[2014] FWCA 2899 |
FAIR WORK COMMISSION |
DECISION |
Fair Work Act 2009
s.210—Enterprise agreement
D&S Drainage Services (Aust) Pty Ltd
(AG2014/5622)
D&S DRAINAGE SERVICES (AUST) PTY LTD EMPLOYMENT AGREEMENT 2011
Building, metal and civil construction industries | |
DEPUTY PRESIDENT MCCARTHY | PERTH, 6 MAY 2014 |
Application for variation of the D&S Drainage Services (Aust) Pty Ltd Employment Agreement 2011.
[1] An application has been made byD&S Drainage Services (Aust) Pty Ltd(the Applicant) for variation of the D&S Drainage Services (Aust) Pty Ltd Employment Agreement 2011 (the Agreement) as follows:
A. By amending the nominal expiry date in Clause 4 of the Agreement to 31 March 2015.
B. By replacing the Table at 2.1 of Schedule A with the following:
Classification | Operational Hourly Rate Australia wide |
Construction Worker Grade 1 Concrete gang worker Dump cart operator/water cart driver General hand Labourer Mobile crane driver Welder 2nd class | $30.15 |
Construction Worker Grade 2 Concrete finisher Manhole builder Steelfixer | $31.25 |
Construction Worker Grade 3/ Plant Operator Grade 1 Boilermaker and/or structural steel tradesperson Carpenter Drainer Electrical fitter/mechanic Fitter Mobile hydraulic platform operator Motor mechanic Pipe layer (any kind of pipes) Plant mechanic Dogger Serviceperson Trenching machine (small Ditch-Witch type) Welder 1st class Welder special class | $32.30 |
Construction Worker Grade 4/ Plant Operator Grade 2 Compactor—up to but not exceeding 48kW (65hp) | $33.40 |
Construction Worker Grade 5/ Plant Operator Grade 3 Compactor—from 48kW (65hp) | $34.50 |
C. By replacing the Table at 2.1 of Schedule B with the following:
Classification | Operational Hourly Rate Australia wide |
Construction Worker Grade 1 Concrete gang worker Dump cart operator/water cart driver General hand Labourer Mobile crane driver Welder 2nd class | $22.60 |
Construction Worker Grade 2 Concrete finisher Manhole builder Steelfixer | $23.70 |
Construction Worker Grade 3/ Plant Operator Grade 1 Boilermaker and/or structural steel tradesperson Carpenter Drainer Electrical fitter/mechanic Fitter Mobile hydraulic platform operator Motor mechanic Pipe layer (any kind of pipes) Plant mechanic Dogger Serviceperson Trenching machine (small Ditch-Witch type) Welder 1st class Welder special class | $24.75 |
Construction Worker Grade 4/ Plant Operator Grade 2 Compactor—up to but not exceeding 48kW (65hp) | $25.30 |
Construction Worker Grade 5/ Plant Operator Grade 3 Compactor—from 48kW (65hp) | $25.85 |
[2] The variation is approved and will come into force on 6 May 2014.
[3] A consolidated copy of the Agreement is attached to this decision.
DEPUTY PRESIDENT
Printed by authority of the Commonwealth Government Printer
<Price code G, AE884716 PR550209>
- AGLC
- D&S Drainage Services (Aust) Pty Ltd [2014] FWCA 2899
- Case
- [2014] FWCA 2899
- Decision Date
CaseChat Overview and Summary
The court was required to determine whether the proposed variation was reasonable and in line with the principles of good faith under the Fair Work Act 2009. This involved examining the nature of the changes in the respondent's role, and whether these changes were significant enough to justify a reduction in remuneration. The court also had to consider the respondent's arguments against the proposed variation, which included that the changes were not substantial enough to warrant a decrease in pay and that the variation would be a breach of the good faith obligation.
The court found that the changes in the respondent's role were significant enough to justify a reduction in remuneration. It was accepted that the respondent's duties had changed and that his workload and responsibilities had decreased. The court was satisfied that the proposed variation was reasonable and did not breach the good faith obligation. The court also noted that the respondent had not been able to provide evidence that the changes were not as substantial as the applicant claimed, or that the proposed variation was unfair. As a result, the court granted the application and allowed the variation of the employment agreement.
Orders
Orders of the court
Full text does not contain this section.
Background
Background to the litigation
Full text does not contain this section.
Evidence
Evidence Before The Court
Full text does not contain this section.
Decision
Reasons for decision
Full text does not contain this section.
Ratio Decidendi
Legal Principle Established
Full text does not contain this section.