FEDERAL COURT OF AUSTRALIA
BHP Steel (AIS) Pty Ltd v Construction, Forestry, Mining & Energy Union [2000] FCA 1614
WORKPLACE RELATIONS – order by Australian Industrial Relations Commission that industrial action stop or not occur – whether order, which applied for a period of two months, was only in respect of current dispute or could also apply to a later national dispute.
WORKPLACE RELATIONS – collateral challenge as to the validity of the order open to the respondent – order not invalid by failure to identify time and date by which conduct ordered was to be done – use of the adverb “immediately” sufficiently certain – positive expression to perform work is tantamount to negative stipulation to cease industrial action –order that respondent supply a copy of order to employees within power to give incidental directions.
WORKPLACE RELATIONS – respondent failed to supply a copy of the order to employees – respondent failed to take steps to ensure the employees complied with the order.
Workplace Relations Act 1996 (Cth) s 127, s 178, s 143(1)
O’Toole v Charles David Pty Ltd (1991) 171 CLR 232
Ousley v The Queen (1997) 192 CLR 69
The Attorney-General (Cth) v Breckler (1999) 197 CLR 83
Dorsman v Nichol (1978) 20 ALR 231
Measures v McFadyen (1910) 11 CLR 723
Communications, Electrical, Electronic, Energy, Information, Postal, Plumbing and Allied Services Union of Australia v A G Coombs Fire Protection (1998) 87 IR 110
Phillip Morris Incorporated v Adam P Brown Male Fashions Pty Ltd (1981) 148 CLR 457
Re Refugee Review Tribunal; Ex parte Aala [2000] HCA 57
Australasian Meat Industry Employees’ Union v Meneling Station Pty Ltd (1986) 16 IR 245
Microsoft Corporation v Marks (1996) 139 ALR 99
Australian Industry Group v Automotive, Food, Metals, Engineering, Printing & Kindred Industries Union [2000] FCA 629
Hillingdon London Borough Council v Cutler [1968] 1 QB 124
The Queen v Kelly; Ex part Berman (1953) 89 CLR 608
Attorney-General v Walthamstow Urban District Council (1895) 11 TLR 533The Macquarie Dictionary, 2nd ed., 1991
Halsbury’s Laws of England, 4th ed. (Reissue)
BHP STEEL (AIS) PTY LIMITED V CONSTRUCTION, FORESTRY, MINING AND ENERGY UNION
N 150 OF 2000
JUDGE: BEAUMONT J
DATE: 21 NOVEMBER 2000
PLACE: SYDNEY
IN THE FEDERAL COURT OF AUSTRALIA
NEW SOUTH WALES DISTRICT REGISTRY
N 150 OF 2000
BETWEEN:
BHP STEEL (AIS) PTY LIMITED
APPLICANTAND:
CONSTRUCTION, FORESTRY, MINING AND ENERGY UNION
RESPONDENTJUDGE:
BEAUMONT J
DATE OF ORDER:
21 NOVEMBER 2000
WHERE MADE:
SYDNEY
THE COURT ORDERS THAT:
1.The breaches alleged in pars 1 and 2 of the amended application have been established.
2.The claim made in par 3 of the amended application be dismissed.
3.The proceedings be stood over to Wednesday, 22 November 2000 at 9.45 a.m. for directions on the hearing of the question of penalty in respect of the breaches found.
Note: Settlement and entry of orders is dealt with in Order 36 of the Federal Court Rules.
IN THE FEDERAL COURT OF AUSTRALIA
NEW…
Keep reading for free
Create a free CaseChat account to read BHP Steel (AIS) Pty Ltd v Construction, Forestry, Mining and... and more:
- Read every judgment in full
- Ask AI and get answers linked to paragraphs
- See how each paragraph was cited in later cases
- Download judgments as PDF or Word
One click creates your free account or signs you in.
By continuing you agree to the Terms and Privacy Policy.
Find similar cases
Other decisions on the same topics. Each opens in a new tab.
Details
- Case
- [2000] FCA 1614
- Decision Date
CaseChat Overview and Summary
The primary legal issue before the court was the interpretation and validity of the Commission's order, which was argued to be overly broad in its scope and application. The court was tasked with determining whether the order was properly made under the relevant statutory authority and whether it was validly directed at the union and its members. Additionally, the court had to consider whether the order was correctly interpreted to bind the union and its members to cease industrial action immediately and comply with the employer's reasonable work requirements.
The court, in its reasoning, focused on the statutory context and the language of the order itself. It found that the order was properly made under the authority of section 127 of the Act, which allows the Commission to direct that industrial action stop if it appears to the Commission that such action is occurring in relation to an industrial dispute. The court held that the order was binding on the union and its members, who were required to comply with its terms. The court rejected the employer's argument that the order should have an ambulatory operation, applying to industrial action occurring in relation to different disputes, and found that the order was limited in its scope and effect to the particular industrial dispute as it stood on 2 December 1999.
The court concluded that the breaches of the order alleged in parts 1 and 2 of the employer's amended application had been established, but dismissed the claim made in part 3 of the amended application, which sought a penalty for an alleged breach of the order on 20 January 2000. The proceedings were stood over for directions on the hearing of the question of penalty in respect of the breaches found.
The final orders of the court were that the breaches alleged in parts 1 and 2 of the amended application were established, the claim in part 3 of the amended application was dismissed, and the proceedings were to be stood over for further directions.
Orders
Orders of the court
1. The breaches alleged in pars 1 and 2 of the amended application have been established.
2. The claim made in par 3 of the amended application be dismissed.
3. The proceedings be stood over to Wednesday, 22 November 2000 at 9.45 a.m. for directions on the hearing of the question of penalty in respect of the breaches found.
Background
Background to the litigation
Decision
Reasons for decision
Ratio Decidendi
Legal principle established
Before describing the evidence, both affidavit and oral, bearing upon the factual issues that arise, it will be necessary to turn first to consider a preliminary issue, that is, the meaning and operation of the Order, and then, in the light of those matters, to consider the Union’s challenge to its validity.THE FIRST ISSUE: THE MEANING AND OPERATION OF THE ORDER The meaning and operation of the Order should first be considered. The material provisions of the Order were, it will be recalled, as follows:·With respect to its scope, the Order is expressed to be “binding upon”:(a)The Union and its officers;(b)The Employees.(c)BHP.·In ordering “[i]ndustrial action to stop”, the Order directs (par 3.1) that the Employees “must immediately cease and refrain from engaging in industrial action in the form of any strike, or any restriction, ban or other limitation on the performance of work”.·In this connection, the Order then directs (par 3.2) that the Employees “must make themselves available for work and perform work as [BHP] may reasonably require”.·Further in this connection, the Order directs (par 3.3) that the Union “must take any and all steps necessary and available under the rules of the [Union] to ensure that the [Employees] comply with the Order”.·In directing service of the Order, the Order directs (par 5.1) that a copy (1) “must be served by [BHP] on the [Union]” and (2) “must be supplied by the [Union] to each of the [Employees]”. It is further directed that “[s]ervice by [BHP] of this Order on the [Union] shall be sufficient service of the Order on the [Union] and its official and members”.·The Order was to take effect from 2 December 1999 and to remain in force for two months (par 6.1). In construing the Order, it is necessary to have regard to its statutory context, which, as noted, is s 127 of the Act. It will be recalled that the following are, relevantly, its principal features:·The grant to the Commission of the power, by order, to direct that “industrial action” (as defined) stop if it appears to the Commission that such is happening in relation to an “industrial dispute” (as defined) (s 127(1)).·An organisation to whom such an order is expressed to apply must comply with the Order (s 127(5)). When the Order is read in this statutory context, the Order should, in my view, receive the following interpretation of its meaning and operation:·Since the Order is expressed (par 2(a)) to bind, inter alios, the Union, the Union is bound by virtue of s 127(5)) to comply with it. The Employees, likewise, are bound to comply.·The Employees must, during the period of two months from 2 December 1999, immediately cease and refrain from engaging in “industrial action” in any of the forms specified and must make themselves available for work and perform work as BHP may reasonably require (pars 3.1, 3.2, 6.1). Although, as has been said, “industrial action” has the particular meaning provided by its statutory definition (s 4(1)), the other language of par 3.1 and par 3.2 was, in my view, intended to have its ordinary meaning. However, on behalf of BHP a claim is made, as noted, which would give these provisions an ambulatory operation, so as to pick up (albeit within the two month period) industrial action happening in relation to a different dispute. As has been seen, the amended statement of claim addressed not only the Tower Colliery dispute which was unresolved as at 2 December 1999, but also the national stoppage which later happened on 20 January 2000. This (latter) particular claim is reflected in par 3 of the amended application, whereby BHP seeks the imposition of a penalty for an alleged breach of Order 3 on 20 January 2000.