Application by Epic Energy South Australia Pty Ltd

Link copied
Case Copied 52 min read

AUSTRALIAN COMPETITION TRIBUNAL

Application by Epic Energy South Australia Pty Ltd

[2003] ACompT 5

TRADE PRACTICES - access to pipelines - review of decision of Australian Competition and Consumer Commission to draft access arrangement - whether decision reasonable - calculation of optimised replacement cost - whether covered pipeline - Moomba to Adelaide Pipeline System - Gas Pipelines Access (South Australia) Act 1997 (SA)

Gas Pipelines Access (South Australia) Act 1977 (SA)

Application by Epic Energy South Australia Pty Ltd [2002] AcompT 4 followed

Associate Provincial Picture Houses Ltd v Wednesdbury Corporation [1948] 1 KB 223 applied

House v The King (1936) 55 CLR 499 applied

Duke Eastern Gas Pipeline Pty Ltd [2001] ACompT 2 followed

APPLICATION BY EPIC ENERGY SOUTH AUSTRALIA PTY LTD

File No 6 of 2002

JUSTICE COOPER, PROFESSOR D K ROUND AND MISS M M STARRS

BRISBANE (HEARD IN ADELAIDE)

10 DECEMBER 2003

IN THE AUSTRALIAN COMPETITION TRIBUNAL

Matter No 6 of 2002

RE:

APPLICATION UNDER SECTION 38 AND/OR SECTION 39 OF THE GAS PIPELINES ACCESS (SOUTH AUSTRALIA) LAW FOR REVIEW OF THE DECISION BY THE AUSTRALIAN COMPETITION AND CONSUMER COMMISSION MADE ON 31 JULY 2002 TO DRAFT AND APPROVE AN ACCESS ARRANGEMENT FOR THE MOOMBA TO ADELAIDE PIPELINE SYSTEM UNDER SECTION 2.20(a) OF THE NATIONAL THIRD PARTY ACCESS CODE FOR NATURAL GAS PIPELINE SYSTEMS

BY:

EPIC ENERGY SOUTH AUSTRALIA PTY LTD

TRIBUNAL:

JUSTICE R E COOPER (DEPUTY PRESIDENT)

PROFESSOR D K ROUND

MISS M M STARRS

DATE:

10 DECEMBER 2003

WHERE MADE:

BRISBANE (HEARD IN ADELAIDE)

THE TRIBUNAL ORDERS THAT:

1.         The decision of the Australian Competition and Consumer Commission made on 31 July 2002 to approve an Access Arrangement pursuant to s 2.20(a) of the National Third Party Access Code for National Gas Pipeline Systems in respect of the Moomba to Adelaide Pipeline System (‘the Decision’) be varied.

2.         The Decision be varied in the following manner:

(a)        An exchange rate adjusted cost of line pipe of $1 302.20 per tonne be used to calculate the Optimised Replacement Cost of the existing pipeline for the purpose of determining the initial Capital Base in valuing the Moomba to Adelaide Pipeline System (‘MAPS’) as a Covered Pipeline.

(b)        The expansion of capacity of the MAPS by 25 terajoules per day to satisfy the requirements of the operator of the Pelican Point Power Station be excluded from the System Primary Capacity (‘the SPC’) calculation and that the SPC of the MAPS for the purpose of the approved Access Arrangement be 323 terajoules per day.

(c)        All necessary and consequential amendments be made to give effect to such variations in terms of the amendments contained in ‘Scenario 2’ of the document ‘Statement of Amendments Required to Access Arrangement’.

IN THE AUSTRALIAN COMPETITION TRIBUNAL

Matter No 6 of 2002

RE:

APPLICATION UNDER SECTION 38 AND/OR SECTION 39 OF THE GAS PIPELINES ACCESS (SOUTH AUSTRALIA) LAW FOR REVIEW OF THE DECISION BY THE AUSTRALIAN COMPETITION AND CONSUMER COMMISSION MADE ON 31 JULY 2002 TO DRAFT AND APPROVE AN ACCESS ARRANGEMENT FOR…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Application by Epic Energy South Australia Pty Ltd and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details
Case
[2003] ACompT 5
Decision Date

CaseChat Overview and Summary

The Australian Competition Tribunal was asked to review the decision of the Australian Competition and Consumer Commission (ACCC) to draft and approve an access arrangement for the Moomba to Adelaide Pipeline System. The applicant, Epic Energy South Australia Pty Ltd, argued that the ACCC's decision to draft and approve an access arrangement for the Moomba to Adelaide Pipeline System was unreasonable. The Tribunal found that the ACCC had erred in its determination of the initial capital base and system primary capacity. The Tribunal found that the ACCC had used an unreasonable methodology to estimate the cost of line pipe, which resulted in an underestimation of the initial capital base. The Tribunal also found that the ACCC had unreasonably included the Pelican Point expansion in the system primary capacity. The Tribunal ordered that the access arrangement be varied to reflect the Tribunal's findings. The Tribunal ordered that the initial capital base be recalculated using an exchange rate adjusted cost of line pipe of $1,302.20 per tonne, and that the system primary capacity be reduced by 25 terajoules per day.

Orders

Orders of the court

Full text does not contain this section.

Background

Background to the litigation

Full text does not contain this section.

Evidence

Evidence Before The Court

Full text does not contain this section.

Decision

Reasons for decision

Full text does not contain this section.

Ratio Decidendi

Legal Principle Established

Full text does not contain this section.