AD/BEECH 23/38 Control Column Bearing Assemblies Cancelled (Cth)
AIRWORTHINESS DIRECTIVE
On the effective date specified below, and for the reasons set out in the background section, the CASA delegate whose signature appears below revokes Airworthiness Directive AD/BEECH 23/38.
Beechcraft 19, 23 and 24 Series Aeroplanes
| AD/BEECH 23/38 | Control Column Bearing Assemblies | 4/2008 |
Requirement: | CANCELLED. |
| This AD is cancelled on 10 April 2008. | |
Background: | This AD was raised in 1978 against manufacturer’s mandatory Service Instruction (SI) 1017. The SI required inspection of the control column bearing assemblies for indications of filing or grinding in the weld area. As compliance with this AD was required within 100 hours TIS after 31 May 1979, all aircraft will have been inspected long ago. Hence, the AD is no longer required. |
David Villiers
Delegate of the Civil Aviation Safety Authority
28 February 2008
0
0
0