CASA EX61/23 — Amendment of CASA EX97/22 (Extension of Time) Instrument 2023 (No. 1) (Cth)
Instrument number CASA EX61/23
I, Robert Kenneth Walker, Acting Director of Aviation Safety, on behalf of CASA, make this instrument under regulations 11.160, 11.205 and 11.245 of the Civil Aviation Safety Regulations 1998.
[Signed Rob Walker]
Robert Walker
Acting Director of Aviation Safety
1 June 2023
CASA EX61/23 — Amendment of CASA EX97/22 (Extension of Time) Instrument 2023 (No. 1)
1 Name of instrument
This instrument is CASA EX61/23 — Amendment of CASA EX97/22 (Extension of Time) Instrument 2023 (No. 1).
2 Commencement
This instrument commences on 2 June 2023.
3 Amendment of CASA EX97/22
Schedule 1 amends CASA EX97/22 – Part 121 – Single Pilot Aeroplane (MOPSC 10-13) Operations – Exemptions Repeal, Remake, and Direction Instrument 2022.
Schedule 1 Amendments
[1] Section 2, the Note
repeal
[2] Subsection 8(3)
omit
Subject to section 9, each
insert
Each
[3] Section 9
repeal
[4] Section 10
omit
2 June 2023 (wherever occurring)
insert
2 December 2023
[5] Section 10, the Notes
repeal and substitute
Note 1 Proposed exposition changes to matters mentioned in subparagraphs 119.020 (b) (i) to (v) are significant changes requiring CASA approval if they fail to maintain or improve the safety of aeroplane operations. Applications for approval should be submitted to CASA at least 90 days before 2 December 2023. Later applications are likely to result in operators having to cease relevant operations on and from 2 December 2023 while awaiting CASA approval of the exposition content.
Note 2 For proposed exposition changes to matters mentioned in subparagraphs 119.020 (b) (i) to (v) that do maintain or improve the safety of aeroplane operations, revised exposition content must be submitted to CASA by 2 December 2023, even if the operator’s usual change process for non-significant changes would not require submission until a later date.
Note 3 The direction ceases to be in force in accordance with paragraph 2 (b).
0
0
0