AD/SM-205/26 Engine Air Induction Valve Replacement Cancelled (Cth)
AIRWORTHINESS DIRECTIVE
On the effective date specified below, and for the reasons set out in the background section, the CASA delegate whose signature appears below revokes Airworthiness Directive AD/SM-205/26.
SIAI Marchetti S205 and S208 Series Aeroplanes
| AD/SM-205/26 | Engine Air Induction Valve - Replacement | 7/2009 |
Requirement: | CANCELLED. |
| This AD is cancelled on 2 July 2009. | |
Background: | This Australian AD raised in 1977 against SIAI Marchetti Service Bulletin (SB) Compliance was: Within 25 Hours TIS after 30 April 1977. This AD has been sufficiently promulgated for the affected aircraft to have been modified by now; therefore this AD is considered to be no longer required. |
James Coyne
Delegate of the Civil Aviation Safety Authority
18 May 2009
0
0
0