AUSTRALIAN COMPETITION TRIBUNAL
Application by Epic Energy South Australia Pty Ltd
[2003] ACompT 5
TRADE PRACTICES - access to pipelines - review of decision of Australian Competition and Consumer Commission to draft access arrangement - whether decision reasonable - calculation of optimised replacement cost - whether covered pipeline - Moomba to Adelaide Pipeline System - Gas Pipelines Access (South Australia) Act 1997 (SA)
Application by Epic Energy South Australia Pty Ltd [2002] AcompT 4 followed
Associate Provincial Picture Houses Ltd v Wednesdbury Corporation [1948] 1 KB 223 applied
Duke Eastern Gas Pipeline Pty Ltd [2001] ACompT 2 followed
APPLICATION BY EPIC ENERGY SOUTH AUSTRALIA PTY LTD
File No 6 of 2002
JUSTICE COOPER, PROFESSOR D K ROUND AND MISS M M STARRS
BRISBANE (HEARD IN ADELAIDE)
10 DECEMBER 2003
IN THE AUSTRALIAN COMPETITION TRIBUNAL
Matter No 6 of 2002
RE:
APPLICATION UNDER SECTION 38 AND/OR SECTION 39 OF THE GAS PIPELINES ACCESS (SOUTH AUSTRALIA) LAW FOR REVIEW OF THE DECISION BY THE AUSTRALIAN COMPETITION AND CONSUMER COMMISSION MADE ON 31 JULY 2002 TO DRAFT AND APPROVE AN ACCESS ARRANGEMENT FOR THE MOOMBA TO ADELAIDE PIPELINE SYSTEM UNDER SECTION 2.20(a) OF THE NATIONAL THIRD PARTY ACCESS CODE FOR NATURAL GAS PIPELINE SYSTEMS
BY:
EPIC ENERGY SOUTH AUSTRALIA PTY LTD
TRIBUNAL:
JUSTICE R E COOPER (DEPUTY PRESIDENT)
PROFESSOR D K ROUND
MISS M M STARRS
DATE:
10 DECEMBER 2003
WHERE MADE:
BRISBANE (HEARD IN ADELAIDE)
THE TRIBUNAL ORDERS THAT:
1. The decision of the Australian Competition and Consumer Commission made on 31 July 2002 to approve an Access Arrangement pursuant to s 2.20(a) of the National Third Party Access Code for National Gas Pipeline Systems in respect of the Moomba to Adelaide Pipeline System (‘the Decision’) be varied.
2. The Decision be varied in the following manner:
(a) An exchange rate adjusted cost of line pipe of $1 302.20 per tonne be used to calculate the Optimised Replacement Cost of the existing pipeline for the purpose of determining the initial Capital Base in valuing the Moomba to Adelaide Pipeline System (‘MAPS’) as a Covered Pipeline.
(b) The expansion of capacity of the MAPS by 25 terajoules per day to satisfy the requirements of the operator of the Pelican Point Power Station be excluded from the System Primary Capacity (‘the SPC’) calculation and that the SPC of the MAPS for the purpose of the approved Access Arrangement be 323 terajoules per day.
(c) All necessary and consequential amendments be made to give effect to such variations in terms of the amendments contained in ‘Scenario 2’ of the document ‘Statement of Amendments Required to Access Arrangement’.
IN THE AUSTRALIAN COMPETITION TRIBUNAL
Matter No 6 of 2002
RE:
APPLICATION UNDER SECTION 38 AND/OR SECTION 39 OF THE GAS PIPELINES ACCESS (SOUTH AUSTRALIA) LAW FOR REVIEW OF THE DECISION BY THE AUSTRALIAN COMPETITION AND CONSUMER COMMISSION MADE ON 31 JULY 2002 TO DRAFT AND APPROVE AN ACCESS ARRANGEMENT FOR…
Keep reading for free
Create a free CaseChat account to read Application by Epic Energy South Australia Pty Ltd and more:
- Read every judgment in full
- Ask AI and get answers linked to paragraphs
- See how each paragraph was cited in later cases
- Download judgments as PDF or Word
One click creates your free account or signs you in.
By continuing you agree to the Terms and Privacy Policy.
- Case
- [2003] ACompT 5
- Decision Date
CaseChat Overview and Summary
Orders
Orders of the court
Full text does not contain this section.
Background
Background to the litigation
Full text does not contain this section.
Evidence
Evidence Before The Court
Full text does not contain this section.
Decision
Reasons for decision
Full text does not contain this section.
Ratio Decidendi
Legal Principle Established
Full text does not contain this section.