Chen v City of Canada Bay Council
[2017] NSWLEC 1076
•21 February 2017
Land and Environment Court
New South Wales
Medium Neutral Citation: Chen v City of Canada Bay Council [2017] NSWLEC 1076 Hearing dates: Conciliation conference on 14 November and 20 December 2016, 2 and 9 February 2017 Date of orders: 21 February 2017 Decision date: 21 February 2017 Jurisdiction: Class 1 Before: Brown C Decision: See (5) below
Catchwords: DEVELOPMENT APPLICATION: demolition of existing dwelling and construction of a boarding house; conciliation conference; agreement between the parties; orders Legislation Cited: Environmental Planning and Assessment Act 1979
Land and Environment Court Act 1979Category: Principal judgment Parties: Ying Chen (Applicant)
City of Canada Bay Council (Respondent)Representation: Ms A Spizzo, Landerer & Company (Applicant)
Ms K Law, Matthews Folbigg (Respondent)
File Number(s): 2016/226164 Publication restriction: No
Judgment
-
COMMISSIONER: This is an appeal against the refusal of Development Application No 2016/0026 for the demolition of existing structures and construction of a two (2) storey boarding house containing twenty-five (25) x rooms at 112 Queen Street, Concord West.
-
In this matter, at or after a conciliation conference, an agreement under s 34(3) of the Land and Environment Court Act 1979 (the Court Act) was reached between the parties as to the terms of a decision in the proceedings that was acceptable to the parties. As the presiding Commissioner, I was satisfied that the decision was one that the Court could have made in the proper exercise of its functions (this being the test applied by s 34(3) of the Court Act). As a consequence, s 34(3)(a) of the Act required me to “dispose of the proceedings in accordance with the decision”.
-
The Court Act also required me to “set out in writing the terms of the decision” (s 34(3)(b)). The orders made to give effect to the agreement constitute that document.
-
In making the orders to give effect to the agreement between the parties, I was not required to make, and have not made, any merit assessment of the issues that were originally in dispute between the parties.
-
The final orders to give effect to the parties’ agreement under s34(3) of the Land and Environment Court Act 1979 are:
The Appeal is upheld.
Development Application No 2016/0026 for demolition of existing structures and construction of a two (2) storey boarding house containing twenty-five (25) x rooms comprising fourteen (14) x single rooms and eleven (11) x double rooms above one (1) level of basement parking for six (6) x vehicle spaces, five (5) x motorcycle spaces and five (5) x bicycle spaces, is approved subject to the conditions set out in Annexure “A” to this agreement.
The Applicant is granted leave to rely on the following amended plans:
Architectural plans
Cover Page
GFA Calculation – Drawing No. A1050, Issue C
Room Schedule – Drawing No. A1052, Issue C
Basement Plan – Drawing No. A1200, Issue C
Ground Floor Plan – Drawing No. A1201, Issue E
Level 01 – Drawing No. A1202, Issue C
Roof Plan – Drawing No. A1203, Issue C
Shadow Diagram 9.00am – 21 June Winter Solstice – Drawing No. A1300, Issue C
Shadow Diagram 12.00pm – 21 June Winter Solstice – Drawing No. A1301, Issue C
Shadow Diagram 3.00pm – 21 June Winter Solstice – Drawing No. 1302, Issue C
Shadow Diagram 3D 21 June – Drawing No. 1303, Issue B
East Elevation – Drawing No. A1500, Issue B
North Elevation - Drawing No. A1501, Issue C
West Elevation – Drawing No. A1502, Issue C
South Elevation – Drawing No. A1503, Issue C
Material Schedule – Drawing No. A1600, Issue C
Sections – Drawing No. A1700, Issue C
Driveway Sections – Drawing No. A1701, Issue C
BASIX Certificate dated 1 December 2016
NatHERS Specification
Landscape Plans
Drawing No. LPS34 16 – 307/1, Issue C
Drawing No. LPS34 16 – 307/2, Issue B
Stormwater Concept Design Plans
Letter from SGC Engineering re stormwater kerb drainage dated 6 December 2016
Transmittal from SGC to Ghazi Al Ali Architects re: amended Stormwater plans
Coversheet – Drawing No. SW01, Issue E
Basement Plan – Drawing No. SW02, Issue E
Ground Floor Plan – Drawing No. SW03, Issue E
Sediment and Erosion Control Plan and Details – Drawing No. SW04, Issue E
Details Sheet – Drawing No. SW05, Issue E
Traffic Plans
Parking Review – Drawing No. SK-001, Version 6
Ramp Assessment Letter from Parking & Traffic Consultants dated 6 December 2016
Operational Plan of Management dated 20 December 2016
The Applicant is to pay those costs of the Respondent thrown away as a result of amending the development application, pursuant to Section 97B(2) of the Environmental Planning and Assessment 1979, in the sum of $9,000 to be paid within 28 days.
…………….
G Brown
Commissioner
226164.16 Annexure A (C) (167 KB, pdf)
Decision last updated: 22 February 2017
0
0
2