5458 GOVERNMENT GAZETTE, WA [8 October 1993

PORT AUTHORITIES

PH401

DAMPIER PORT AUTHORITY ACT 1985

DAMF'IER PORT AUTHORITY AMENDMENT REGULATIONS 1993

Made by the Dampier Port Authority and approved by His Excellency the

Governor in Executive Council.

Citation

1. These regulations may be cited as the Dampier Port Authority

Amendment Regulations 1993.

Principal regulations

2. In these regulations the Dampier Port Authority Regulations 1989* are

referred to as the principal regulations.

[* Published in Gazette of 28 February 1989 at pp. 601-2.

For amendments to 24 August 1993 see 1992 Index to Legislation of Western Australia, Table 4, p. 55.]

Regulation 77 amended

3. Regulation 77 of the principal regulations is amended —

(a)

in subregulation (1), by deleting "Table 1" and substituting the following —

C4

items 1 and 2 of Schedule 5

.-•

(b)

by inserting after subregulation (1) the following subregulation —

(2) and (5)

(la) If the services of an approved pilot have

been arranged for a vessel and those services are —

(a) cancelled; or

(b) deferred for more than 2 hours after the arranged time,

by or on behalf of the owner or master of the vessel, the owner and master of the vessel are jointly and severally liable to pay to a collector of port charges the pilotage cancellation or deferral charge set out in item 3 of Schedule 5.

(c) by repealing subregulations (3) and (4); and

(d)

in subregulation (6), by deleting "(2) to (5)" and substituting the following —

44 11
8 October 1993] GOVERNMENT GAZETTE, WA 5459

Schedule 4 repealed and a Schedule substituted

4. Schedule 4 to the principal regulations is repealed and the following

Schedule is substituted —

it

SCHEDULE 4

[Reg-s. 70, 74, 75 & 76]

PORT CHARGES AND STORAGE CHARGES

1. Port dues 4.0 cents per gross
registered tonne (minimum
charge of $165.00)
2. Wharfage charges —

(a) all cargoes, including liquids and products in bulk

per tonne $3.70
(b) bunkers
per tonne $1.80
3. Service charges —
(a) berth hire per hour $15.00

per 55
metres of
wharf

face

(b) fresh water per tonne $2.60

(c)

layup fee for a vessel awaiting orders while

per day

$0.036

per gross

at anchor, stacked or registered
moored (charge does not
tonne (or if
apply to a vessel whose no
a vessel has
home port is the Port) documented
GRT, the
charge is
$1.00 per
metre length
on arrival)
4. Storage charges per square
metre or per tonne

(whichever is the greater) —

(a) for the first 9 days per day $0.15
(b) for days 10 to 30
inclusive per day $0.10
(c) for additional days
over 30 per day $0.075 f9.
5460 GOVERNMENT GAZETTE, WA [8 October 1993

Schedule 5 repealed and a Schedule substituted

5. Schedule 5 to the principal regulations is repealed and the following

Schedule is substituted —

SCHEDULE 5

[Reg. 77]

PILOTAGE CHARGES

Nature of pilotage Gross registered Charge
services tonnage of vessel

(GRT)

1. Pilotage of Not exceeding 10 000 2 600.00
vessels entering 10 001 — 20 000 2 970.00
or departing from 20 001 — 30 000 3 243 00
the Port 30 001 — 40 000 3 581.00
40 001 — 50 000 3 867.00
50 001 — 60 000
4 013.00
Exceeding 60 000
4 429.00
2. Pilotage of (Irrespective of GRT) 1 300.00

vessels being
moved within the
Port

3.   Pilotage

cancellation or 1 300.00
deferral

),

Passed by a resolution of the Dampier Port Authority at a meeting of the Authority held

on 23rd March 1993.

The common seal of the Dampier Port Authority was affixed here in the presence of—

W. P. STEWART, Chairman.
G. F. HAMMONDS, Member.

D. J. ROWE, Member.

Approved by His Excellency the Governor in Executive Council.

D. G. BLIGHT, Clerk of the Council.