AD/Cessna 400/21 Fuel Line Heatshield Installation Cancelled (Cth)
AIRWORTHINESS DIRECTIVE
On the effective date specified below, and for the reasons set out in the background section, the CASA delegate whose signature appears below revokes Airworthiness Directive AD/CESSNA 400/21.
Cessna 400 Series Aeroplanes
| AD/CESSNA 400/21 | Fuel Line Heatshield - Installation | 9/2008 |
Requirement: | CANCELLED. |
| This AD is cancelled on 28 August 2008. | |
Background: | This unique Australian AD, issued in 1971, required modification of the fuel line fittings in the nacelle cover-rib by installing additional heat protection in accordance with Cessna Service Letter ME 70-44. The AD compliance was within 100 hours time in service after 31 August 1971. As all aircraft would have now been modified, the AD is no longer required. |
James Coyne
Delegate of the Civil Aviation Safety Authority
16 July 2008
0
0
0