CAPT and SINCLAIR

Link copied
Case Copied 26 min read

JURISDICTION     :   STATE ADMINISTRATIVE TRIBUNAL

ACT: BUILDING SERVICES (COMPLAINT RESOLUTION AND ADMINISTRATION) ACT 2011 (WA)

CITATION:   CAPT and SINCLAIR [2022] WASAT 6

MEMBER:   MS C CONLEY, MEMBER

MR R WOODFORDE, SESSIONAL MEMBER

HEARD:   21 OCTOBER 2021

DELIVERED          :   19 JANUARY 2022

FILE NO/S:   CC 1337 of 2021

BETWEEN:   NATALIE CAPT

Applicant

AND

JOHN SINCLAIR

Respondent


Catchwords:

Building Services (Complaint Resolution and Administration) Act 2011 (WA) - Building service complaint referred to Tribunal - Whether regulated building service was not carried out in a proper and proficient manner or is faulty or unsatisfactory - Building remedy order

Legislation:

Building Services (Complaint Resolution and Administration) Act 2011 (WA), s 3, s 36, s 36(1)(a), s 36(1)(b), s 36(1)(c), s 38, s 38(1)(a), s 38(2)
Building Services (Registration) Act 2011 (WA), s 7
Home Building Contracts Act 1991 (WA), s 3, s 3(1)
Home Building Contracts Regulations 1992 (WA), reg 2A(a)
State Administrative Tribunal Act 2004 (WA), s 32

Result:

Application allowed

Category:    B

Representation:

Counsel:

Applicant : In Person
Respondent : In Person

Solicitors:

Applicant : N/A
Respondent : N/A

Case(s) referred to in decision(s):

Diploma Construction (WA) Pty Ltd v South Central WA Pty Ltd [2015] WASC 289

Gemmill Homes Pty Ltd v Sanders [2018] WASC 179

Holman and W&D Moffatt Pty Ltd [2016] WASAT 105

Nelson v Mardesic (1999) 22 SR (WA) 42

Northcott and Realgold Corporation Pty Ltd (ACN 117 580 560) [2020] WASAT 72

REASONS FOR DECISION OF THE TRIBUNAL:

Introduction

  1. In May 2020 the applicant and her husband engaged the respondent to install pavers around their newly installed fibreglass swimming pool (pool). 

  2. During the installation, a row of pavers was installed on the edge of the pool (header course).

  3. In November 2020 the pavers comprising the header course began to loosen and lift to the extent that all of these pavers debonded from the edge of the pool.

  4. The applicant complained to the respondent.  However, the respondent alleged that he was not responsible and blamed poor pencil compaction for the problem.

  5. In May 2021 the applicant lodged a complaint with the Building Commissioner in respect of the paving work carried out by the respondent.

  6. In August 2021 the Building Commissioner referred the complaint to the Tribunal for determination.[1]

Issues for determination

[1] Exhibit 1, pages 11 and 84.

  1. The issues for determination by the Tribunal are:

    a)whether the paving work undertaken by the respondent was a regulated building service;

    b)whether the paving work was not carried out in a proper and proficient matter or is faulty or unsatisfactory; and

    c)whether the Tribunal should make a remedial works order or an order for the payment of the costs of carrying out the remedial works and, if the latter, what amount should be awarded.

Tribunal proceedings

  1. A final hearing in relation to this matter was held on 21 October 2021.

  2. The applicant contended that the respondent had not used the correct adhesive.  There was also an issue raised at the hearing as to…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read CAPT and SINCLAIR and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Find similar cases

Other decisions on the same topics. Each opens in a new tab.

Details

Case
[2022] WASAT 6
Decision Date

CaseChat Overview and Summary

In the matter of CAPT and SINCLAIR, the dispute before the Tribunal involved a complaint under the Building Services (Complaint Resolution and Administration) Act 2011 (WA) concerning the quality of paving work undertaken by the respondent, Mr Sinclair. The applicant, Mrs CAPT, alleged that the paving was not carried out in a proper and proficient manner, was faulty, or unsatisfactory. This included issues with the installation of pavers and the absence of a silicone bead, which the respondent did not include in his quote and subsequently failed to install at the applicant's request.

The central legal issue the Tribunal had to resolve was whether the regulated building service, namely the paving work, was not carried out in a proper and proficient manner or was faulty or unsatisfactory. This required a consideration of the statutory language in the Building Services (Complaint Resolution and Administration) Act 2011 (WA), particularly the expression 'has not been carried out in a proper and proficient manner or is faulty or unsatisfactory'. The Tribunal needed to interpret whether this phrase encompasses two distinct criteria and, if so, how these criteria apply to the facts of the case.

The Tribunal found that the phrase in question indeed comprises two distinct limbs, each with its own criterion. The first limb concerns the manner in which the regulated building service was carried out, while the second pertains to the regulated building service itself being faulty or unsatisfactory. The Tribunal noted the negative criterion in the first limb and the positive criterion in the second. In this case, the Tribunal concluded that the absence of the silicone bead, a factor that the respondent should have included in the quote and subsequently failed to install as per the applicant's refusal, constituted a fault in the regulated building service. This was compounded by the visual evidence of improperly installed pavers and the adhesive residue, which indicated a substandard execution of the work.

The Tribunal ordered the respondent to remedy the defects in the paving work. The respondent was directed to rectify the installation of the pavers, including the proper alignment and bonding of the header course pavers, and to install the silicone bead to prevent further issues with water affecting the adhesive. The Tribunal's decision underscored the importance of clear communication and adherence to industry standards in regulated building services.

Background

Background to the litigation

Decision

Reasons for decision

Ratio Decidendi

Legal principle established

In Northcott and Realgold Corporation Pty Ltd (ACN 117 580 560) [2020] WASAT 72, the phrase 'has not been carried out in a proper and proficient manner or is faulty or unsatisfactory' was said by the Tribunal to be a broad expression which incorporates two distinct limbs, such that: a)the description 'in a proper and proficient' attaches to the manner in which the regulated building service has been carried out; b)the phrase 'is faulty or unsatisfactory' makes it clear that this element attaches to the regulated building service itself (noting the use of the present tense 'is') rather than to the manner in which it 'has been carried out' (the latter using the present perfect tense);[32]c)the limbs are further distinguished by the use of a negative criterion in the first limb ('the regulated building service … has not been carried out in a proper and proficient manner') and a positive criterion in second limb ('the regulated building service … is faulty or unsatisfactory').[33][32] See also Holman and W&D Moffatt Pty Ltd [2016] WASAT 105 at [40] per Senior Sessional Members Raymond and Affleck and Diploma Construction (WA) Pty Ltd v South Central WA Pty Ltd [2015] WASC 289 at [31] per Mitchell J.[33] At [45]. There are a number of photographs of the pool and surrounding area. [34] The photographs show pavers comprising the header course which have completely debonded from the edge beam of the pool. They also show that approximately three quarters of the pavers comprising the header course have been placed upside down on the row of pavers immediately behind the header course. Further, the photographs show a sandy coloured substance which looks like cement (adhesive) on the underside of each of the pavers which have been turned upside down and on some parts of the edge beam of the pool.[34] Exhibit 1, pages 64, 69, 75, 81, 92, 93, 94 and 95. There are a number of close-up photographs of the pavers and the edge beam of the pool.[35] Again, the adhesive is clearly visible on the underside of the pavers. Very little of the adhesive remains on the edge beam of the pool.[35] Exhibit 1, pages 26 and 28. There is nothing in any of the photographs which provides evidence of subsidence in the row of pavers behind the header course. At the hearing, the respondent gave evidence that silicone is the bead that is put inside the pool after the bullnose is installed to stop water affecting the adhesive,[36] but that he had not included the silicone bead in the quote for the paving work.[37] [36] ts 35­39, 21 October 2021.[37] ts 40, 21 October 2021. The respondent also gave evidence that, after the paving work was finished, he asked the applicant whether she wanted to have a silicone bead installed but the applicant refused.[38] Mr Sinclair accepted that he did not inform the applicant and her husband that not putting the silicone in would make the paver wobbly.[39][38] ts 16­17 and 39­40, 21 October 2021.[39] ts 39, 21 October 2021. The respondent conceded that he should have allowed for the cost of a silicone bead when he provided the applicant with a quote for the paving. This is evident from the following exchange which took place during the hearing:Woodforde Mr: So my question for you is do you believe that it should have had the silicone joint around the edge?Sinclair, Mr: It's like a fifty-fifty thing. Like, some people prefer to have it done because then they ensure that any (indistinct) or that the water is not constantly hitting into the adhesive which can cause that-with the chemicals in the pool to cause it to lift but if you have it sealed, that's -the- the seal and that's in that tube that you run around from inside the pool with your finger underneath the bullnose can tolerate the chemicals in the pool. That's what it's ---Woodforde Mr: So ---Sinclair, Mr: Gives it that extra protection pretty much.Woodforde Mr: I don't disagree with you. I guess my question is do you think it's something that you should have raised with them before you prepared the quote or ---Sinclair, Mr: Yes.Woodforde Mr: --- you know, before you did the work? As you just said, you tried to do other things to make sure you were doing a better job than normal such as the use cracker dust, such as notch trowel rather than tube, etcetera, etcetera but is it possible that the one factor-the silicone bead, I'm not suggesting that it's (indistinct) that is something that, you know ---Sinclair, Mr: Wouldn't have helped.Woodforde Mr: --- it wouldn't have been ---Sinclair, Mr: Yes.Woodforde Mr: --- a huge expenses.Sinclair, Mr: Yes, yes.Woodforde Mr: It's something that you probably should have just allowed for in the first place for ---Sinclair, Mr: And - yes.Woodforde Mr: Even if you think there could have been an issue ---Sinclair, Mr: Yes.Woodforde Mr: --- pointed out them, well, you know, either I can't do the job because you don't want to do this or - you know, make clear in writing to them whether - yes-this is what could be a consequence of not doing that. Would that be fair assessment?Sinclair, Mr: Definitely. Yes, yes, yes. I would - I definitely - yes – would obviously recommend that anyone further ahead - that's 100 per cent. Yes.[40][40] ts 33­34, 21 October 2021.