Ad/Cessna 400/16 - Elevator Control Bob Weight Arm - Inspection - Cancelled (Cth)
AIRWORTHINESS DIRECTIVE
On the effective date specified below, and for the reasons set out in the background section, the CASA delegate whose signature appears below revokes Airworthiness Directive AD/CESSNA 400/16.
Cessna 400 Series Aeroplanes
| AD/CESSNA 400/16 | Elevator Control Bob Weight Arm - Inspection | 10/2008 |
Requirement: | CANCELLED. |
| This AD is cancelled on 25 September 2008. | |
Background: | This unique Australian AD, issued in 1971, required inspection of the elevator control bob weight arm for cracking in the vicinity of the weld. The AD was issued as a result of two reported failures in 1970. The AD compliance was at intervals not exceeding 100 hours time in service after 1 September 1971. A review of the SDR system revealed no further defects have been reported. Therefore, due to no other defects being found, the AD is no longer required. |
James Coyne
Delegate of the Civil Aviation Safety Authority
8 August 2008
0
0
0