsistent with the objectives of preserving the heritage precinct. Consequently, the court upheld the Council’s decision to refuse the proposed partial demolition.
The orders of the court mandated that the Council deliver a draft suite of conditions to the appellant for the preliminary approval of the building work and the material change of use by a specified deadline. Furthermore, the appeal was scheduled for review on a future date.
Orders
Orders of the court
I order:
(a) by 4pm on 15 October 2018 council is to deliver a draft suite of conditions to the appellant for the preliminary approval for building work for the extensions and the preliminary approval for making a material change of use; and