AD/Cessna 310/26 Fuel Crossover Line Inspection and Modification Cancelled (Cth)
AIRWORTHINESS DIRECTIVE
On the effective date specified below, and for the reasons set out in the background section, the CASA delegate whose signature appears below revokes Airworthiness Directive AD/CESSNA 310/26.
Cessna 310 Series Aeroplanes
| AD/CESSNA 310/26 | Fuel Crossover Line - Inspection and Modification | 5/2008 |
Requirement: | CANCELLED. |
| This AD is cancelled on 8 May 2008. | |
Background: | This Australian unique airworthiness directive (AD), issued in 1971, required inspection and clamping of the fuel lines in accordance with Cessna Service Letter 70-39 to eliminate possible chafing behind the nacelle firewall, rather than a State of Design AD. Compliance with the AD was within 100 hours time in service after |
David Punshon
Delegate of the Civil Aviation Safety Authority
6 March 2008
0
0
0