Citation: D’Souza v Wedgewood Road Hallam No 1 Pty Ltd [2010] FCA 765
Parties: CONRAD D’SOUZA, HITESH BHATT and ACACIA RED PTY LTD (ACN 127 157 019) v WEDGEWOOD ROAD HALLAM NO 1 PTY LTD (ACN 127 649 405)
File number: VID 121 of 2010
Judge: GORDON J
Date of judgment: 21 July 2010
Catchwords: TRADE PRACTICES – misrepresentation – contract for the sale of land – pre-contractual representations about whether fill would be required on the land – engineering plan inadvertently omitted from contract – amended plans disclosing need for fill not read by purchasers – whether adequate disclosure under s 9AB of the Sale of Land Act 1962 (Vic) – whether the purchaser relied on representations
Legislation: Sale of Land Act 1962 (Vic)
Trade Practices Act 1974 (Cth)
Transfer of Land Act 1958 (Vic)
Cases cited:

Argy v Blunts & Lane Cove Real Estate Pty Limited (1990) 26 FCR 112
Australian Competition and Consumer Commission v Dukemaster Pty Ltd [2009] FCA 682
Beverly Manufacturing Co Pty Ltd v ANS Nominees Pty Ltd (1978) 22 ALR 237
Clifford v Solid Investments Australia Pty Ltd [2009] VSC 223
Elders Trustee & Executor Co Ltd v E G Reeves Pty Ltd (1987) 78 ALR 193
Everest Project Developments Pty Ltd v Mendoza [2008] VSC 366
Flight v Booth (1834) 131 ER 1160
Fraser v NRMA Holdings Limited (1995) 55 FCR 452
Global Sportsman Pty Ltd v Mirror Newspapers Pty Ltd (1984) 2 FCR 82

Gregg v Tasmanian Trustees Ltd (1997) 73 FCR 91

Henjo Investments Pty Limited v Collins Marrickville Pty Limited (No 1) (1988) 39 FCR 546
Higgins v Statewide Developments Pty Ltd (2010) 14 BPR 27,293
Molotu Pty Ltd v Solar Power Ltd (1989) NSW ConvR ¶55-490
Rhone-Poulenc Agrochimie SA v UIM Chemical Services Pty Ltd (1986) 12 FCR 477

Date of hearing: 31 May & 1 June 2010
Date of last submissions: 2 June 2010
Place: Melbourne
Division: GENERAL DIVISION
Category: Catchwords
Number of paragraphs: 93
Counsel for the Applicants: CR Northrop
Solicitor for the Applicants: Robert Richter & Associates
Counsel for the Respondent: M Bevan-John
Solicitor for the Respondent: Taylor Splatt & Partners

IN THE FEDERAL COURT OF AUSTRALIA

VICTORIA DISTRICT REGISTRY

GENERAL DIVISION

VID 121 of 2010

BETWEEN:

CONRAD D’SOUZA
First Applicant

HITESH BHATT
Second Applicant

ACACIA RED PTY LTD (ACN 127 157 019)
Third Applicant

AND:

WEDGEWOOD ROAD HALLAM NO 1 PTY LTD (ACN 127 649 405)
Respondent

JUDGE:

GORDON J

DATE OF ORDER:

21 JULY 2010

WHERE MADE:

MELBOURNE

THE COURT DECLARES THAT:

1.The Applicants have forfeited the deposit of $101,169.00 paid by the Applicants under the Contract of Sale dated 19 February 2008 (the Contract of Sale) for Lot 10 on Plan of Subdivision PS612556N at Wedgewood Road Hallam in the State of Victoria (Lot 10).

2.The Respondent may re-sell Lot 10 in accordance with cl 6(3)(b)(ii) of Table A in the Seventh…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read D'Souza v Wedgewood Road Hallam No 1 Pty Ltd and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details
Case
[2010] FCA 765
Decision Date

CaseChat Overview and Summary

The matter of D'Souza v Wedgewood Road Hallam No 1 Pty Ltd involved a dispute between the Applicants and the Respondent concerning a contract for the sale of land. The Applicants contended that the Respondent made misleading and deceptive pre-contractual representations about the need for fill on Lot 10, and that these representations were false or misleading conduct under the Trade Practices Act 1974 (Cth). The Applicants sought a declaration that the contract had been rescinded and a refund of the deposit and other amounts paid, or alternatively, orders under the TPA for rescission and refund. The Respondent cross-claimed for a declaration that the Applicants had repudiated the contract, seeking to retain the moneys paid and the right to re-sell the lot.

The central legal issues before the court were whether the Respondent's representations were misleading or deceptive conduct under the TPA and whether the Applicants had relied on these representations. The court also needed to determine if the amended engineering plans, which disclosed the need for fill, constituted adequate disclosure under section 9AB of the Sale of Land Act 1962 (Vic). The court considered the nature of the fill required on Lot 10, the evidence of the geotechnical consultant, and whether the Applicants had read and understood the amended plans.

The court found that the Respondent had not engaged in misleading or deceptive conduct as the Applicants had not relied on the alleged representations regarding the need for fill. The court held that the Applicants had not demonstrated that they had relied on any specific representations about the fill, nor that they had been misled by any omission or non-disclosure. The amended plans provided adequate disclosure of the need for fill, and the Applicants had not acted on the basis of any alleged misrepresentation. Therefore, the Applicants' claim for rescission and refund under the TPA was dismissed. The Respondent was entitled to retain the moneys paid by the Applicants, and the court allowed the Respondent to re-sell Lot 10. The Applicants' Fast Track Application was dismissed, and they were ordered to pay the Respondent's costs of the Fast Track Application and the Cross-Claim.

Orders

Orders of the court

THE COURT DECLARES THAT:

1. The Applicants have forfeited the deposit of $101,169.00 paid by the Applicants under the Contract of Sale dated 19 February 2008 (the Contract of Sale) for Lot 10 on Plan of Subdivision PS612556N at Wedgewood Road Hallam in the State of Victoria (Lot 10).

2. The Respondent may re-sell Lot 10 in accordance with cl 6(3)(b)(ii) of Table A in the Seventh Schedule to the Transfer of Land Act 1958 (Vic) and, pending the re-sale, is entitled to retain the other moneys paid to it by the Applicants under the Contract of Sale to satisfy any deficiency in the price on the re-sale and any resulting expenses.

AND THE COURT ORDERS THAT:

3. The Fast Track Application is dismissed.

4. The Applicants pay the Respondent’s costs of the Fast Track Application and the Cross-Claim, such costs to be taxed in default of agreement.

Note: Settlement and entry of orders is dealt with in Order 36 of the Federal Court Rules.

Background

Background to the litigation

The Applicants submitted that the alleged pre-contractual representations and the omitted north-south cross section represented that no fill would be required on Lot 10 and that representation was misleading and deceptive conduct contrary to s 52 of the TPA and a false or misleading representation contrary to s 53A of the TPA. The Applicants sought a declaration that the Contract of Sale had been rescinded, an order that the Respondent refund the deposit and other amounts paid by the Applicants to the Respondent under the Contract of Sale and, alternatively, orders under s 87 of the TPA that the Contract of Sale was void or that the Applicants were entitled to rescind the Contract of Sale and were entitled to the refund of the deposit and other amounts paid by the Applicants to the Respondent under the Contract of Sale. The Respondent cross-claimed seeking orders and declarations that the Applicants had repudiated the contract at common law, that the Respondent was now entitled to retain the moneys paid by the Applicants under the Contract of Sale, and to re-offer the lot for sale to the public. FACTSThe Fill on the Subdivision It is necessary to begin by saying something about the nature of the fill at the Subdivision, and in particular on Lot 10. As noted earlier, before its development the Subdivision site was a disused quarry (Annexure A). The aerial photograph of the property in Annexure A showed that the property had a large rim around the edge of the property and a large hole or crater of varying surface levels occupying the majority of the quarry site. Mr Steven Buffinton, a geotechnical consultant, gave evidence about the nature of the fill required on Lot 10 and the Subdivision generally. Mr Buffinton’s uncontroverted evidence was that Civiltest Pty Ltd (Civiltest), a company of which he is a director, was engaged by one of the joint venture partners in the Respondent, Bayport Group, to provide inspection and testing services on earthworks associated with Lot 10 at the Subdivision in a manner that would satisfy the criteria for “Level 1 Supervision” in the Australian Standard which governed earthworks on commercial developments, AS3798 - Guidelines on Earthworks for Commercial and Residential Developments (2007). His evidence was that between October 2007 and August 2009, 1,904 compaction tests across the whole Subdivision were conducted, including a number of tests on Lot 10. Between March 2008 and February 2009, a number of pre-fill inspections conducted by staff of Civiltest at the Subdivision revealed that “the test area had been stripped back to the natural ground, weathered granite or granitic clay all of which is suitable for the placement of structural fill”. According to Mr Buffinton, the areas were filled “with fill material which was placed in no more than 300[mm] layers, moisture treated using a water truck, and then compacted.” If more than 300mm of fill was required, more than one layer would be laid. At the end of this process, each lot had been levelled and had a flat surface upon which construction might take place.