Coffs Harbour Local Environmental Plan 2013 (NSW)

Case
No judgment structure available for this case.

Part 1Preliminary1.1Name of Plan

This Plan is Coffs Harbour Local Environmental Plan 2013.

1.1AACommencement

This Plan commences on the day on which it is published on the NSW legislation website.

1.2Aims of Plan(1)

This Plan aims to make local environmental planning provisions for land in Coffs Harbour in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.

(2)

The particular aims of this Plan are as follows—

  • (aa)

    to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,

  • (a)

    to promote a sustainable growth footprint by directing urban development and growth into the existing urban footprint and identified greenfield investigation areas,

  • (b)

    to protect and sustainably manage areas of high biodiversity, agricultural, scenic, recreational and European and Aboriginal cultural heritage value,

  • (c)

    to reinforce the Coffs Harbour City Centre as the principal business, office, cultural, civic, entertainment and retail hub, while supporting the objectives of Zones E1, E2, E3 and MU1,

  • (d)

    to reinforce the Coffs Harbour local government area business centres hierarchy to maintain the primacy of the Coffs Harbour City Centre and provide for a range of employment opportunities in appropriate locations,

  • (e)

    to provide for active living and connectivity by providing healthy, walkable and green built environments, including quality public open space and community facilities and walkable local streets,

  • (f)

    to provide for development that supports tourism in appropriate locations,

  • (g)

    to create a highly liveable city, through the promotion of design excellence in all elements of the built environment and public domain,

  • (h)

    to create local and sub-regional movement corridors by maximising renewal opportunities after the completion of the Coffs Harbour bypass,

  • (i)

    to promote ecologically sustainable development that supports a strong and diverse local economy both now and into the future,

  • (j)

    to ensure that sensitive land uses and development are sited and designed so that they do not affect the viability of existing uses,

  • (k)

    to provide for the social and economic welfare of the community by facilitating equitable access to public open spaces, community services and facilities that are safe and meet the needs of a diverse population,

  • (l)

    to promote the delivery and maintenance of housing diversity and affordable housing,

  • (m)

    to promote a strong sense of community, identity and place,

  • (n)

    to promote the effective management of natural hazards and risks and the creation of a climate resilient community.

cl 1.2: Am 2022 (32), Sch 1[1]; 2022 (829), Sch 1.6[1].

1.3Land to which Plan applies(1)

This Plan applies to the land identified on the Land Application Map.

(1A)

(Repealed)

cl 1.3: Am 2020 (45), cl 5(1).

1.4Definitions

The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.

1.5Notes

Notes in this Plan are provided for guidance and do not form part of this Plan.

1.6Consent authority

The consent authority for the purposes of this Plan is (subject to the Act) the Council.

1.7Maps(1)

A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—

  • (a)

    approved by the local plan-making authority when the map is adopted, and

  • (b)

    as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.

(1AA)

(Repealed)

(2)

Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.

(3)

Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.

(4)

For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.

Note.

The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.

1.8Repeal of planning instruments applying to land(1)

All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.

Note.

The following local environmental plans are repealed under this provision—

  • Coffs Harbour City Centre Local Environmental Plan 2011

  • Coffs Harbour City Local Environmental Plan 2000

(2)

All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.

cl 1.8: Am 2020 (45), cl 5(2) (3).

1.8ASavings provision relating to development applications(1)

If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.

Note.

However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.

(2)

A development application made, but not finally determined, before the commencement of State Environmental Planning Policy Amendment (Flood Planning) 2023 must be determined as if that policy had not commenced.

cl 1.8A: Am 2019 (621), Sch 5[1]; 2023 (609), Sch 1.1[1].

1.8B

(Repealed)

cl 1.8B: Rep 2016 (310), Sch 4.8 [1].

1.9Application of SEPPs(1)

This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.

(2)

The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—

cl 1.9: Am 2016 (310), Sch 4.8 [2].

1.9ASuspension of covenants, agreements and instruments(1)

For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.

(2)

This clause does not apply—

  • (a)

    to a covenant imposed by the Council or that the Council requires to be imposed, or

  • (b)

    to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or

  • (c)

    to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or

  • (d)

    to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or

  • (e)

    to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or

  • (f)

    to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or

  • (g)

    to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.

(3)

This clause does not affect the rights or interests of any public authority under any registered instrument.

(4)

Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).

cl 1.9A: Am 2019 (621), Sch 5[2]–[4].

Part 2Permitted or prohibited development2.1Land use zones

The land use zones under this Plan are as follows—

  • Rural Zones

    RU2 Rural Landscape

    RU3 Forestry

  • Residential Zones

    R1 General Residential

    R2 Low Density Residential

    R3 Medium Density Residential

    R4 High Density Residential

    R5 Large Lot Residential

  • Employment Zones

    E1 Local Centre

    E2 Commercial Centre

    E3 Productivity Support

    E4 General Industrial

    E5 Heavy Industrial

  • Mixed Use Zones

    MU1 Mixed Use

  • Special Purpose Zones

    SP1 Special Activities

    SP2 Infrastructure

    SP3 Tourist

  • Recreation Zones

    RE1 Public Recreation

    RE2 Private Recreation

  • Conservation Zones

    C1 National Parks and Nature Reserves

    C2 Environmental Conservation

    C3 Environmental Management

  • Waterway Zones

    W1 Natural Waterways

    W2 Recreational Waterways

    W3 Working Waterways

    W4 Working Waterfront

cl 2.1: Am 2019 (192), Sch 1 [1]; 2022 (829), Sch 1.6[2] [3].

2.2Zoning of land to which Plan applies

For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.

2.3Zone objectives and Land Use Table(1)

The Land Use Table at the end of this Part specifies for each zone—

  • (a)

    the objectives for development, and

  • (b)

    development that may be carried out without development consent, and

  • (c)

    development that may be carried out only with development consent, and

  • (d)

    development that is prohibited.

(2)

The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.

(3)

In the Land Use Table at the end of this Part—

  • (a)

    a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and

  • (b)

    a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.

(4)

This clause is subject to the other provisions of this Plan.

Notes.

Schedule 1 sets out additional permitted uses for particular land.

Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.

Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).

Clause 2.6 requires consent for subdivision of land.

Part 5 contains other provisions which require consent for particular development.

2.4Unzoned land(1)

Development may be carried out on unzoned land only with development consent.

(2)

In deciding whether to grant development consent, the consent authority—

  • (a)

    must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and

  • (b)

    must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.

2.5Additional permitted uses for particular land(1)

Development on particular land that is described or referred to in Schedule 1 may be carried out—

  • (a)

    with development consent, or

  • (b)

    if the Schedule so provides—without development consent,

in accordance with the conditions (if any) specified in that Schedule in relation to that development.

(2)

This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.

2.6Subdivision—consent requirements(1)

Land to which this Plan applies may be subdivided, but only with development consent.

Notes.

If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.

Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.

(2)

Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.

Note.

The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.

2.7Demolition requires development consent

The demolition of a building or work may be carried out only with development consent.

Note.

If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.

2.8Temporary use of land(1)

The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.

(2)

Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 30 days (whether or not consecutive days) in any period of 12 months.

(3)

Development consent must not be granted unless the consent authority is satisfied that—

  • (a)

    the temporary use will not prejudice the subsequent carrying out of development on the land in accordance with this Plan and any other applicable environmental planning instrument, and

  • (b)

    the temporary use will not adversely impact on any adjoining land or the amenity of the neighbourhood, and

  • (c)

    the temporary use and location of any structures related to the use will not adversely impact on environmental attributes or features of the land, or increase the risk of natural hazards that may affect the land, and

  • (d)

    at the end of the temporary use period the land will, as far as is practicable, be restored to the condition in which it was before the commencement of the use.

(4)

Despite subclause (2), the temporary use of a dwelling as a sales office for a new release area or a new housing estate may exceed the maximum number of days specified in that subclause.

(5)

Subclause (3)(d) does not apply to the temporary use of a dwelling as a sales office mentioned in subclause (4).

2.9Canal estate development prohibited(1)

Canal estate development is prohibited on land to which this Plan applies.

(2)

In this Plan, canal estate development means development that involves—

  • (a)

    a constructed canal, or other waterway or waterbody, that—

    • (i)

      is inundated by surface water or groundwater movement, or

    • (ii)

      drains to a waterway or waterbody by surface water or groundwater movement, and

  • (b)

    the erection of a dwelling, and

  • (c)

    one or both of the following—

    • (i)

      the use of fill material to raise the level of all or part of the land on which the dwelling will be erected to comply with requirements for residential development in the flood planning area,

    • (ii)

      excavation to create a waterway.

(3)

Canal estate development does not include development for the purposes of drainage or the supply or treatment of water if the development is—

  • (a)

    carried out by or with the authority of a person or body responsible for the drainage, supply or treatment, and

  • (b)

    limited to the minimum reasonable size and capacity.

(4)

In this clause—

flood planning area has the same meaning as in clause 5.21.

Land Use TableNote—

State environmental planning policies, including the following, may be relevant to development on land to which this Plan applies—

  • State Environmental Planning Policy (Housing) 2021

  • State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems

  • State Environmental Planning Policy (Resources and Energy) 2021, Chapter 2

  • State Environmental Planning Policy (Resilience and Hazards) 2021, Chapter 3

  • State Environmental Planning Policy (Industry and Employment) 2021, Chapter 3

  • State Environmental Planning Policy (Primary Production) 2021, Chapter 2

Land Use tbl: Am 2016 (5), Sch 1 [1] [2]; 2017 (493), Sch 1.1 [1] [2]; 2018 (514), Sch 1 [1]; 2019 (137), Sch 6 [1]; 2019 (192), Sch 1 [2]; 2021 (714), Sch 10.5; 2022 (32), Sch 1[2]–[34]; 2022 (314), Sch 1; 2022 (829), Sch 1.6[4] [5].

Zone RU2Rural Landscape1Objectives of zone
  • To encourage sustainable primary industry production by maintaining and enhancing the natural resource base.

  • To maintain the rural landscape character of the land.

  • To provide for a range of compatible land uses, including extensive agriculture.

  • To minimise the fragmentation and alienation of resource lands.

  • To support sustainable rural economic development and small-scale tourism and visitor destination opportunities that are compatible with the rural attributes of the land.

  • To protect environmental value and minimise land use conflict.

2Permitted without consent

Building identification signs; Extensive agriculture; Home-based child care; Home occupations; Intensive plant agriculture; Roadside stalls

3Permitted with consent

Agriculture; Airstrips; Animal boarding or training establishments; Aquaculture; Bed and breakfast accommodation; Boat launching ramps; Boat sheds; Business identification signs; Camping grounds; Cellar door premises; Cemeteries; Centre-based child care facilities; Community facilities; Crematoria; Depots; Dual occupancies; Dwelling houses; Eco-tourist facilities; Environmental facilities; Environmental protection works; Extractive industries; Farm buildings; Farm stay accommodation; Flood mitigation works; Forestry; Helipads; High technology industries; Home businesses; Home industries; Industrial training facilities; Information and education facilities; Jetties; Kiosks; Landscaping material supplies; Moorings; Neighbourhood shops; Places of public worship; Plant nurseries; Recreation areas; Recreation facilities (outdoor); Respite day care centres; Restaurants or cafes; Roads; Rural industries; Rural supplies; Turf farming; Water recreation structures; Water supply systems

4Prohibited

Any development not specified in item 2 or 3

Zone RU3Forestry1Objectives of zone
  • To enable development for forestry purposes.

  • To enable other development that is compatible with forestry land uses.

2Permitted without consent

Uses authorised under the Forestry Act 2012 or under Part 5B (Private native forestry) of the Local Land Services Act 2013

3Permitted with consent

Aquaculture; Bee keeping; Boat launching ramps; Camping grounds; Depots; Eco-tourist facilities; Extractive industries; Information and education facilities; Jetties; Recreation areas; Roads; Rural industries; Water recreation structures; Water recycling facilities

4Prohibited

Any development not specified in item 2 or 3

Zone R1General Residential1Objectives of zone
  • To provide for the housing needs of the community.

  • To provide for a variety of housing types and densities.

  • To enable other land uses that provide facilities or services to meet the day to day needs of residents.

  • To encourage the provision of appropriately scaled tourist and visitor accommodation and tourist-related development in locations where it can be adequately provided with services and where the scale and intensity of the development does not detrimentally impact on adjoining, predominantly residential land uses.

  • To support active and safe mixed uses at street level compatible with residential living.

  • To provide for associated infrastructure that supports the changing housing needs of the population that is consistent with local character.

  • To encourage active living through the provision of healthy, walkable, green and safe built environments and streets, greener connections and walking and cycling infrastructure.

  • To ensure that development reflects design excellence in its presentation to the public realm.

2Permitted without consent

Building identification signs; Home-based child care; Home occupations

3Permitted with consent

Attached dwellings; Boarding houses; Camping grounds; Caravan parks; Centre-based child care facilities; Community facilities; Dwelling houses; Eco-tourist facilities; Emergency services facilities; Entertainment facilities; Environmental facilities; Environmental protection works; Exhibition homes; Exhibition villages; Flood mitigation works; Food and drink premises; Function centres; Group homes; Helipads; High technology industries; Home businesses; Home industries; Hostels; Information and education facilities; Kiosks; Markets; Multi dwelling housing; Neighbourhood shops; Oyster aquaculture; Passenger transport facilities; Places of public worship; Pond-based aquaculture; Recreation areas; Recreation facilities (indoor); Recreation facilities (outdoor); Registered clubs; Residential accommodation; Residential flat buildings; Respite day care centres; Roads; Semi-detached dwellings; Seniors housing; Service stations; Shop top housing; Signage; Tank-based aquaculture; Tourist and visitor accommodation; Veterinary hospitals; Water supply systems

4Prohibited

Rural workers’ dwellings; Any other development not specified in item 2 or 3

Zone R2Low Density Residential1Objectives of zone
  • To provide for the housing needs of the community within a low density residential environment.

  • To enable other land uses that provide facilities or services to meet the day to day needs of residents.

  • To provide for housing diversity and choice and associated infrastructure that supports the changing housing needs of the population that is consistent with local character.

  • To encourage active living through the provision of healthy, walkable, green and safe built environments and streets, greener connections and walking and cycling infrastructure.

  • To ensure that development reflects design excellence in its presentation to the public realm.

2Permitted without consent

Building identification signs; Home-based child care; Home occupations

3Permitted with consent

Attached dwellings; Bed and breakfast accommodation; Boarding houses; Business identification signs; Caravan parks; Centre-based child care facilities; Community facilities; Dual occupancies; Dwelling houses; Emergency services facilities; Environmental facilities; Environmental protection works; Exhibition homes; Exhibition villages; Flood mitigation works; Group homes; Health consulting rooms; Home businesses; Home industries; Hostels; Kiosks; Neighbourhood shops; Oyster aquaculture; Places of public worship; Pond-based aquaculture; Recreation areas; Recreation facilities (indoor); Recreation facilities (outdoor); Respite day care centres; Roads; Semi-detached dwellings; Seniors housing; Shop top housing; Tank-based aquaculture; Water storage facilities

4Prohibited

Any development not specified in item 2 or 3

Zone R3Medium Density Residential1Objectives of zone
  • To provide for the housing needs of the community within a medium density residential environment.

  • To provide a variety of housing types within a medium density residential environment.

  • To enable other land uses that provide facilities or services to meet the day to day needs of residents.

  • To provide for associated infrastructure that supports the changing housing needs of the population that is consistent with local character.

  • To encourage active living through the provision of healthy, walkable, green and safe built environments and streets, greener connections and walking and cycling infrastructure.

  • To ensure that development reflects design excellence in its presentation to the public realm.

2Permitted without consent

Building identification signs; Home-based child care; Home occupations

3Permitted with consent

Attached dwellings; Backpackers’ accommodation; Bed and breakfast accommodation; Boarding houses; Business identification signs; Centre-based child care facilities; Community facilities; Emergency services facilities; Environmental facilities; Environmental protection works; Exhibition homes; Exhibition villages; Flood mitigation works; Group homes; Home businesses; Home industries; Information and education facilities; Kiosks; Multi dwelling housing; Neighbourhood shops; Oyster aquaculture; Places of public worship; Recreation areas; Recreation facilities (indoor); Recreation facilities (outdoor); Residential accommodation; Respite day care centres; Roads; Seniors housing; Tank-based aquaculture; Water storage facilities

4Prohibited

Rural workers’ dwellings; Any other development not specified in item 2 or 3

Zone R4High Density Residential1Objectives of zone
  • To provide for the housing needs of the community within a high density residential environment.

  • To provide a variety of housing types within a high density residential environment.

  • To enable other land uses that provide facilities or services to meet the day to day needs of residents.

  • To ensure that high density residential environments are of a high visual quality in their presentation to public streets and spaces.

  • To provide for associated infrastructure that supports the changing housing needs of the population that is consistent with local character.

  • To encourage active living through the provision of healthy, walkable, green and safe built environments and streets, greener connections and walking and cycling infrastructure.

  • To ensure that development reflects design excellence in its presentation to the public realm.

2Permitted without consent

Building identification signs; Home-based child care; Home occupations

3Permitted with consent

Bed and breakfast accommodation; Boarding houses; Business identification signs; Centre-based child care facilities; Community facilities; Emergency services facilities; Environmental facilities; Environmental protection works; Flood mitigation works; Home businesses; Home industries; Kiosks; Local distribution premises; Neighbourhood shops; Oyster aquaculture; Places of public worship; Recreation areas; Residential accommodation; Residential flat buildings; Respite day care centres; Roads; Shop top housing; Water storage facilities

4Prohibited

Dual occupancies; Dwelling houses; Rural workers’ dwellings; Any other development not specified in item 2 or 3

Zone R5Large Lot Residential1Objectives of zone
  • To provide residential housing in a rural setting while preserving, and minimising impacts on, environmentally sensitive locations and scenic quality.

  • To ensure that large residential lots do not hinder the proper and orderly development of urban areas in the future.

  • To ensure that development in the area does not unreasonably increase the demand for public services or public facilities.

  • To minimise conflict between land uses within this zone and land uses within adjoining zones.

2Permitted without consent

Building identification signs; Extensive agriculture; Home-based child care; Home occupations

3Permitted with consent

Animal boarding or training establishments; Bed and breakfast accommodation; Bee keeping; Boat launching ramps; Business identification signs; Camping grounds; Cellar door premises; Centre-based child care facilities; Community facilities; Dual occupancies (attached); Dwelling houses; Eco-tourist facilities; Emergency services facilities; Entertainment facilities; Environmental facilities; Environmental protection works; Farm buildings; Farm stay accommodation; Flood mitigation works; Group homes; Home businesses; Home industries; Horticulture; Information and education facilities; Jetties; Kiosks; Neighbourhood shops; Oyster aquaculture; Places of public worship; Pond-based aquaculture; Recreation areas; Recreation facilities (indoor); Recreation facilities (outdoor); Research stations; Respite day care centres; Restaurants or cafes; Roads; Roadside stalls; Self-storage units; Tank-based aquaculture; Veterinary hospitals; Water recreation structures; Water storage facilities

4Prohibited

Any development not specified in item 2 or 3

Zone E1Local Centre1Objectives of zone
  • To provide a range of retail, business and community uses that serve the needs of people who live in, work in or visit the area.

  • To encourage investment in local commercial development that generates employment opportunities and economic growth.

  • To enable residential development that contributes to a vibrant and active local centre and is consistent with the Council’s strategic planning for residential development in the area.

  • To encourage business, retail, community and other non-residential land uses on the ground floor of buildings.

  • To provide a community hub for the surrounding neighbourhood.

  • To facilitate the development of neighbourhood-scale facilities and services that do not detract from the core commercial functions of the Coffs Harbour City Centre.

  • To ensure new buildings are consistent with the distinctive local character of the area and Local Character Statements.

  • To encourage active living through the provision of healthy, walkable, green and safe built environments and streets, greener connections and walking and cycling infrastructure.

  • To ensure development reflects design excellence and a high visual standard within the public domain.

2Permitted without consent

Building identification signs; Home businesses; Home occupations; Home-based child care

3Permitted with consent

Amusement centres; Boarding houses; Centre-based child care facilities; Commercial premises; Community facilities; Entertainment facilities; Function centres; High technology industries; Home industries; Hotel or motel accommodation; Information and education facilities; Local distribution premises; Medical centres; Multi dwelling housing; Oyster aquaculture; Places of public worship; Public administration buildings; Recreation facilities (indoor); Residential flat buildings; Respite day care centres; Service stations; Shop top housing; Tank-based aquaculture; Veterinary hospitals; Any other development not specified in item 2 or 4

4Prohibited

Agriculture; Air transport facilities; Airstrips; Animal boarding or training establishments; Boat building and repair facilities; Boat launching ramps; Boat sheds; Camping grounds; Caravan parks; Cemeteries; Charter and tourism boating facilities; Correctional centres; Crematoria; Depots; Eco-tourist facilities; Electricity generating works; Exhibition homes; Exhibition villages; Farm buildings; Forestry; Freight transport facilities; Heavy industrial storage establishments; Helipads; Highway service centres; Industrial retail outlets; Industrial training facilities; Industries; Jetties; Marinas; Mooring pens; Moorings; Mortuaries; Recreation facilities (major); Residential accommodation; Resource recovery facilities; Rural industries; Sewerage systems; Storage premises; Transport depots; Truck depots; Vehicle body repair workshops; Warehouse or distribution centres; Waste disposal facilities; Water recreation structures; Water treatment facilities; Wharf or boating facilities

Zone E2Commercial Centre1Objectives of zone
  • To strengthen the role of the commercial centre as the centre of business, retail, community and cultural activity.

  • To encourage investment in commercial development that generates employment opportunities and economic growth.

  • To encourage development that has a high level of accessibility and amenity, particularly for pedestrians.

  • To enable residential development only if it is consistent with the Council’s strategic planning for residential development in the area.

  • To ensure that new development provides diverse and active street frontages to attract pedestrian traffic and to contribute to vibrant, diverse and functional streets and public spaces.

  • To ensure the scale and nature of development reinforces the role of the Coffs Harbour City Centre as the principal business, office, cultural, civic, entertainment and retail hub, while supporting the objectives of other employment zones.

  • To ensure development makes a positive contribution to the streetscape through opportunities for improved pedestrian links, retention and creation of view corridors and the provision of a safe public domain.

  • To promote the Coffs Harbour City Centre for higher density living to provide for housing diversity and choice that supports the changing housing needs of the population.

  • To promote uses that activate and add to the vibrancy of the Coffs Harbour City Centre and contribute to the night-time economy.

  • To ensure development is consistent with the Coffs Harbour City Centre Masterplan.

  • To encourage active living through the provision of healthy, walkable, green and safe built environments and streets, greener connections and walking and cycling infrastructure.

  • To ensure development reflects design excellence and a high visual standard within the public domain.

2Permitted without consent

Building identification signs; Home businesses; Home occupations; Home-based child care

3Permitted with consent

Amusement centres; Artisan food and drink industries; Backpackers’ accommodation; Boarding houses; Centre-based child care facilities; Commercial premises; Community facilities; Entertainment facilities; Function centres; Group homes; Home industries; Hostels; Hotel or motel accommodation; Information and education facilities; Local distribution premises; Medical centres; Mortuaries; Oyster aquaculture; Passenger transport facilities; Places of public worship; Recreation areas; Recreation facilities (indoor); Recreation facilities (outdoor); Registered clubs; Residential flat buildings; Respite day care centres; Restricted premises; Shop top housing; Tank-based aquaculture; Vehicle repair stations; Veterinary hospitals; Any other development not specified in item 2 or 4

4Prohibited

Agriculture; Air transport facilities; Airstrips; Animal boarding or training establishments; Boat building and repair facilities; Boat launching ramps; Boat sheds; Camping grounds; Caravan parks; Cemeteries; Charter and tourism boating facilities; Correctional centres; Crematoria; Depots; Eco-tourist facilities; Electricity generating works; Exhibition homes; Exhibition villages; Farm buildings; Farm stay accommodation; Forestry; Freight transport facilities; Heavy industrial storage establishments; Helipads; Highway service centres; Industrial retail outlets; Industrial training facilities; Industries; Jetties; Marinas; Mooring pens; Moorings; Recreation facilities (major); Residential accommodation; Resource recovery facilities; Rural industries; Sewerage systems; Storage premises; Transport depots; Truck depots; Vehicle body repair workshops; Warehouse or distribution centres; Waste disposal facilities; Water recreation structures; Water treatment facilities; Wharf or boating facilities

Zone E3Productivity Support1Objectives of zone
  • To provide a range of facilities and services, light industries, warehouses and offices.

  • To provide for land uses that are compatible with, but do not compete with, land uses in surrounding local and commercial centres.

  • To maintain the economic viability of local and commercial centres by limiting certain retail and commercial activity.

  • To provide for land uses that meet the needs of the community, businesses and industries but that are not suited to locations in other employment zones.

  • To provide opportunities for new and emerging light industries.

  • To enable other land uses that provide facilities and services to meet the day to day needs of workers, to sell goods of a large size, weight or quantity or to sell goods manufactured on-site.

  • To encourage active living through the provision of healthy, walkable, green and safe built environments and streets, greener connections and walking and cycling infrastructure.

  • To ensure development reflects design excellence and a high visual standard within the public domain.

  • To facilitate the development of small-scale business uses that do not detract from the core commercial functions of the Coffs Harbour City Centre.

2Permitted without consent

Building identification signs; Home businesses; Home occupations; Home-based child care

3Permitted with consent

Animal boarding or training establishments; Attached dwellings; Boarding houses; Boat building and repair facilities; Business premises; Centre-based child care facilities; Community facilities; Depots; Dwelling houses; Function centres; Garden centres; Hardware and building supplies; Hotel or motel accommodation; Industrial retail outlets; Industrial training facilities; Information and education facilities; Kiosks; Landscaping material supplies; Light industries; Local distribution premises; Markets; Mortuaries; Multi dwelling housing; Neighbourhood shops; Office premises; Oyster aquaculture; Passenger transport facilities; Places of public worship; Plant nurseries; Recreation areas; Recreation facilities (indoor); Recreation facilities (major); Recreation facilities (outdoor); Research stations; Residential flat buildings; Respite day care centres; Restaurants or cafes; Rural supplies; Semi-detached dwellings; Service stations; Shop top housing; Specialised retail premises; Storage premises; Take away food and drink premises; Tank-based aquaculture; Timber yards; Vehicle body repair workshops; Vehicle repair stations; Vehicle sales or hire premises; Veterinary hospitals; Warehouse or distribution centres; Wholesale supplies; Any other development not specified in item 2 or 4

4Prohibited

Agriculture; Air transport facilities; Airstrips; Amusement centres; Boat launching ramps; Boat sheds; Camping grounds; Caravan parks; Cemeteries; Charter and tourism boating facilities; Correctional centres; Crematoria; Eco-tourist facilities; Electricity generating works; Entertainment facilities; Exhibition homes; Exhibition villages; Farm buildings; Forestry; Freight transport facilities; Heavy industrial storage establishments; Helipads; Highway service centres; Industries; Jetties; Marinas; Mooring pens; Moorings; Registered clubs; Residential accommodation; Resource recovery facilities; Restricted premises; Retail premises; Rural industries; Sewerage systems; Transport depots; Truck depots; Waste disposal facilities; Water recreation structures; Water treatment facilities; Wharf or boating facilities

Zone E4General Industrial1Objectives of zone
  • To provide a range of industrial, warehouse, logistics and related land uses.

  • To ensure the efficient and viable use of land for industrial uses.

  • To minimise any adverse effect of industry on other land uses.

  • To encourage employment opportunities.

  • To enable limited non-industrial land uses that provide facilities and services to meet the needs of businesses and workers.

  • To permit industrial uses that do not detract from the core commercial functions of the Coffs Harbour City Centre.

  • To encourage active living through the provision of healthy, walkable, green and safe built environments and streets, greener connections and walking and cycling infrastructure.

  • To ensure development reflects design excellence and a high visual standard within the public domain.

2Permitted without consent

Building identification signs; Home occupations

3Permitted with consent

Agricultural produce industries; Depots; Dwelling houses; Freight transport facilities; Funeral homes; Garden centres; General industries; Goods repair and reuse premises; Hardware and building supplies; Industrial retail outlets; Industrial training facilities; Kiosks; Landscaping material supplies; Light industries; Liquid fuel depots; Local distribution premises; Neighbourhood shops; Oyster aquaculture; Rural supplies; Take away food and drink premises; Tank-based aquaculture; Timber yards; Vehicle sales or hire premises; Warehouse or distribution centres; Any other development not specified in item 2 or 4

4Prohibited

Agriculture; Air transport facilities; Airstrips; Amusement centres; Boat launching ramps; Boat sheds; Camping grounds; Car parks; Caravan parks; Cemeteries; Centre-based child care facilities; Charter and tourism boating facilities; Commercial premises; Correctional centres; Eco-tourist facilities; Educational establishments; Exhibition homes; Exhibition villages; Farm buildings; Forestry; Health services facilities; Heavy industrial storage establishments; Heavy industries; Highway service centres; Information and education facilities; Jetties; Marinas; Mooring pens; Moorings; Recreation facilities (major); Registered clubs; Residential accommodation; Respite day care centres; Restricted premises; Rural industries; Tourist and visitor accommodation; Water recreation structures; Wharf or boating facilities

Zone E5Heavy Industrial1Objectives of zone
  • To provide areas for industries that need to be separated from other land uses.

  • To ensure the efficient and viable use of land for industrial uses.

  • To minimise any adverse effect of industry on other land uses.

  • To encourage employment opportunities.

  • To permit industrial uses that do not detract from the core commercial functions of the Coffs Harbour City Centre.

2Permitted without consent

Building identification signs

3Permitted with consent

Data centres; Depots; Freight transport facilities; General industries; Hazardous storage establishments; Heavy industries; Industrial training facilities; Kiosks; Landscaping material supplies; Offensive storage establishments; Oyster aquaculture; Rural supplies; Tank-based aquaculture; Warehouse or distribution centres; Any other development not specified in item 2 or 4

4Prohibited

Agriculture; Air transport facilities; Airstrips; Amusement centres; Animal boarding or training establishments; Boat launching ramps; Boat sheds; Camping grounds; Car parks; Caravan parks; Cemeteries; Centre-based child care facilities; Charter and tourism boating facilities; Commercial premises; Correctional centres; Crematoria; Eco-tourist facilities; Educational establishments; Entertainment facilities; Exhibition homes; Exhibition villages; Extractive industries; Farm buildings; Forestry; Function centres; Health services facilities; Helipads; Highway service centres; Home businesses; Home industries; Home occupations; Home occupations (sex services); Home-based child care; Information and education facilities; Jetties; Local distribution premises; Marinas; Mooring pens; Moorings; Mortuaries; Passenger transport facilities; Places of public worship; Public administration buildings; Recreation areas; Recreation facilities (indoor); Recreation facilities (major); Recreation facilities (outdoor); Registered clubs; Residential accommodation; Respite day care centres; Restricted premises; Self-storage units; Sex services premises; Tourist and visitor accommodation; Water recreation structures; Wharf or boating facilities

Zone MU1Mixed Use1Objectives of zone
  • To encourage a diversity of business, retail, office and light industrial land uses that generate employment opportunities.

  • To ensure that new development provides diverse and active street frontages to attract pedestrian traffic and to contribute to vibrant, diverse and functional streets and public spaces.

  • To minimise conflict between land uses within this zone and land uses within adjoining zones.

  • To encourage business, retail, community and other non-residential land uses on the ground floor of buildings.

  • To facilitate the development of a mix of local-scale facilities and services that do not detract from the core commercial functions of the Coffs Harbour City Centre.

  • To ensure development makes a positive contribution to the streetscape through opportunities for improved pedestrian links, retention and creation of view corridors and the provision of a safe public domain.

  • To provide for housing diversity and choice that supports the changing housing needs of the population.

  • To encourage active living through the provision of healthy, walkable, green and safe built environments and streets, greener connections and walking and cycling infrastructure.

  • To ensure development reflects design excellence and a high visual standard within the public domain.

2Permitted without consent

Building identification signs; Home businesses; Home occupations; Home-based child care

3Permitted with consent

Amusement centres; Boarding houses; Car parks; Centre-based child care facilities; Commercial premises; Community facilities; Entertainment facilities; Function centres; Hostels; Information and education facilities; Light industries; Local distribution premises; Medical centres; Multi dwelling housing; Oyster aquaculture; Passenger transport facilities; Places of public worship; Recreation areas; Recreation facilities (indoor); Registered clubs; Residential flat buildings; Respite day care centres; Restricted premises; Shop top housing; Tank-based aquaculture; Tourist and visitor accommodation; Vehicle repair stations; Any other development not specified in item 2 or 4

4Prohibited

Agriculture; Air transport facilities; Airstrips; Animal boarding or training establishments; Boat building and repair facilities; Boat launching ramps; Boat sheds; Camping grounds; Caravan parks; Cemeteries; Charter and tourism boating facilities; Correctional centres; Crematoria; Depots; Eco-tourist facilities; Electricity generating works; Exhibition homes; Exhibition villages; Farm buildings; Forestry; Freight transport facilities; Heavy industrial storage establishments; Helipads; Highway service centres; Industrial retail outlets; Industrial training facilities; Industries; Jetties; Marinas; Mooring pens; Moorings; Mortuaries; Recreation facilities (major); Residential accommodation; Resource recovery facilities; Rural industries; Sewerage systems; Storage premises; Transport depots; Truck depots; Vehicle body repair workshops; Warehouse or distribution centres; Waste disposal facilities; Water recreation structures; Water treatment facilities; Wharf or boating facilities

Zone SP1Special Activities1Objectives of zone
  • To provide for special land uses that are not provided for in other zones.

  • To provide for sites with special natural characteristics that are not provided for in other zones.

  • To facilitate development that is in keeping with the special characteristics of the site or its existing or intended special use, and that minimises any adverse impacts on surrounding land.

  • To encourage active living through the provision of healthy, walkable, green and safe built environments and streets, greener connections and walking and cycling infrastructure.

  • To ensure that development reflects design excellence and is of a high visual quality in its presentation to the public realm.

2Permitted without consent

Environmental facilities; Environmental protection works

3Permitted with consent

Aquaculture; Roads; The purpose shown on the Land Zoning Map, including any development that is ordinarily incidental or ancillary to development for that purpose

4Prohibited

Any development not specified in item 2 or 3

Zone SP2Infrastructure1Objectives of zone
  • To provide for infrastructure and related uses.

  • To prevent development that is not compatible with or that may detract from the provision of infrastructure.

  • To encourage active living through the provision of healthy, walkable, green and safe built environments and streets, greener connections and walking and cycling infrastructure.

2Permitted without consent

Environmental facilities; Environmental protection works

3Permitted with consent

Aquaculture; Roads; The purpose shown on the Land Zoning Map, including any development that is ordinarily incidental or ancillary to development for that purpose

4Prohibited

Any development not specified in item 2 or 3

Zone SP3Tourist1Objectives of zone
  • To provide for a variety of tourist-oriented development and related uses.

  • To encourage active living through the provision of healthy, walkable, green and safe built environments and streets, greener connections and walking and cycling infrastructure.

  • To ensure that development reflects design excellence and is of a high visual quality in its presentation to the public realm.

2Permitted without consent

Building identification signs

3Permitted with consent

Amusement centres; Aquaculture; Boat sheds; Camping grounds; Car parks; Caravan parks; Charter and tourism boating facilities; Community facilities; Eco-tourist facilities; Entertainment facilities; Environmental facilities; Environmental protection works; Flood mitigation works; Food and drink premises; Function centres; Helipads; Home businesses; Information and education facilities; Kiosks; Markets; Moorings; Recreation areas; Recreation facilities (indoor); Recreation facilities (major); Recreation facilities (outdoor); Research stations; Roads; Signage; Tourist and visitor accommodation; Water recycling facilities

4Prohibited

Any development not specified in item 2 or 3

Zone RE1Public Recreation1Objectives of zone
  • To enable land to be used for public open space or recreational purposes.

  • To provide a range of recreational settings and activities and compatible land uses.

  • To protect and enhance the natural environment for recreational purposes.

  • To encourage active living through the provision of healthy, walkable, green and safe built environments and streets, greener connections and walking and cycling infrastructure.

  • To ensure that development reflects design excellence and is of a high visual quality in its presentation to the public realm.

  • To provide places that are safe and welcoming, that meet the needs of a diverse population and facilitate equitable access.

  • To encourage places that reflect local character and identity and allow for cultural expression.

2Permitted without consent

Building identification signs

3Permitted with consent

Aquaculture; Boat launching ramps; Boat sheds; Business identification signs; Camping grounds; Caravan parks; Charter and tourism boating facilities; Community facilities; Eco-tourist facilities; Emergency services facilities; Environmental facilities; Environmental protection works; Flood mitigation works; Information and education facilities; Jetties; Kiosks; Markets; Recreation areas; Recreation facilities (indoor); Recreation facilities (major); Recreation facilities (outdoor); Research stations; Restaurants or cafes; Roads; Take away food and drink premises; Water recreation structures; Water supply systems

4Prohibited

Any development not specified in item 2 or 3

Zone RE2Private Recreation1Objectives of zone
  • To enable land to be used for private open space or recreational purposes.

  • To provide a range of recreational settings and activities and compatible land uses.

  • To protect and enhance the natural environment for recreational purposes.

  • To encourage active living through the provision of healthy, walkable, green and safe built environments and streets, greener connections and walking and cycling infrastructure.

  • To ensure that development reflects design excellence and is of a high visual quality in its presentation to the public realm.

2Permitted without consent

Building identification signs

3Permitted with consent

Amusement centres; Aquaculture; Boat launching ramps; Boat sheds; Business identification signs; Camping grounds; Caravan parks; Centre-based child care facilities; Charter and tourism boating facilities; Community facilities; Eco-tourist facilities; Electricity generating works; Emergency services facilities; Entertainment facilities; Environmental facilities; Environmental protection works; Flood mitigation works; Food and drink premises; Function centres; Helipads; Information and education facilities; Jetties; Kiosks; Markets; Places of public worship; Recreation areas; Recreation facilities (indoor); Recreation facilities (major); Recreation facilities (outdoor); Registered clubs; Research stations; Respite day care centres; Roads; Tourist and visitor accommodation; Veterinary hospitals; Water recreation structures; Water supply systems

4Prohibited

Any development not specified in item 2 or 3

Zone C1National Parks and Nature Reserves1Objectives of zone
  • To enable the management and appropriate use of land that is reserved under the National Parks and Wildlife Act 1974 or that is acquired under Part 11 of that Act.

  • To enable uses authorised under the National Parks and Wildlife Act 1974.

  • To identify land that is to be reserved under the National Parks and Wildlife Act 1974 and to protect the environmental significance of that land.

2Permitted without consent

Uses authorised under the National Parks and Wildlife Act 1974

3Permitted with consent

Nil

4Prohibited

Any development not specified in item 2 or 3

Zone C2Environmental Conservation1Objectives of zone
  • To protect, manage and restore areas of high ecological, scientific, cultural or aesthetic values.

  • To prevent development that could destroy, damage or otherwise have an adverse effect on those values.

2Permitted without consent

Building identification signs; Environmental protection works; Extensive agriculture; Home occupations

3Permitted with consent

Bed and breakfast accommodation; Bee keeping; Business identification signs; Camping grounds; Community facilities; Dwelling houses; Eco-tourist facilities; Emergency services facilities; Environmental facilities; Flood mitigation works; Home-based child care; Home businesses; Information and education facilities; Oyster aquaculture; Research stations; Roads

4Prohibited

Business premises; Hotel or motel accommodation; Industries; Local distribution premises; Multi dwelling housing; Pond-based aquaculture; Recreation facilities (major); Residential flat buildings; Restricted premises; Retail premises; Seniors housing; Service stations; Tank-based aquaculture; Warehouse or distribution centres; Any other development not specified in item 2 or 3

Zone C3Environmental Management1Objectives of zone
  • To protect, manage and restore areas with special ecological, scientific, cultural or aesthetic values.

  • To provide for a limited range of development that does not have an adverse effect on those values.

  • To provide opportunities to manage environmental risks and natural hazards.

  • To ensure that development occurs in a way that does not have a significant adverse effect on water catchments, including surface and groundwater quality and flows, land surface conditions and important ecosystems such as waterways.

2Permitted without consent

Building identification signs; Environmental protection works; Extensive agriculture; Home occupations

3Permitted with consent

Bed and breakfast accommodation; Bee keeping; Business identification signs; Camping grounds; Community facilities; Dwelling houses; Eco-tourist facilities; Emergency services facilities; Environmental facilities; Flood mitigation works; Home-based child care; Home businesses; Information and education facilities; Oyster aquaculture; Pond-based aquaculture; Research stations; Roads; Tank-based aquaculture

4Prohibited

Hotel or motel accommodation; Industries; Local distribution premises; Multi dwelling housing; Recreation facilities (major); Residential flat buildings; Restricted premises; Retail premises; Seniors housing; Service stations; Warehouse or distribution centres; Any other development not specified in item 2 or 3

Zone W1Natural Waterways1Objectives of zone
  • To protect the ecological and scenic values of natural waterways.

  • To prevent development that would have an adverse effect on the natural values of waterways in this zone.

  • To provide for sustainable fishing industries and recreational fishing.

2Permitted without consent

Nil

3Permitted with consent

Aquaculture; Boat launching ramps; Building identification signs; Business identification signs; Community facilities; Emergency services facilities; Environmental facilities; Environmental protection works; Flood mitigation works; Jetties; Moorings; Research stations; Roads; Water recreation structures

4Prohibited

Business premises; Hotel or motel accommodation; Industries; Local distribution premises; Multi dwelling housing; Recreation facilities (major); Residential flat buildings; Restricted premises; Retail premises; Seniors housing; Service stations; Warehouse or distribution centres; Any other development not specified in item 2 or 3

Zone W2Recreational Waterways1Objectives of zone
  • To protect the ecological, scenic and recreation values of recreational waterways.

  • To allow for water-based recreation and related uses.

  • To provide for sustainable fishing industries and recreational fishing.

  • To consider any marine park zoning plan and to limit or manage any uses that may have an adverse effect on the continued preservation of the park.

2Permitted without consent

Nil

3Permitted with consent

Aquaculture; Boat building and repair facilities; Boat launching ramps; Boat sheds; Building identification signs; Business identification signs; Charter and tourism boating facilities; Community facilities; Emergency services facilities; Environmental facilities; Environmental protection works; Flood mitigation works; Information and education facilities; Jetties; Kiosks; Marinas; Mooring pens; Moorings; Passenger transport facilities; Restaurants or cafes; Roads; Take away food and drink premises; Water recreation structures

4Prohibited

Industries; Local distribution premises; Multi dwelling housing; Residential flat buildings; Seniors housing; Warehouse or distribution centres; Any other development not specified in item 2 or 3

Zone W3Working Waterways1Objectives of zone
  • To enable the efficient movement and operation of commercial shipping, water-based transport and maritime industries.

  • To promote the equitable use of waterways, including appropriate recreational uses.

  • To minimise impacts on ecological values arising from the active use of waterways.

  • To provide for sustainable fishing industries.

2Permitted without consent

Nil

3Permitted with consent

Aquaculture; Boat building and repair facilities; Boat launching ramps; Boat sheds; Charter and tourism boating facilities; Community facilities; Emergency services facilities; Environmental facilities; Environmental protection works; Flood mitigation works; Freight transport facilities; Information and education facilities; Jetties; Marinas; Mooring pens; Moorings; Passenger transport facilities; Port facilities; Restaurants or cafes; Roads; Signage; Water recreation structures; Wharf or boating facilities

4Prohibited

Any development not specified in item 2 or 3

Zone W4Working Waterfront1Objectives of zone
  • To retain and encourage industrial and maritime activities on foreshores.

  • To identify sites for maritime purposes and for activities requiring direct foreshore access.

  • To ensure that development does not have an adverse impact on the environment and visual qualities of the foreshore.

  • To encourage employment opportunities.

  • To minimise any adverse effect of development on land uses in other zones.

  • To encourage active living through the provision of healthy, walkable, green and safe built environments and streets, greener connections and walking and cycling infrastructure.

  • To ensure development reflects design excellence and a high visual standard within the public domain.

2Permitted without consent

Building identification signs

3Permitted with consent

Aquaculture; Boat building and repair facilities; Boat launching ramps; Hotel or motel accommodation; Jetties; Kiosks; Light industries; Liquid fuel depots; Markets; Restaurants or cafes; Serviced apartments; Shops; Take away food and drink premises; Vehicle sales or hire premises; Any other development not specified in item 2 or 4

4Prohibited

Agriculture; Air transport facilities; Airstrips; Amusement centres; Animal boarding or training establishments; Camping grounds; Car parks; Caravan parks; Cemeteries; Centre-based child care facilities; Commercial premises; Correctional centres; Crematoria; Eco-tourist facilities; Educational establishments; Entertainment facilities; Exhibition homes; Exhibition villages; Farm buildings; Forestry; Function centres; Health services facilities; Heavy industrial storage establishments; Helipads; Highway service centres; Home businesses; Home occupations; Home occupations (sex services); Home-based child care; Industrial training facilities; Industries; Information and education facilities; Local distribution premises; Mortuaries; Places of public worship; Recreation areas; Recreation facilities (indoor); Recreation facilities (major); Recreation facilities (outdoor); Registered clubs; Residential accommodation; Resource recovery facilities; Respite day care centres; Restricted premises; Rural industries; Service stations; Sewerage systems; Sex services premises; Storage premises; Tourist and visitor accommodation; Transport depots; Truck depots; Vehicle body repair workshops; Vehicle repair stations; Veterinary hospitals; Warehouse or distribution centres; Waste disposal facilities

Part 3Exempt and complying development3.1Exempt development(1)

The objective of this clause is to identify development of minimal environmental impact as exempt development.

(2)

Development specified in Schedule 2 that meets the standards for the development contained in that Schedule and that complies with the requirements of this Part is exempt development.

(3)

To be exempt development, the development—

  • (a)

    must meet the relevant deemed-to-satisfy provisions of the Building Code of Australia or, if there are no such relevant provisions, must be structurally adequate, and

  • (b)

    must not, if it relates to an existing building, cause the building to contravene the Building Code of Australia, and

  • (c)

    must not be designated development, and

  • (d)

    must not be carried out on land that comprises, or on which there is, an item that is listed on the State Heritage Register under the Heritage Act 1977 or that is subject to an interim heritage order under the Heritage Act 1977.

(4)

Development that relates to an existing building that is classified under the Building Code of Australia as class 1b or class 2–9 is exempt development only if—

  • (a)

    the building has a current fire safety certificate or fire safety statement, or

  • (b)

    no fire safety measures are currently implemented, required or proposed for the building.

(5)

To be exempt development, the development must—

  • (a)

    be installed in accordance with the manufacturer’s specifications, if applicable, and

  • (b)

    not involve the removal, pruning or other clearing of vegetation that requires a permit, development consent or other approval unless it is undertaken in accordance with a permit, development consent or other approval.

Note—

See State Environmental Planning Policy (Biodiversity and Conservation) 2021, Chapter 2 and the Local Land Services Act 2013, Part 5A.

(6)

A heading to an item in Schedule 2 is part of that Schedule.

3.2Complying development(1)

The objective of this clause is to identify development as complying development.

(2)

Development specified in Part 1 of Schedule 3 that is carried out in compliance with—

  • (a)

    the development standards specified in relation to that development, and

  • (b)

    the requirements of this Part,

is complying development.

Note.

See also clause 5.8(3) which provides that the conversion of fire alarms is complying development in certain circumstances.

(3)

To be complying development, the development must—

  • (a)

    be permissible, with development consent, in the zone in which it is carried out, and

  • (b)

    meet the relevant deemed-to-satisfy provisions of the Building Code of Australia, and

  • (c)

    have an approval, if required by the Local Government Act 1993, from the Council for an on-site effluent disposal system if the development is undertaken on unsewered land.

(4)

A complying development certificate for development specified in Part 1 of Schedule 3 is subject to the conditions (if any) set out or referred to in Part 2 of that Schedule.

(5)

A heading to an item in Schedule 3 is part of that Schedule.

3.3Environmentally sensitive areas excluded(1)

Exempt or complying development must not be carried out on any environmentally sensitive area for exempt or complying development.

(2)

For the purposes of this clause—

environmentally sensitive area for exempt or complying development means any of the following—

  • (a)

    the coastal waters of the State,

  • (b)

    a coastal lake,

  • (c)

    land within the coastal wetlands and littoral rainforests area (within the meaning of the Coastal Management Act 2016),

  • (d)

    land reserved as an aquatic reserve under the Fisheries Management Act 1994 or as a marine park under the Marine Parks Act 1997,

  • (e)

    land within a wetland of international significance declared under the Ramsar Convention on Wetlands or within a World heritage area declared under the World Heritage Convention,

  • (f)

    land within 100 metres of land to which paragraph (c), (d) or (e) applies,

  • (g)

    land identified in this or any other environmental planning instrument as being of high Aboriginal cultural significance or high biodiversity significance,

  • (h)

    land reserved under the National Parks and Wildlife Act 1974 or land acquired under Part 11 of that Act,

  • (i)

    land reserved or dedicated under the Crown Land Management Act 2016 for the preservation of flora, fauna, geological formations or for other environmental protection purposes,

  • (j)

    land that is a declared area of outstanding biodiversity value under the Biodiversity Conservation Act 2016 or declared critical habitat under Part 7A of the Fisheries Management Act 1994,

  • (ja)

    land that has been used for the purposes of intensive agriculture (including a sheep or cattle dip), mining, waste or resource management facilities, hazardous industries (manufacture of chemicals), a service station or a hospital.

Part 4Principal development standards4.1Minimum subdivision lot size(1)

The objectives of this clause are as follows—

  • (a)

    to ensure that lot sizes have a practical and efficient layout to meet their intended use.

(2)

This clause applies to a subdivision of any land shown on the Lot Size Map that requires development consent and that is carried out after the commencement of this Plan.

(3)

The size of any lot resulting from a subdivision of land to which this clause applies is not to be less than the minimum size shown on the Lot Size Map in relation to that land.

(3A)

If a lot is a battle-axe lot or other lot with an access handle, the area of the access handle is not to be included in calculating the lot size.

(4)

This clause does not apply in relation to the subdivision of any land—

  • (a)

    by the registration of a strata plan or strata plan of subdivision under the Strata Schemes Development Act 2015, or

  • (b)

    by any kind of subdivision under the Community Land Development Act 2021.

4.1AAMinimum subdivision lot size for community title schemes(1)

The objectives of this clause are as follows—

  • (a)

    to ensure that land to which this clause applies is not fragmented by subdivisions that would create additional dwelling entitlements.

(2)

This clause applies to a subdivision (being a subdivision that requires development consent) under the Community Land Development Act 2021 of land in any of the following zones—

  • (a)

    Zone RU2 Rural Landscape,

  • (b)

    Zone R5 Large Lot Residential,

  • (c)

    Zone C2 Environmental Conservation,

  • (d)

    Zone C3 Environmental Management,

but does not apply to a subdivision by the registration of a strata plan.

(3)

The size of any lot resulting from a subdivision of land to which this clause applies (other than any lot comprising association property within the meaning of the Community Land Development Act 2021) is not to be less than the minimum size shown on the Lot Size Map in relation to that land.

(4)

This clause applies despite clause 4.1.

cl 4.1AA: Am 2019 (192), Sch 1 [3]; 2022 (829), Sch 1.6[6].

4.1AMinimum subdivision lot sizes for certain split zones(1)

The objectives of this clause are as follows—

  • (a)

    to provide for the subdivision of lots containing more than 1 zone,

  • (b)

    to ensure the subdivision occurs in a way that promotes suitable land use and development.

(2)

This clause applies to each lot (an original lot) containing land in—

  • (a)

    an employment, mixed use, recreation, residential, rural or special purpose zone or Zone W4 Working Waterfront, including land in one or more of those zones, and

  • (b)

    Zone C2 Environmental Conservation or Zone C3 Environmental Management, or both.

(3)

An original lot containing land in Zone RU2 Rural Landscape may be subdivided to create other lots (resulting lots) if—

  • (a)

    at least 1 resulting lot will contain—

    • (i)

      all of the land in Zone RU2 Rural Landscape that was in the original lot, and

    • (ii)

      if the original lot also contains land in a business, industrial, recreation, residential or special purpose zone—land in at least one of those zones with an area—

      • (A)

        for a residential zone—at least equal to the minimum lot size, or

      • (B)

        otherwise—the consent authority is satisfied will be suitable for a land use permitted in the zone, and

  • (b)

    all other resulting lots, excluding the land in Zone C2 Environmental Conservation and Zone C3 Environmental Management, will have an area at least equal to the minimum lot size.

(4)

An original lot, other than a lot referred to in subclause (3), may be subdivided to create resulting lots if—

  • (a)

    for a resulting lot containing land in a residential zone—the land in the residential zone will have an area at least equal to the minimum lot size, or

  • (b)

    for a resulting lot containing land in a rural zone—the land in the rural zone will have an area at least equal to the minimum lot size, or

  • (c)

    for a resulting lot containing land in a business, industrial, recreation or special purpose zone or Zone W4 Working Waterfront—the consent authority is satisfied the area of the resulting lot, excluding the land in Zone C2 Environmental Conservation and Zone C3 Environmental Management, will be suitable for a land use permitted in the zone.

(5)

Development consent must not be granted to the subdivision of land under this clause unless the consent authority is satisfied the subdivision will not compromise the continued protection and long-term maintenance of all land in Zone C2 Environmental Conservation and Zone C3 Environmental Management in the resulting lots.

(6)

In this clause—

minimum lot size means the minimum lot size shown on the Lot Size Map for the land.

cl 4.1A: Am 2019 (192), Sch 1 [4]. Subst 2023 (124), Sch 1[1]. Am 2022 (829), Sch 1.6[7] [8].

4.1BMinimum lot size for dual occupancies in Zone R2(1)

The objective of this clause is to achieve planned residential density in Zone R2 Low Density Residential.

(2)

Development consent may be granted for development on a lot in Zone R2 Low Density Residential for the purpose of a dual occupancy if the area of the lot is at least 800 square metres.

(3)

If a lot is a battle-axe lot or other lot with an access handle, the area of the access handle is not to be included in calculating the lot size.

4.2Rural subdivision(1)

The objective of this clause is to provide flexibility in the application of standards for subdivision in rural zones to allow land owners a greater chance to achieve the objectives for development in the relevant zone.

(2)

This clause applies to the following rural zones—

  • (a)

    Zone RU1 Primary Production,

  • (b)

    Zone RU2 Rural Landscape,

  • (baa)

    Zone RU3 Forestry,

  • (c)

    Zone RU4 Primary Production Small Lots,

  • (d)

    Zone RU6 Transition.

Note.

When this Plan was made it did not include all of these zones.

(3)

Land in a zone to which this clause applies may, with development consent, be subdivided for the purpose of primary production to create a lot of a size that is less than the minimum size shown on the Lot Size Map in relation to that land.

(4)

However, such a lot cannot be created if an existing dwelling would, as the result of the subdivision, be situated on the lot.

(5)

A dwelling cannot be erected on such a lot.

Note.

A dwelling includes a rural worker’s dwelling (see definition of that term in the Dictionary).

4.2AExceptions to minimum subdivision lot sizes for certain rural subdivisions(1)

The objective of this clause is to enable the subdivision of land in rural areas to create lots of an appropriate size to meet the needs of current permissible uses other than for the purpose of dwelling houses or dual occupancies.

(2)

This clause applies to land in Zone RU2 Rural Landscape.

(3)

Land to which this clause applies may, with development consent, be subdivided to create a lot of a size that is less than the minimum size shown on the Lot Size Map in relation to that land, if the consent authority is satisfied that the use of the land after the subdivision will be the same use (other than a dwelling house or a dual occupancy) permitted under the existing development consent for the land.

(4)

Development consent must not be granted for the subdivision of land to which this clause applies unless the consent authority is satisfied that—

  • (a)

    the subdivision will not adversely affect the use of the surrounding land for agriculture, and

  • (b)

    the subdivision is necessary for the ongoing operation of the permissible use, and

  • (c)

    the subdivision will not increase rural land use conflict in the locality, and

  • (d)

    the subdivision is appropriate having regard to the natural and physical constraints affecting the land.

4.2BErection of dwelling houses on land in certain rural and conservation zones(1)

The objectives of this clause are as follows—

  • (a)

    to minimise unplanned rural residential development, and

  • (b)

    to enable the replacement of lawfully erected dwelling houses in rural and conservation zones.

(2)

This clause applies to land in the following zones—

  • (a)

    Zone RU2 Rural Landscape,

  • (b)

    Zone RU3 Forestry,

  • (c)

    Zone C2 Environmental Conservation,

  • (d)

    Zone C3 Environmental Management.

(3)

Development consent must not be granted for the erection of a dwelling house on land to which this clause applies unless the land—

  • (a)

    is a lot that is at least the minimum lot size shown on the Lot Size Map in relation to that land, or

  • (aa)

    is a lot created under this Plan, other than under clause 4.1A(3) or 4.2(3), or

  • (b)

    is a lot created before this Plan commenced and on which the erection of a dwelling house was permissible immediately before that commencement, or

  • (c)

    is a lot resulting from a subdivision for which development consent (or equivalent) was granted before this Plan commenced and on which the erection of a dwelling house would have been permissible if the plan of subdivision had been registered before that commencement, or

  • (d)

    is an existing holding, or

  • (e)

    would have been a lot or a holding referred to in paragraph (a), (aa), (b), (c) or (d) had it not been affected by—

    • (i)

      a minor realignment of its boundaries that did not create an additional lot, or

    • (ii)

      a subdivision creating or widening a public road or public reserve or for another public purpose, or

    • (iii)

      a consolidation with an adjoining public road or public reserve or for another public purpose.

Note.

A dwelling cannot be erected on a lot created under clause 9 of State Environmental Planning Policy (Rural Lands) 2008 or clause 4.2.

(4)

Development consent must not be granted under subclause (3) unless—

  • (a)

    no dwelling house has been erected on the land, and

  • (b)

    if a development application has been made for development for the purpose of a dwelling house on the land—the application has been refused or it was withdrawn before it was determined, and

  • (c)

    if development consent has been granted in relation to such an application—the consent has been surrendered or it has lapsed.

(5)

Development consent may be granted for the erection of a dwelling house on land to which this clause applies if there is a lawfully erected dwelling house on the land and the dwelling house to be erected is intended only to replace the existing dwelling house.

(6)

In this clause—

existing holding means land that—

  • (a)

    was a holding on—

    • (i)

      in relation to land to which Coffs Harbour City Local Environmental Plan 2000 applied—20 October 1967, or

    • (ii)

      in relation to land to which Ulmarra Local Environmental Plan 1992 applied—5 September 1969, and

  • (b)

    is a holding at the time the application for development consent referred to in subclause (3) is lodged,

whether or not there has been a change in the ownership of the holding since the relevant date mentioned in paragraph (a), and includes any other land adjoining that land acquired by the owner since that date.

holding means all adjoining land, even if separated by a road or railway, held by the same person or persons.

Note.

The owner in whose ownership all the land is at the time the application is lodged need not be the same person as the owner in whose ownership all the land was on the stated date.

cl 4.2B: Am 2016 (5), Sch 1 [3] [4]; 2019 (192), Sch 1 [5]; 2023 (124), Sch 1[2]; 2022 (829), Sch 1.6[6] [9].

4.2CMinimum subdivision lot size for strata plan schemes in certain rural, residential and conservation zones(1)

The objective of this clause is to ensure that land to which this clause applies is not fragmented by subdivisions that would create additional dwelling entitlements.

(2)

This clause applies to land in the following zones that is used, or is proposed to be used, for residential accommodation or tourist and visitor accommodation—

  • (a)

    Zone RU2 Rural Landscape,

  • (b)

    Zone R5 Large Lot Residential,

  • (c)

    Zone C2 Environmental Conservation,

  • (d)

    Zone C3 Environmental Management.

(3)

The size of any lot resulting from a subdivision of land to which this clause applies for a strata plan scheme (other than any lot comprising common property within the meaning of the Strata Schemes (Freehold Development) Act 1973 or Strata Schemes (Leasehold Development) Act 1986) is not to be less than the minimum size shown on the Lot Size Map in relation to that land.

Note.

Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that strata subdivision of a building in certain circumstances is specified complying development.

cl 4.2C: Am 2019 (192), Sch 1 [6]; 2022 (829), Sch 1.6[6] [9].

4.2DBoundary adjustments of land in certain rural, residential and conservation zones(1)

The objective of this clause is to facilitate boundary adjustments between lots if one or more lots do not meet the minimum lot size shown on the Lot Size Map in relation to that land and the objectives of the relevant zone can be achieved.

(2)

This clause applies to land in the following zones—

  • (a)

    Zone RU2 Rural Landscape,

  • (b)

    Zone R5 Large Lot Residential,

  • (c)

    Zone C2 Environmental Conservation,

  • (d)

    Zone C3 Environmental Management.

(3)

Despite clause 4.1, development consent may be granted to subdivide land by adjusting the boundary between adjoining lots if one or more lots do not meet the minimum lot size shown on the Lot Size Map in relation to that land, and the consent authority is satisfied that—

  • (a)

    the subdivision will not create additional lots or the opportunity for additional dwellings, and

  • (b)

    the number of dwellings or opportunities for dwellings on each lot after the subdivision will be the same as before the subdivision, and

  • (c)

    the potential for land use conflict will not be increased as a result of the subdivision, and

  • (d)

    if the land is in Zone RU2 Rural Landscape, the agricultural viability of the land will not be adversely affected as a result of the subdivision.

(4)

Before granting consent to development to which this clause applies the consent authority must be satisfied that the subdivision will not compromise the continued protection and long-term maintenance of any land in Zone C2 Environmental Conservation or Zone C3 Environmental Management.

cl 4.2D: Am 2019 (192), Sch 1 [7] [8]; 2022 (829), Sch 1.6[6] [9].

4.2EErection of dual occupancies (detached) in Zone RU2(1)

The objectives of this clause are as follows—

  • (a)

    to ensure that development is of a scale and nature that is compatible with the primary production potential, rural character and environmental capabilities of the land,

  • (b)

    to ensure that development consent is only granted to development for the purposes of a dual occupancy (detached) if issues such as access, siting, land suitability and potential impacts are addressed,

  • (c)

    to ensure that dual occupancies (detached) are located so as to share services and retain opportunities for agriculture on the remaining land.

(2)

Development consent must not be granted to development for the purpose of a dual occupancy (detached) on land in Zone RU2 Rural Landscape unless the consent authority is satisfied that—

  • (a)

    the development will not impair the use of the land (or adjacent land) for agriculture or rural industries, and

  • (b)

    each dwelling will use the same vehicular access to and from a public road, and

  • (c)

    any dwellings will be situated within 50 metres of each other, and

  • (d)

    the land is physically suitable for the development, and

  • (e)

    the land is capable of accommodating the on-site disposal and management of sewage for the development, and

  • (f)

    the development will not have an adverse impact on the scenic amenity or character of the rural environment.

(3)

Development consent must not be granted to development for the purposes of a dual occupancy (detached) on land in Zone RU2 Rural Landscape unless development consent for the erection of a dwelling house on that land may be granted in accordance with clause 4.2B.

semi-detached dwelling means a dwelling that is on its own lot of land and is attached to only one other dwelling.

Note.

Semi-detached dwellings are a type of residential accommodation—see the definition of that term in this Dictionary.

seniors housing means a building or place that is—

  • (a)

    a residential care facility, or

  • (b)

    a hostel within the meaning of State Environmental Planning Policy (Housing) 2021, Chapter 3, Part 5, or

  • (c)

    a group of independent living units, or

  • (d)

    a combination of any of the buildings or places referred to in paragraphs (a)–(c),

and that is, or is intended to be, used permanently for—

  • (e)

    seniors or people who have a disability, or

  • (f)

    people who live in the same household with seniors or people who have a disability, or

  • (g)

    staff employed to assist in the administration of the building or place or in the provision of services to persons living in the building or place,

but does not include a hospital.

Note.

Seniors housing is a type of residential accommodation—see the definition of that term in this Dictionary.

service station means a building or place used for the sale by retail of fuels and lubricants for motor vehicles, whether or not the building or place is also used for any one or more of the following—

  • (a)

    the ancillary sale by retail of spare parts and accessories for motor vehicles,

  • (b)

    the cleaning of motor vehicles,

  • (c)

    installation of accessories,

  • (d)

    inspecting, repairing and servicing of motor vehicles (other than body building, panel beating, spray painting, or chassis restoration),

  • (e)

    the ancillary retail selling or hiring of general merchandise or services or both.

serviced apartment means a building (or part of a building) providing self-contained accommodation to tourists or visitors on a commercial basis and that is regularly serviced or cleaned by the owner or manager of the building or part of the building or the owner’s or manager’s agents.

Note.

Serviced apartments are a type of tourist and visitor accommodation—see the definition of that term in this Dictionary.

sewage reticulation system means a building or place used for the collection and transfer of sewage to a sewage treatment plant or water recycling facility for treatment, or transfer of the treated waste for use or disposal, including associated—

  • (a)

    pipelines and tunnels, and

  • (b)

    pumping stations, and

  • (c)

    dosing facilities, and

  • (d)

    odour control works, and

  • (e)

    sewage overflow structures, and

  • (f)

    vent stacks.

Note.

Sewage reticulation systems are a type of sewerage system—see the definition of that term in this Dictionary.

sewage treatment plant means a building or place used for the treatment and disposal of sewage, whether or not the facility supplies recycled water for use as an alternative water supply.

Note.

Sewage treatment plants are a type of sewerage system—see the definition of that term in this Dictionary.

sewerage system means any of the following—

  • (a)

    biosolids treatment facility,

  • (b)

    sewage reticulation system,

  • (c)

    sewage treatment plant,

  • (d)

    water recycling facility,

  • (e)

    a building or place that is a combination of any of the things referred to in paragraphs (a)–(d).

sex services means sexual acts or sexual services in exchange for payment.

sex services premises means a brothel, but does not include home occupation (sex services).

shop means premises that sell merchandise such as groceries, personal care products, clothing, music, homewares, stationery, electrical goods or the like or that hire any such merchandise, and includes a neighbourhood shop and neighbourhood supermarket, but does not include food and drink premises or restricted premises.

Note.

Shops are a type of retail premises—see the definition of that term in this Dictionary.

shop top housing means one or more dwellings located above the ground floor of a building, where at least the ground floor is used for commercial premises or health services facilities.

Note.

Shop top housing is a type of residential accommodation—see the definition of that term in this Dictionary.

signage means any sign, notice, device, representation or advertisement that advertises or promotes any goods, services or events and any structure or vessel that is principally designed for, or that is used for, the display of signage, and includes any of the following—

  • (a)

    an advertising structure,

  • (b)

    a building identification sign,

  • (c)

    a business identification sign,

but does not include a traffic sign or traffic control facilities.

site area means the area of any land on which development is or is to be carried out. The land may include the whole or part of one lot, or more than one lot if they are contiguous to each other, but does not include the area of any land on which development is not permitted to be carried out under this Plan.

Note.

The effect of this definition is varied by clause 4.5 for the purpose of the determination of permitted floor space area for proposed development.

site coverage means the proportion of a site area covered by buildings. However, the following are not included for the purpose of calculating site coverage—

  • (a)

    any basement,

  • (b)

    any part of an awning that is outside the outer walls of a building and that adjoins the street frontage or other site boundary,

  • (c)

    any eaves,

  • (d)

    unenclosed balconies, decks, pergolas and the like.

small bar means a small bar within the meaning of the Liquor Act 2007.

Note.

Small bars are a type of food and drink premises—see the definition of that term in this Dictionary.

spa pool has the same meaning as in the Swimming Pools Act 1992.

Note.

The term is defined to include any excavation, structure or vessel in the nature of a spa pool, flotation tank, tub or the like.

specialised retail premises means a building or place the principal purpose of which is the sale, hire or display of goods that are of a size, weight or quantity, that requires—

  • (a)

    a large area for handling, display or storage, or

  • (b)

    direct vehicular access to the site of the building or place by members of the public for the purpose of loading or unloading such goods into or from their vehicles after purchase or hire,

but does not include a building or place used for the sale of foodstuffs or clothing unless their sale is ancillary to the sale, hire or display of other goods referred to in this definition.

Note.

Examples of goods that may be sold at specialised retail premises include automotive parts and accessories, household appliances and fittings, furniture, homewares, office equipment, outdoor and recreation equipment, pet supplies and party supplies.

Specialised retail premises are a type of retail premises—see the definition of that term in this Dictionary.

stock and sale yard means a building or place that is used on a commercial basis for the purpose of offering livestock or poultry for sale and that may be used for the short-term storage and watering of stock.

Note.

Stock and sale yards are a type of rural industry—see the definition of that term in this Dictionary.

storage premises means a building or place used for the storage of goods, materials, plant or machinery for commercial purposes and where the storage is not ancillary to any industry, business premises or retail premises on the same parcel of land, and includes self-storage units, but does not include a heavy industrial storage establishment, local distribution premises or a warehouse or distribution centre.

storey means a space within a building that is situated between one floor level and the floor level next above, or if there is no floor above, the ceiling or roof above, but does not include—

  • (a)

    a space that contains only a lift shaft, stairway or meter room, or

  • (b)

    a mezzanine, or

  • (c)

    an attic.

Sun Access Protection Map means the Coffs Harbour Local Environmental Plan 2013 Sun Access Protection Map.

swimming pool has the same meaning as in the Swimming Pools Act 1992.

Note.

The term is defined as follows—

swimming pool means an excavation, structure or vessel—

  • (a)

    that is capable of being filled with water to a depth of 300 millimetres or more, and

  • (b)

    that is solely or principally used, or that is designed, manufactured or adapted to be solely or principally used, for the purpose of swimming, wading, paddling or any other human aquatic activity,

and includes a spa pool, but does not include a spa bath, anything that is situated within a bathroom or anything declared by the regulations made under the Swimming Pools Act 1992 not to be a swimming pool for the purposes of that Act.

take away food and drink premises means premises that are predominantly used for the preparation and retail sale of food or drink (or both) for immediate consumption away from the premises.

Note.

Take away food and drink premises are a type of food and drink premises—see the definition of that term in this Dictionary.

tank-based aquaculture means aquaculture undertaken exclusively in tanks, but not including natural water-based aquaculture.

Note.

Tank-based aquaculture is a type of aquaculture—see the definition of that term in this Dictionary. Typical tank-based aquaculture is the tank culture of barramundi or abalone.

telecommunications facility means—

  • (a)

    any part of the infrastructure of a telecommunications network, or

  • (b)

    any line, cable, optical fibre, fibre access node, interconnect point equipment, apparatus, tower, mast, antenna, dish, tunnel, duct, hole, pit, pole or other structure in connection with a telecommunications network, or

  • (c)

    any other thing used in or in connection with a telecommunications network.

telecommunications network means a system, or series of systems, that carries, or is capable of carrying, communications by means of guided or unguided electromagnetic energy, or both.

temporary structure has the same meaning as in the Act.

Note.

The term is defined as follows—

temporary structure includes a booth, tent or other temporary enclosure (whether or not part of the booth, tent or enclosure is permanent), and also includes a mobile structure.

Terrestrial Biodiversity Map means the Coffs Harbour Local Environmental Plan 2013 Terrestrial Biodiversity Map.

the Act means the Environmental Planning and Assessment Act 1979.

timber yard means a building or place the principal purpose of which is the sale of sawn, dressed or treated timber, wood fibre boards or similar timber products. It may include the cutting of such timber, boards or products to order and the sale of hardware, paint, tools and materials used in conjunction with the use and treatment of timber.

Note.

Timber yards are a type of retail premises—see the definition of that term in this Dictionary.

tourist and visitor accommodation means a building or place that provides temporary or short-term accommodation on a commercial basis, and includes any of the following—

  • (a)

    backpackers’ accommodation,

  • (b)

    bed and breakfast accommodation,

  • (c)

    farm stay accommodation,

  • (d)

    hotel or motel accommodation,

  • (e)

    serviced apartments,

but does not include—

  • (f)

    camping grounds, or

  • (g)

    caravan parks, or

  • (h)

    eco-tourist facilities.

transport depot means a building or place used for the parking or servicing of motor powered or motor drawn vehicles used in connection with a business, industry, shop or passenger or freight transport undertaking.

truck depot means a building or place used for the servicing and parking of trucks, earthmoving machinery and the like.

turf farming means the commercial cultivation of turf for sale and the removal of turf for that purpose.

Note.

Turf farming is a type of intensive plant agriculture—see the definition of that term in this Dictionary.

underground mining means—

  • (a)

    mining carried out beneath the earth’s surface, including bord and pillar mining, longwall mining, top-level caving, sub-level caving and auger mining, and

  • (b)

    shafts, drill holes, gas and water drainage works, surface rehabilitation works and access pits associated with that mining (whether carried out on or beneath the earth’s surface),

but does not include open cut mining.

urban release area means an area of land identified as “Urban Release Area” on the Urban Release Area Map.

Urban Release Area Map means the Coffs Harbour Local Environmental Plan 2013 Urban Release Area Map.

vehicle body repair workshop means a building or place used for the repair of vehicles or agricultural machinery, involving body building, panel building, panel beating, spray painting or chassis restoration.

vehicle repair station means a building or place used for the purpose of carrying out repairs to, or the selling and fitting of accessories to, vehicles or agricultural machinery, but does not include a vehicle body repair workshop or vehicle sales or hire premises.

vehicle sales or hire premises means a building or place used for the display, sale or hire of motor vehicles, caravans, boats, trailers, agricultural machinery and the like, whether or not accessories are sold or displayed there.

Note.

Vehicle sales or hire premises are a type of retail premises—see the definition of that term in this Dictionary.

veterinary hospital means a building or place used for diagnosing or surgically or medically treating animals, whether or not animals are kept on the premises for the purpose of treatment.

viticulture means the cultivation of grapes for use in the commercial production of fresh or dried fruit or wine.

Note.

Viticulture is a type of intensive plant agriculture—see the definition of that term in this Dictionary.

warehouse or distribution centre means a building or place used mainly or exclusively for storing or handling items (whether goods or materials) pending their sale, but from which no retail sales are made, but does not include local distribution premises.

waste disposal facility means a building or place used for the disposal of waste by landfill, incineration or other means, including such works or activities as recycling, resource recovery and other resource management activities, energy generation from gases, leachate management, odour control and the winning of extractive material to generate a void for disposal of waste or to cover waste after its disposal.

Note.

Waste disposal facilities are a type of waste or resource management facility—see the definition of that term in this Dictionary.

waste or resource management facility means any of the following—

  • (a)

    a resource recovery facility,

  • (b)

    a waste disposal facility,

  • (c)

    a waste or resource transfer station,

  • (d)

    a building or place that is a combination of any of the things referred to in paragraphs (a)–(c).

waste or resource transfer station means a building or place used for the collection and transfer of waste material or resources, including the receipt, sorting, compacting, temporary storage and distribution of waste or resources and the loading or unloading of waste or resources onto or from road or rail transport.

Note.

Waste or resource transfer stations are a type of waste or resource management facility—see the definition of that term in this Dictionary.

water recreation structure means a structure used primarily for recreational purposes that has a direct structural connection between the shore and the waterway, and may include a pier, wharf, jetty or boat launching ramp.

water recycling facility means a building or place used for the treatment of sewage effluent, stormwater or waste water for use as an alternative supply to mains water, groundwater or river water (including, in particular, sewer mining works), whether the facility stands alone or is associated with other development, and includes associated—

  • (a)

    retention structures, and

  • (b)

    treatment works, and

  • (c)

    irrigation schemes.

Note.

Water recycling facilities are a type of sewerage system—see the definition of that term in this Dictionary.

water reticulation system means a building or place used for the transport of water, including pipes, tunnels, canals, pumping stations, related electricity infrastructure and dosing facilities.

Note.

Water reticulation systems are a type of water supply system—see the definition of that term in this Dictionary.

water storage facility means a dam, weir or reservoir for the collection and storage of water, and includes associated monitoring or gauging equipment.

Note.

Water storage facilities are a type of water supply system—see the definition of that term in this Dictionary.

water supply system means any of the following—

  • (a)

    a water reticulation system,

  • (b)

    a water storage facility,

  • (c)

    a water treatment facility,

  • (d)

    a building or place that is a combination of any of the things referred to in paragraphs (a)–(c).

water treatment facility means a building or place used for the treatment of water (such as a desalination plant or a recycled or reclaimed water plant) whether the water produced is potable or not, and includes residuals treatment, storage and disposal facilities, but does not include a water recycling facility.

Note.

Water treatment facilities are a type of water supply system—see the definition of that term in this Dictionary.

waterbody means a waterbody (artificial) or waterbody (natural).

waterbody (artificial) or artificial waterbody means an artificial body of water, including any constructed waterway, canal, inlet, bay, channel, dam, pond, lake or artificial wetland, but does not include a dry detention basin or other stormwater management construction that is only intended to hold water intermittently.

waterbody (natural) or natural waterbody means a natural body of water, whether perennial or intermittent, fresh, brackish or saline, the course of which may have been artificially modified or diverted onto a new course, and includes a river, creek, stream, lake, lagoon, natural wetland, estuary, bay, inlet or tidal waters (including the sea).

watercourse means any river, creek, stream or chain of ponds, whether artificially modified or not, in which water usually flows, either continuously or intermittently, in a defined bed or channel, but does not include a waterbody (artificial).

waterway means the whole or any part of a watercourse, wetland, waterbody (artificial) or waterbody (natural).

wetland means—

  • (a)

    natural wetland, including marshes, mangroves, backwaters, billabongs, swamps, sedgelands, wet meadows or wet heathlands that form a shallow waterbody (up to 2 metres in depth) when inundated cyclically, intermittently or permanently with fresh, brackish or salt water, and where the inundation determines the type and productivity of the soils and the plant and animal communities, or

  • (b)

    artificial wetland, including marshes, swamps, wet meadows, sedgelands or wet heathlands that form a shallow waterbody (up to 2 metres in depth) when inundated cyclically, intermittently or permanently with water, and are constructed and vegetated with wetland plant communities.

wharf or boating facilities means a wharf or any of the following facilities associated with a wharf or boating that are not port facilities—

  • (a)

    facilities for the embarkation or disembarkation of passengers onto or from any vessels, including public ferry wharves,

  • (b)

    facilities for the loading or unloading of freight onto or from vessels and associated receival, land transport and storage facilities,

  • (c)

    wharves for commercial fishing operations,

  • (d)

    refuelling, launching, berthing, mooring, storage or maintenance facilities for any vessel,

  • (e)

    sea walls or training walls,

  • (f)

    administration buildings, communication, security and power supply facilities, roads, rail lines, pipelines, fencing, lighting or car parks.

wholesale supplies means a building or place used for the display, sale or hire of goods or materials by wholesale only to businesses that have an Australian Business Number registered under the A New Tax System (Australian Business Number) Act 1999 of the Commonwealth.

Dictionary: Am 2018 (398), Sch 1 [2]; 2019 (653), Sch 1[3]; 2022 (32), Sch 1[39]; 2023 (435), cl 5(2).

Maps: Am 2014 (168), cl 4; 2015 (268), cl 4; 2015 (377), cl 4; 2015 (535), cl 4; 2016 (5), cl 4; 2016 (786), cl 4; 2017 (196), cl 4; 2017 (692), cl 4; 2018 (4), cl 4; 2018 (27), cl 4; 2018 (28), cl 4; 2018 (398), cl 4; 2018 (547), cl 4; 2018 (631), cl 4; 2018 (694), cl 4; 2019 (192), cl 4; 2019 (653), cl 4; 2020 (45), cl 4; 2020 (112), cl 4; 2020 (417), cl 4; 2020 (783), cl 4; 2021 (84), cl 4; 2021 (201), cl 4. Entries discontinued from July 2021 when responsibility for map updates moved to Department of Planning, Industry and Environment.

Historical notesTable of amending instruments

Coffs Harbour Local Environmental Plan 2013 (564). LW 27.9.2013. Date of commencement, on publication on LW, cl 1.1AA. This Plan has been amended as follows—

2013

No 111

Statute Law (Miscellaneous Provisions) Act (No 2) 2013. Assented to 3.12.2013.

Date of commencement of Sch 3.27, 10.1.2014, Sch 3.27.

2014

(168)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 1). LW 4.4.2014.

Date of commencement, on publication on LW, cl 2.

No 33

Statute Law (Miscellaneous Provisions) Act 2014. Assented to 24.6.2014.

Date of commencement of Sch 2.36, 14.7.2014, Sch 2.36.

(513)

Standard Instrument (Local Environmental Plans) Amendment Order 2014. LW 15.8.2014.

Date of commencement, on publication on LW, cl 2.

2015

(268)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 3). LW 5.6.2015.

Date of commencement, on publication on LW, cl 2.

No 15

Statute Law (Miscellaneous Provisions) Act 2015. Assented to 29.6.2015.

Date of commencement of Sch 3, 15.7.2015, sec 2 (3).

(377)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 2). LW 10.7.2015.

Date of commencement, on publication on LW, cl 2.

(535)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 4). LW 4.9.2015.

Date of commencement, on publication on LW, cl 2.

2016

(5)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 5). LW 8.1.2016.

Date of commencement, on publication on LW, cl 2.

(43)

Standard Instrument (Local Environmental Plans) Amendment (Maps) Order 2016. LW 27.1.2016.

Date of commencement, 27.1.2016, cl 2.

(126)

Standard Instrument (Local Environmental Plans) Amendment Order 2016. LW 11.3.2016.

Date of commencement, on publication on LW, cl 2.

(309)

Standard Instrument (Local Environmental Plans) Amendment (Observatory and Defence Facility) Order 2016. LW 10.6.2016.

Date of commencement, 56 days after publication on LW, cl 2.

(310)

State Environmental Planning Policy (Integration and Repeals) 2016. LW 10.6.2016.

Date of commencement, 56 days after publication on LW, cl 2.

(786)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 6). LW 16.12.2016.

Date of commencement, on publication on LW, cl 2.

2017

(196)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 7). LW 19.5.2017.

Date of commencement, on publication on LW, cl 2.

(453)

Standard Instrument (Local Environmental Plans) Amendment (Vegetation) Order 2017. LW 25.8.2017.

Date of commencement, 25.8.2017, cl 2.

(492)

Standard Instrument (Local Environmental Plans) Amendment (Child Care) Order 2017. LW 1.9.2017.

Date of commencement, on publication on LW, cl 2.

(493)

State Environmental Planning Policy Amendment (Child Care) 2017. LW 1.9.2017.

Date of commencement, on publication on LW, cl 2.

(692)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 11). LW 8.12.2017.

Date of commencement, on publication on LW, cl 2.

2018

(4)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 12). LW 12.1.2018.

Date of commencement, on publication on LW, cl 2.

(27)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 9). LW 9.2.2018.

Date of commencement, on publication on LW, cl 2.

(28)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 10). LW 9.2.2018.

Date of commencement, on publication on LW, cl 2.

(105)

Standard Instrument (Local Environmental Plans) Amendment (Coastal Management) Order 2018. LW 23.3.2018.

Date of commencement, 3.4.2018, cl 2.

(154)

Standard Instrument (Local Environmental Plans) Amendment (Minimum Subdivision Lot Size) Order 2018. LW 20.4.2018.

Date of commencement, on publication on LW, cl 2.

No 40

Forestry Legislation Amendment Act 2018. Assented to 27.6.2018.

Date of commencement of Sch 3.12, 9.11.2018, sec 2 and 2018 (620) LW 9.11.2018.

(398)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 8). LW 27.7.2018.

Date of commencement, on publication on LW, cl 2.

(404)

Standard Instrument (Local Environmental Plans) Amendment (Artisan Food and Drink Industries) Order 2018. LW 27.7.2018.

Date of commencement, on publication on LW, cl 2.

(405)

Standard Instrument (Local Environmental Plans) Amendment (Garden Centres) Order 2018. LW 27.7.2018.

Date of commencement, on publication on LW, cl 2.

(406)

State Environmental Planning Policy Amendment (Artisan Food and Drink Industries) 2018. LW 27.7.2018.

Date of commencement, on publication on LW, cl 2.

(477)

Standard Instrument (Local Environmental Plans) Amendment (Land Use Terms) Order 2018. LW 29.8.2018.

Date of commencement, 31.8.2018, cl 2.

(488)

State Environmental Planning Policy Amendment (Land Use Terms) 2018. LW 29.8.2018.

Date of commencement of Sch 1.2, 31.8.2018, cl 2 (1).

(514)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 13). LW 31.8.2018.

Date of commencement, on publication on LW, cl 2.

(547)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 14). LW 21.9.2018.

Date of commencement, on publication on LW, cl 2.

No 46

Children (Education and Care Services) Supplementary Provisions Amendment Act 2018. Assented to 27.9.2018.

Date of commencement of Sch 2.3, 31.10.2019, sec 2(1) and 2019 (200) LW 24.5.2019.

(631)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 15). LW 9.11.2018.

Date of commencement, on publication on LW, cl 2.

(694)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 16). LW 30.11.2018.

Date of commencement, on publication on LW, cl 2.

(717)

Standard Instrument (Local Environmental Plans) Amendment (Greater Sydney Commission) Order 2018. LW 7.12.2018.

Date of commencement, 10.12.2018, cl 2.

2019

(1)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 17). LW 11.1.2019.

Date of commencement, on publication on LW, cl 2.

(133)

Standard Instrument (Local Environmental Plans) Amendment (Primary Production and Rural Development) Order 2019. LW 28.2.2019.

Date of commencement, on publication on LW, cl 2.

(137)

State Environmental Planning Policy (Primary Production and Rural Development) 2019. LW 28.2.2019.

Date of commencement, on publication on LW, cl 2.

(192)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 18). LW 10.5.2019.

Date of commencement, on publication on LW, cl 2.

(620)

Standard Instrument (Local Environmental Plans) Amendment Order 2019. LW 13.12.2019.

Date of commencement, 15.1.2020, cl 2.

(621)

State Environmental Planning Policy Amendment (Miscellaneous) 2019. LW 13.12.2019.

Date of commencement of Sch 5, 15.1.2020, cl 2(1).

(653)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 19). LW 20.12.2019.

Date of commencement, on publication on LW, cl 2.

2020

(45)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 21). LW 14.2.2020.

Date of commencement, on publication on LW, cl 2.

(112)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 20). LW 27.3.2020.

Date of commencement, on publication on LW, cl 2.

(155)

Standard Instrument (Local Environmental Plans) Amendment (Energy Storage Technology) Order 2020. LW 17.4.2020.

Date of commencement, on publication on LW, cl 2.

(417)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 22). LW 17.7.2020.

Date of commencement, on publication on LW, cl 2.

No 30

Statute Law (Miscellaneous Provisions) Act 2020. Assented to 27.10.2020.

Date of commencement of amendments made by Sch 4, 22.1.2021, sec 2(4).

(636)

Standard Instrument (Local Environmental Plans) Amendment (Definitions) Order 2020. LW 28.10.2020.

Date of commencement, 28.10.2020, cl 2.

No 40

Liquor Amendment (Night-time Economy) Act 2020. Assented to 27.11.2020.

Date of commencement of Schs 4.6 and 7, 11.12.2020, sec 2(1) and 2020 (713) LW 11.12.2020.

(762)

Standard Instrument (Local Environmental Plans) Amendment (Secondary Dwellings) Order 2020. LW 18.12.2020.

Date of commencement, 1.2.2021, cl 2.

(783)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 23). LW 23.12.2020.

Date of commencement, on publication on LW, cl 2.

2021

(84)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 24). LW 26.2.2021.

Date of commencement, on publication on LW, cl 2.

No 6

Community Land Development Act 2021. Assented to 26.3.2021.

Date of commencement, 1.12.2021, sec 2 and 2021 (598) LW 14.10.2021.

(201)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 25). LW 30.4.2021.

Date of commencement, on publication on LW, cl 2.

(225)

State Environmental Planning Policy Amendment (Flood Planning) 2021. LW 14.5.2021.

Date of commencement, 14.7.2021, cl 2.

(226)

Standard Instrument (Local Environmental Plans) Amendment (Flood Planning) Order 2021. LW 14.5.2021.

Date of commencement, 14.7.2021, cl 2.

(301)

Standard Instrument (Local Environmental Plans) Amendment (Natural Disasters) Order 2021. LW 18.6.2021.

Date of commencement, 23.6.2021, cl 2.

(650)

Standard Instrument (Local Environmental Plans) Amendment (Land Use Zones) Order 2021. LW 5.11.2021.

Date of commencement of Sch 1[1]–[15] [17] [19] [23]–[48] and [50]–[53] and Sch 2, 1.12.2021, cl 2(1); date of commencement of Sch 1[16] [18] [20]–[22] [49] [54] and [55], 30.6.2022, cl 2(1A); date of commencement of Sch 3, 26.4.2023, cl 2(2). Amended by Standard Instrument (Local Environmental Plans) Further Amendment (Land Use Zones) Order 2021 (712). LW 26.11.2021. Date of commencement, on publication on LW, cl 2. Amended by Standard Instrument (Local Environmental Plans) Amendment (Land Use Zones) Order 2022 (726). LW 30.11.2022. Date of commencement, on publication on LW, cl 2.

(711)

Standard Instrument (Local Environmental Plans) Amendment (Miscellaneous) Order 2021. LW 26.11.2021.

Date of commencement, on publication on LW, cl 2.

(714)

State Environmental Planning Policy (Housing) 2021. LW 26.11.2021.

Date of commencement, on publication on LW, sec 2.

2022

(32)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 31). LW 11.2.2022.

Date of commencement, on publication on LW, cl 2.

(71)

Standard Instrument (Local Environmental Plans) Amendment (SEPPs) Order 2022. LW 4.3.2022.

Date of commencement, 9.3.2022, cl 2.

(130)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 26). LW 1.4.2022.

Date of commencement, on publication on LW, cl 2.

(314)

State Environmental Planning Policy Amendment (Local Distribution Premises) 2022. LW 24.6.2022.

Date of commencement, 30.6.2022, sec 2.

(344)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 27). LW 1.7.2022.

Date of commencement, on publication on LW, cl 2.

(567)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 28). LW 23.9.2022.

Date of commencement, on publication on LW, cl 2.

(592)

Standard Instrument (Local Environmental Plans) Amendment (Agritourism) Order 2022. LW 6.10.2022.

Date of commencement, 1.12.2022, cl 2.

(628)

Standard Instrument (Local Environmental Plans) Amendment (Canal Estate Development and Public Bushland) Order 2022. LW 21.10.2022.

Date of commencement, 21.11.2022, cl 2.

(829)

State Environmental Planning Policy Amendment (Land Use Zones) (No 3) 2022. LW 16.12.2022.

Date of commencement, 26.4.2023, sec 2. The amendment made by Sch 1.6[6] to cl 4.1A(2)(b) and (4) was without effect as the text to be amended did not appear in that clause. The amendment made by Sch 1.6[6] to cl 4.1A(3)(c) was without effect as the paragraph did not appear in that clause.

2023

(124)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 30). LW 10.3.2023.

Date of commencement, on publication on LW, cl 2.

(435)

Coffs Harbour Local Environmental Plan 2013 (Amendment No 29). LW 4.8.2023.

Date of commencement, on publication on LW, cl 2.

(458)

State Environmental Planning Policy Amendment (Agritourism) 2023. LW 18.8.2023.

Date of commencement, on publication on LW, sec 2.

(522)

Standard Instrument (Local Environmental Plans) Amendment (Exceptions to Development Standards) Order 2023. LW 15.9.2023.

Date of commencement, 1.11.2023, cl 2.

(554)

State Environmental Planning Policy Amendment (Housing and Productivity Contributions) 2023. LW 29.9.2023.

Date of commencement, 1.10.2023, sec 2.

(608)

Standard Instrument (Local Environmental Plans) Amendment (Flood Planning) Order 2023. LW 10.11.2023.

Date of commencement, on publication on LW, cl 2.

(609)

State Environmental Planning Policy Amendment (Flood Planning) 2023. LW 10.11.2023.

Date of commencement, on publication on LW, sec 2.

2025

(511)

Standard Instrument (Local Environmental Plans) Amendment (Group Homes) Order 2025. LW 19.9.2025.

Date of commencement, on publication on LW, cl 2.

Table of amendments

No reference is made to certain amendments made consequential on the amendment of the Standard Instrument (Local Environmental Plans) Order 2006.

Cl 1.2

Am 2022 (32), Sch 1[1]; 2022 (829), Sch 1.6[1].

Cl 1.3

Am 2020 (45), cl 5(1).

Cl 1.8

Am 2020 (45), cl 5(2) (3).

Cl 1.8A

Am 2019 (621), Sch 5[1]; 2023 (609), Sch 1.1[1].

Cl 1.8B

Rep 2016 (310), Sch 4.8 [1].

Cl 1.9

Am 2016 (310), Sch 4.8 [2].

Cl 1.9A

Am 2019 (621), Sch 5[2]–[4].

Cl 2.1

Am 2019 (192), Sch 1 [1]; 2022 (829), Sch 1.6[2] [3].

Land Use Table

Am 2016 (5), Sch 1 [1] [2]; 2017 (493), Sch 1.1 [1] [2]; 2018 (514), Sch 1 [1]; 2019 (137), Sch 6 [1]; 2019 (192), Sch 1 [2]; 2021 (714), Sch 10.5; 2022 (32), Sch 1[2]–[34]; 2022 (314), Sch 1; 2022 (829), Sch 1.6[4] [5].

Cl 4.1AA

Am 2019 (192), Sch 1 [3]; 2022 (829), Sch 1.6[6].

Cl 4.1A

Am 2019 (192), Sch 1 [4]. Subst 2023 (124), Sch 1[1]. Am 2022 (829), Sch 1.6[7] [8].

Cl 4.2B

Am 2016 (5), Sch 1 [3] [4]; 2019 (192), Sch 1 [5]; 2023 (124), Sch 1[2]; 2022 (829), Sch 1.6[6] [9].

Cl 4.2C

Am 2019 (192), Sch 1 [6]; 2022 (829), Sch 1.6[6] [9].

Cl 4.2D

Am 2019 (192), Sch 1 [7] [8]; 2022 (829), Sch 1.6[6] [9].

Cl 4.2E

Ins 2018 (514), Sch 1 [2].

Cl 4.4

Am 2019 (653), Sch 1[1].

Cl 4.6

Am 2022 (829), Sch 1.6[10].

Cl 5.3

Am 2022 (829), Sch 1.6[10] [11].

Cl 5.4

Am 2018 (406), Sch 1.35 [1] [2].

Cl 5.22

Subst 2023 (609), Sch 1.1[2].

Cl 5.24

Subst 2023 (458), Sch 1[4].

Cl 5.25

Subst 2023 (458), Sch 1[4].

Cl 6.1

Am 2019 (621), Sch 5[5]; 2023 (554), Sch 1.

Cl 7.2

Am 2022 (32), Sch 1[35].

Cl 7.3

Rep 2021 (225), Sch 1.

Cl 7.6A

Ins 2018 (27), Sch 1 [1].

Cl 7.7

Rep 2023 (435), cl 5(1).

Cl 7.12

Am 2021 (84), Sch 1[1] [2]; 2022 (829), Sch 1.6[12].

Cl 7.13

Am 2022 (32), Sch 1[36]–[38].

Cl 7.14

Am 2022 (829), Sch 1.6[13]–[16].

Cl 7.15

Am 2022 (829), Sch 1.6[17] [18].

Cl 7.16

Am 2022 (829), Sch 1.6[19] [20].

Cl 7.17

Am 2017 (493), Sch 1.2 [1]; 2022 (829), Sch 1.6[21].

Cl 7.18

Ins 2016 (5), Sch 1 [5]. Am 2019 (192), Sch 1 [9]; 2022 (829), Sch 1.6[6].

Cl 7.19

Ins 2018 (398), Sch 1 [1]. Subst 2020 (783), Sch 1. Am 2022 (344), cl 5(1)–(3).

Cl 7.20

Ins 2019 (653), Sch 1[2].

Cl 7.21

Ins 2019 (653), Sch 1[2]. Am 2022 (829), Sch 1.6[22].

Sch 1

Am 2016 (5), Sch 1 [6] [7]; 2016 (786), cl 5; 2017 (692), cl 5; 2018 (4), cl 5; 2018 (28), cl 5; 2018 (488), Sch 1.2; 2022 (130), cl 5; 2022 (567), cl 4; 2022 (829), Sch 1.6[23] [24].

Sch 2

Am 2019 (192), Sch 1 [10]; 2022 (829), Sch 1.6[25]–[29].

Sch 4

Am 2019 (1), cl 4.

Sch 5

Am 2016 (5), Sch 1 [8]–[10]; 2018 (27), Sch 1 [2]–[5]; 2018 (694), cl 5; 2021 (84), Sch 1[3] [4].

Dictionary

Am 2018 (398), Sch 1 [2]; 2019 (653), Sch 1[3]; 2022 (32), Sch 1[39]; 2023 (435), cl 5(2).

Maps

Am 2014 (168), cl 4; 2015 (268), cl 4; 2015 (377), cl 4; 2015 (535), cl 4; 2016 (5), cl 4; 2016 (786), cl 4; 2017 (196), cl 4; 2017 (692), cl 4; 2018 (4), cl 4; 2018 (27), cl 4; 2018 (28), cl 4; 2018 (398), cl 4; 2018 (547), cl 4; 2018 (631), cl 4; 2018 (694), cl 4; 2019 (192), cl 4; 2019 (653), cl 4; 2020 (45), cl 4; 2020 (112), cl 4; 2020 (417), cl 4; 2020 (783), cl 4; 2021 (84), cl 4; 2021 (201), cl 4. Entries discontinued from July 2021 when responsibility for map updates moved to Department of Planning, Industry and Environment.

Actions
Download as PDF Download as Word Document


Cases Citing This Decision

0

Cases Cited

0

Statutory Material Cited

0