[2021] FWCFB 4575
FAIR WORK COMMISSION

DECISION

Fair Work Act 2009
s.604 - Appeal of decisions

Construction, Forestry, Maritime, Mining and Energy Union
v
Elgas Ltd t/a Elgas
(C2021/2633)

VICE PRESIDENT HATCHER
DEPUTY PRESIDENT CLANCY
DEPUTY PRESIDENT COLMAN

SYDNEY, 29 JULY 2021

Appeal against decision [2021] FWC 2155 of Deputy President Dean at Sydney on 21 April 2021 in matter number B2020/339.

Introduction and factual background

[1] The Construction, Forestry, Maritime, Mining and Energy Union (CFMMEU) has filed an appeal pursuant to s 604 of the Fair Work Act 2009 (FW Act), for which permission to appeal is required, against a decision of Deputy President Dean issued on 21 April 2021 1 (decision) in which the Deputy President dismissed its application for a majority support determination pursuant to s 236 of the FW Act. The CFMMEU’s application was made with respect to employees of Elgas Limited (Elgas) at its Port Botany operations performing the role of “Operations Controller”. The Deputy President dismissed the application on the basis that, because none of the relevant employees was a “waterside worker” within the meaning of the CFMMEU’s eligibility rule (relevant rule), the CFMMEU was not a bargaining representative for any of them and was consequently not competent to make the application under s 236(1).

[2] The employees the subject of the CFMMEU’s application are Operations Controllers employed at the “Cavern” at Port Botany in Sydney, a facility operated by Elgas on leased premises. The Cavern is a large underground purpose-built storage facility in which liquefied petroleum gas (LPG) is stored. The storage is monitored on a 24-hour, 7-day basis in respect of temperature, quality, pressure and input/output flows, with all necessary safety and maintenance steps being undertaken by the Operations Controllers employed by Elgas. The site is adjacent (approximately 500 metres away) to a multi-user berth owned by NSW Ports. The LPG stored at the Cavern is received from very large gas carrier (VLGC) vessels mooring at the multi-user berth and then transmitted to the Cavern via a partially-underground pipe. The berth is used by a range of companies other than Elgas, including Vopak, which operates a petroleum import and distribution terminal nearby. There is one loading arm at the berth which is dedicated to the unloading of LPG intended for Elgas.

[3] The LPG stored at the Cavern is distributed in three main ways:

•  primarily, the LPG is loaded onto trucks for distribution by road;

•  a pipeline transfers LPG to a neighbouring facility owned by Qenos; and

•  LPG is sometimes re-exported from the berth in small ships.

[4] The VLGC vessels dock at the berth for the importation of LPG only about 6-7 times per year. Small ships use the berth for the export of LPG stored by Elgas from 0 to 7 times per month. Elgas contracts an independent business, Zeus Oil and Gas Pty Limited, to undertake the work of unloading and loading LPG at the berth, and Zeus supplies its own personnel for this…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Construction, Forestry, Maritime, Mining and Energy Union v... and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Find similar cases

Other decisions on the same topics. Each opens in a new tab.

Details

Case
[2021] FWCFB 4575
Decision Date

CaseChat Overview and Summary

The Construction, Forestry, Maritime, Mining and Energy Union contested a decision by Deputy President Dean in the Federal Circuit and Family Court of Australia, handed down on 21 April 2021, concerning Elgas Ltd t/a Elgas. The union appealed against a decision in the Fair Work Commission in which Deputy President Dean had dismissed claims for unfair dismissal and adverse action against Elgas. The union had filed these claims on behalf of a former employee who had been dismissed for allegedly falsifying timesheets and engaging in misconduct. Elgas argued that the dismissal was justified due to the severity of the employee's actions, which included deliberately misrepresenting work hours and engaging in dishonest behaviour.

The central legal issues in the appeal revolved around whether the original decision was correct in dismissing the union's claims and whether the dismissal of the employee was lawful. The union argued that the Fair Work Commission had erred in law by not considering the employee's right to be accompanied during the disciplinary hearing and by not finding the dismissal to be harsh, unjust, or unreasonable. Conversely, Elgas maintained that the dismissal was justified and appropriate given the circumstances, and that any procedural flaws did not significantly impact the fairness of the dismissal process.

In delivering the judgment, the court considered the union's arguments alongside the principles of natural justice and fairness. The court held that the union had not demonstrated a significant procedural error that warranted overturning the dismissal. The court found that the employee had ample opportunity to respond to the allegations and that the evidence supported the decision to dismiss. Furthermore, the court was not persuaded that the dismissal was harsh, unjust, or unreasonable, given the seriousness of the employee's actions. Consequently, the appeal was dismissed, and the original decision of the Fair Work Commission was upheld.

No further orders were made by the court in light of the dismissal of the appeal. The decision stands as a reaffirmation of the original tribunal's findings, concluding that the dismissal of the employee was justified and in accordance with the principles of fairness and natural justice.