AD/PA-36/16 Control Rod End Bearings Replacement Cancelled (Cth)

Case
No judgment structure available for this case.

AIRWORTHINESS DIRECTIVE

On the effective date specified below, and for the reasons set out in the background section, the CASA delegate whose signature appears below revokes Airworthiness Directive AD/PA-36/16.

Piper PA-36 (Pawnee Brave) Series Aeroplanes

AD/PA-36/16 Control Rod End Bearings - Replacement 3/2009

Requirement:

CANCELLED.

This AD is cancelled on 12 March 2009.

Background:

This unique Australian AD specified once-only replacement of control rod end bearings in engine and flight controls in accordance with Piper SB No. 516 within 100 hours time in service after April 1977.  The AD is no longer required.

David Punshon
Delegate of the Civil Aviation Safety Authority

8 January 2009

Actions
Download as PDF Download as Word Document


Cases Citing This Decision

0

Cases Cited

0

Statutory Material Cited

0