Best Tech & Engineering Ltd v Samsung C&T Corporation [No 3]

Link copied
Case Copied 14 min read

JURISDICTION     :   SUPREME COURT OF WESTERN AUSTRALIA

IN CHAMBERS

CITATION:   BEST TECH & ENGINEERING LTD -v- SAMSUNG C&T CORPORATION [No 3] [2015] WASC 459

CORAM:   ALLANSON J

HEARD:   27 NOVEMBER 2015

DELIVERED          :   30 NOVEMBER 2015

PUBLISHED           :  1 DECEMBER 2015

FILE NO/S:   CIV 2500 of 2015

BETWEEN:   BEST TECH & ENGINEERING LTD

Plaintiff

AND

SAMSUNG C&T CORPORATION
Defendant

Catchwords:

Interim injunction - Performance guarantee - Construction of clause - Turns on own facts

Application for separate trial of issue - Unconscionable conduct - Turns on own facts

Legislation:

Rules of the Supreme Court 1971 (WA), O 32 r 4

Result:

Application dismissed

Category:    B

Representation:

Counsel:

Plaintiff:     Mr N D C Dillon

Defendant:     Mr G D Cobby

Solicitors:

Plaintiff:     Moray & Agnew

Defendant:     Herbert Smith Freehills

Case(s) referred to in judgment(s):

Australian Broadcasting Corporation v Lenah Game Meats Pty Ltd [2001] HCA 63; (2001) 208 CLR 199

Best Tech & Engineering Ltd v Samsung C&T Corporation [2015] WASC 355

Best Tech & Engineering Ltd v Samsung C&T Corporation [No 2] [2015] WASC 447

Carlo Nobili SpA Rubinetterie v Militaire Nominees Pty Ltd [2004] WASC 47

Clairs Keeley (A Firm) v Treacy [2004] WASCA 277

Clough Engineering Ltd v Oil & Natural Gas Corporation Ltd [2008] FCAFC 136; (2008) 249 ALR 458

Landsdale Pty Ltd v Moore [2009] WASCA 176

Sheraz Pty Ltd v Vegas Enterprises Pty Ltd [2015] WASCA 4

Twinside Pty Ltd v Venetian Nominees Pty Ltd [2008] WASC 110

Wood Hall Ltd v Pipeline Authority [1979] HCA 21; (1979) 141 CLR 443

  1. ALLANSON J:  Best Tech & Engineering Ltd and Samsung C&T Corporation are parties to a contract entitled 'Roy Hill Ore Project Supply Contract For Supply of Modular Steel' (the Contract).

  2. Clauses 3.1 and 3.2 of the Contract relate to the provision of security by Best Tech (as supplier) to Samsung (as purchaser):

    3.1Provision

    Security shall be provided by the Supplier to Purchaser in accordance with Item 12.

    The Purchaser shall have a discretion to approve or disapprove of the form of security and the financial institution giving it.

    3.2Recourse

    (a)Security shall be subject to recourse by the Purchaser where at least 10 days have elapsed since the Purchaser notified the Supplier of its intention to have recourse subject to the purchaser showing any losses, damages or substantial breaches of BTE's scope of works as a result of actions by BTE.  If the Purchaser converts any security into money in accordance with this clause and it is subsequently determined that the relevant amount was not payable by the Supplier under or in respect of the Subcontract then:

    (i)the Purchaser must pay back the relevant amount to the Supplier;

    (ii)the Purchaser must pay an amount to the Supplier that is calculated by multiplying the relevant amount by the percentage rate of 1% above the current LIBOR;

    (iii)costs, fees or charges incurred as a result of the security being converted by the Purchaser to a maximum amount of three percent of the…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Best Tech & Engineering Ltd v Samsung C&T Corporation [No 3] and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Find similar cases

Other decisions on the same topics. Each opens in a new tab.

Details

Case
[2015] WASC 459
Decision Date

CaseChat Overview and Summary

Best Tech & Engineering Ltd filed proceedings against Samsung C&T Corporation in the Supreme Court of Western Australia. The dispute concerns the construction of a clause in a performance guarantee and an allegation of unconscionable conduct in relation to the calling of guarantees. Samsung had previously been granted an interim injunction which was later discharged by Chaney J. Following the discharge, Samsung issued another notice calling on the guarantees, prompting Best Tech to apply for further orders, including an interlocutory injunction and an urgent separate trial of the construction issue. Best Tech also sought to introduce an allegation of unconscionable conduct in its application, a matter not previously raised.

The legal issues before the court included whether the injunction should be reinstated, the proper construction of the performance guarantee clause, and whether an allegation of unconscionable conduct could be raised in this proceeding and was suitable for separate determination. The court considered the difficulties in Best Tech's position, including the lack of notice to Samsung, the absence of specific evidence on unconscionability, and the procedural irregularities in introducing the claim.

The court found that reinstating the injunction was not appropriate as it would require relief beyond the terms of the present application. It was also noted that the allegation of unconscionable conduct was not pleaded and would require evidence outside the scope of the existing cause of action. The court doubted whether the issue of unconscionability was suitable for separate determination given the lack of proper identification of a suitable issue. Consequently, the court dismissed the application for further orders.

No further orders were made as the court found the application to be without merit. The court did not reinstate the injunction or grant the separate trial of the construction issue, and did not entertain the allegation of unconscionable conduct.

Background

Background to the litigation

Decision

Reasons for decision

Ratio Decidendi

Legal principle established

Following a hearing on 30 October 2015, Chaney J held that the injunction granted on 18 September 2015 should be discharged, but there should be an injunction restraining Samsung from calling on the guarantees based upon the notice dated 10 September 2015, by reason of a failure to meet the requirements of cl 3.2(a) of the Contract at the same time as, or prior to, the issue of the notice. His Honour published his reasons on 20 November 2015: Best Tech & Engineering Ltd v Samsung C&T Corporation [No 2] [2015] WASC 447 (Best Tech [No 2]). Samsung issued a further notice after the decision of Chaney J. On 25 November 2015, Best Tech applied for further orders including an interlocutory injunction, not materially different from that discharged by Chaney J. Best Tech also applied for orders for the urgent separate trial of an issue pursuant to O 32 r 4 of the Rules of the Supreme Court 1971 (WA), and programming of submissions and affidavits for that hearing. The intended effect of the orders would be to have the issue of the proper construction of cl 3.2 heard and determined before 31 December 2015. In the course of submissions on behalf of Best Tech, it became apparent that Best Tech wishes to rely also on an allegation of unconscionable conduct, and would seek to maintain the injunction on that basis should it fail on the construction question. To that effect, Best Tech was also looking for an urgent final determination of whether it is unconscionable for Samsung to call on the securities. That issue of unconscionability had not been raised before Chaney J, and was not the subject of specific evidence. It was identified in oral submissions on the hearing of the application before me when counsel was asked about whether there was anything materially different in this application from the matters determined by Chaney J. There are difficulties in Best Tech's position. First, to the extent the question was identified, it would require relief beyond the terms of the present application, which seeks only a preliminary determination of the construction issue. Samsung was not on notice of such an application. Second, a claim in unconscionable conduct raises matters outside the terms of the action. The action has not been pleaded ‑ it was commenced by writ bearing a general indorsement. The indorsement does not identify any claim in unconscionable conduct, statutory or otherwise, but only contractual breach. I doubt that the allegation of unconscionable conduct arises from facts which are the same as, or include or form part of, facts giving rise to the cause of action which is mentioned. Third, if the claim is based on the conduct in issuing the fresh notice, following the decision by Chaney J, it is based on matters arising after the commencement of the action. Fourth, I doubt whether the issue of unconscionable conduct is one suitable for separate determination. No attempt had been made to date to properly identify a suitable issue: see Carlo Nobili SpA Rubinetterie v Militaire Nominees Pty Ltd [2004] WASC 47 [4]; Landsdale Pty Ltd v Moore [2009] WASCA 176 [19] ‑ [21].