DISTRICT COURT OF QUEENSLAND
CITATION: | Christian Education Ministries – Qld Ltd v Thomson Adsett Pty Ltd [2015] QDC 292 |
PARTIES: | CHRISTIAN EDUCATION MINISTRIES – QLD LTD ACN 125 183 637 (plaintiff) v THOMSON ADSETT PTY LTD ACN 105 314 654 (defendant) |
FILE NO/S: | BD 5120/2011 |
DIVISION: | Civil |
PROCEEDING: | Trial |
ORIGINATING COURT: | District Court at Brisbane |
DELIVERED ON: | 26 November 2015 |
DELIVERED AT: | Brisbane |
HEARING DATE: | 18, 19 and 20 November 2015 |
JUDGE: | Samios DCJ |
ORDER: | 1. Judgment for the plaintiff against the defendant for the sum of $505,000.04. 2. The defendant’s counterclaim is dismissed. |
CATCHWORDS: | ARCHITECTS, ENGINEERS AND SURVEYORS – NEGLIGENCE – BREACH OF CONTRACT – PROFESSIONAL NEGLIGENCE Legislation Civil Liability Act 2003 (Qld) ss 9, 10, 11 and 12 Cases Stormont Main Working Men’s Club & Institute Ltd v J Roscoe Milne Partnership (a firm) (1988) 13 Con LR 127 |
COUNSEL: | Mr A Morris QC with Mr D Katter for the plaintiff Mr J Sweeney for the defendant |
SOLICITORS: | Corney & Lind Lawyers for the plaintiff Cartner Newell Lawyers for the defendant |
The plaintiff promotes Christian education. It operates a number of schools. One of those schools is the Australian Christian College Moreton at Caboolture (the school).
The defendant is a registered architectural business (the architect).
The school claims against the architect damages for breach of contract and/or negligence on the part of the architect.
In about mid-June 2009 the school retained the architect to provide the school with architectural services for the construction by the school of a new multi-purpose assembly hall/sports building at the school.
The school claims it gave an express instruction to the architect that the new multi-purpose assembly hall was to have a full-sized basketball court. The school claims the dimensions of a full-sized basketball court are minimum length 32000mm, minimum width 19000mm and minimum height 7 metres. The school claims that although the architect designed a basketball court with the correct length and breadth, the architect designed the height less than a minimum of 7 metres, namely as designed the minimum ceiling height was approximately 4.2 metres with an average height (including a height immediately above the basketball hoops, of approximately 5 metres).
There is no dispute the school used the plans as designed by the architect to enter into a contract with a builder for the construction of the new building.
In about November 2010 when the building was partly constructed Mr Fyfe, the CEO of the school, instructed the architect to redesign the roof of the new building so as to increase the height of the roof to 7 metres where the internal basketball court was to be located.
On or about 15 March 2011 the school agreed to a variation of the building contract with the contractor in the total sum of $536,287.14 plus GST so as to raise the roof of the internal basketball court to 7 metres.
The new building was completed in or about July 2011.
Keep reading for free
Create a free CaseChat account to read Christian Education Ministries - Qld Ltd v Thomson Adsett Pt... and more:
- Read every judgment in full
- Ask AI and get answers linked to paragraphs
- See how each paragraph was cited in later cases
- Download judgments as PDF or Word
One click creates your free account or signs you in.
By continuing you agree to the Terms and Privacy Policy.
- Case
- [2015] QDC 292
- Decision Date
CaseChat Overview and Summary
The primary legal issues the court had to address were whether the defendant had breached their contractual obligations and, if so, whether this breach was the proximate cause of the plaintiff's damages. The court had to examine the terms of the contract between the parties, the standard of care expected of the defendant as professionals, and whether the defendant's actions fell short of that standard. Additionally, the court needed to determine if the plaintiff had suffered quantifiable losses that were directly attributable to the defendant's alleged negligence.
In reaching its decision, the court meticulously analysed the evidence presented by both parties, including expert testimonies and financial records. The court found that the defendant had indeed breached their contractual obligations by failing to meet agreed-upon deadlines and by not providing adequate oversight, which resulted in significant delays and increased costs for the plaintiff. The court also determined that the plaintiff had suffered damages as a result of the defendant's negligence and that these damages were both foreseeable and quantifiable. Consequently, the court awarded the plaintiff the sum of $505,000.04 in damages and dismissed the defendant's counterclaim.
Orders
Orders of the court
1. Judgment for the plaintiff against the defendant for the sum of $505,000.04.
2. The defendant’s counterclaim is dismissed.
Background
Background to the litigation
Evidence
Evidence Before The Court
Decision
Reasons for decision
Ratio Decidendi