SUPREME COURT OF QUEENSLAND
CITATION:
Actron Investments Queensland Pty Limited v DEQ Consulting Pty Ltd & Anor [2018] QCA 147
PARTIES:
ACTRON INVESTMENTS QUEENSLAND PTY LIMITED
ACN 124 426 455
(appellant)
v
DEQ CONSULTING PTY LTD
ACN 065 711 248
(first respondent)
MICHAEL HENRY
(second respondent)FILE NO/S:
Appeal No 885 of 2017
SC No 2188 of 2012DIVISION:
Court of Appeal
PROCEEDING:
General Civil Appeal
ORIGINATING COURT:
Supreme Court at Brisbane – [2016] QSC 306DELIVERED ON:
29 June 2018
DELIVERED AT:
Brisbane
HEARING DATE:
25 July 2017
JUDGES:
Fraser and Morrison JA and Atkinson J
ORDERS:
1. Allow the appeal.
2. Set aside the order made in the trial division that the proceeding against the second and third defendants is dismissed.
3. Remit the matter to the trial division for further consideration.
4. Direct that the parties have leave to make written submissions about costs in accordance with the practice direction.
CATCHWORDS:
TRADE AND COMMERCE – COMPETITION, FAIR TRADING AND CONSUMER PROTECTION LEGISLATION – CONSUMER PROTECTION – MISLEADING OR DECEPTIVE CONDUCT OR FALSE REPRESENTATIONS – MISLEADING OR DECEPTIVE CONDUCT GENERALLY – MISLEADING OR DECEPTIVE: WHAT CONSTITUTES – where the appellant purchased a commercial lot in a community titles scheme which included a corporate headquarters/warehouse – where the floor was a floating concrete slab – where the first respondent (through the second respondent) issued a Form 15 Compliance Certificate - Design under the Standard Building Regulation 1993 (Qld) by reference to the Building Code of Australia (2006) – where this form was relied upon and used by the building certifiers as conveying the engineering opinion that the anticipated loads would be resisted by the floating concrete slab without undue settlement – where the building certifier was entitled to rely on the Form 15 for this purpose –where the floating slab subsided due to marine clays in the subsurface shrinking and swelling, and settlement occurred because of the consolidation of compressible marine clays – where the appellant claimed damages against the first respondent pursuant to s 82 Trade Practices Act 1974 (Cth) for misleading and deceptive conduct in contravention of s 52 Trade Practices Act 1974 (Cth) – where the appellant claimed damages against the second respondent for being “a person involved in the contravention” in terms of s 75B of that Act – whether the settlement of the floating slab was “undue” – whether the first respondent’s communication of the Form 15 was misleading conduct in contravention of s 52 Trade Practices Act 1974 – whether the second respondent possessed the knowledge required to render him liable as a party to the first respondent’s contravention
Building Code of Australia (2006)
Standard Building Regulation 1993 (Qld)
Trade Practices Act 1974 (Cth), s 52, s 75B, s 82Campbell v Backoffice Investments Pty Ltd (2009) 238 CLR 304; [2009] HCA 25, cited
Yorke v Lucas (1985) 158 CLR 661; [1985] HCA 65, appliedCOUNSEL:
S Couper QC, with A F Fernon, for the appellant
R J Douglas…
Keep reading for free
Create a free CaseChat account to read Actron Investments Queensland Pty Limited v DEQ Consulting P... and more:
- Read every judgment in full
- Ask AI and get answers linked to paragraphs
- See how each paragraph was cited in later cases
- Download judgments as PDF or Word
One click creates your free account or signs you in.
By continuing you agree to the Terms and Privacy Policy.
Details
- Case
- [2018] QCA 147
- Decision Date
CaseChat Overview and Summary
The legal issues in this case are twofold. First, whether DEQ Consulting's communication of the Form 15 was misleading conduct in contravention of s 52 of the Trade Practices Act. Second, whether Henry Efstathis possessed the knowledge required to render him liable as a party to DEQ Consulting's alleged contravention. The court examined the evidence and found that the Form 15 did not accurately convey the potential for undue settlement of the floating slab, and that Henry Efstathis had the necessary knowledge to be considered a party to the contravention.
The court found that DEQ Consulting's communication of the Form 15 was misleading conduct in contravention of s 52 of the Trade Practices Act. The court held that the Form 15 did not accurately convey the potential for undue settlement of the floating slab, as it failed to account for the specific conditions of the site, including the presence of marine clays. Furthermore, the court found that Henry Efstathis possessed the knowledge required to be considered a party to the contravention, as he was aware of the potential for settlement due to the consolidation of compressible marine clays but did not communicate this information in the Form 15.
The appeal was allowed, and the order made in the trial division that the proceeding against the second and third defendants is dismissed was set aside. The matter was remitted to the trial division for further consideration, and the parties were directed to make written submissions about costs in accordance with the practice direction.
Orders
Orders of the court
1. Allow the appeal.
2. Set aside the order made in the trial division that the proceeding against the second and third defendants is dismissed.
3. Remit the matter to the trial division for further consideration.
4. Direct that the parties have leave to make written submissions about costs in accordance with the practice direction.
Background
Background to the litigation
Evidence
Evidence before the court
Decision
Reasons for decision
Ratio Decidendi
Legal principle established
DEQ and Mr Henry were obliged to comply with the BCA and codes incorporated by it, relevantly including AS1170.1 and AS3600. There are many possible uses of an industrial building. Such a building may be purpose built for a use that requires performance outcomes that are not necessary for other uses. The use of the term “warehouse” to describe the building in DEQ’s fee proposal to DDS, in the Form 16 (certifying that components including the “warehouse slab on ground had been built generally in accordance with the development approval, the referenced documentation [the DEQ drawings] and the Standard Building Regulation”), and the development application decision notice (approving the application for the proposed new “industry/warehouse”),[44] did not define the quality of the construction or range of uses for which the building was designed. The trial judge referred to the fact that the decision notice was for building work for “industry/warehouse” that had been assessed with a building classification Class 8. Table 3.1 in AS1170.1, which set out different imposed actions appropriate to the type of activity or occupancy for which the floor would be used, provided a reference value of 5.0 kPa for a Class 8 building (including factories, workshops and similar buildings (general industrial)) but it provided a reference value of 2.4kPa for each metre of storage height for the use of a Class 7b building for warehousing and storage areas with areas subject to the accumulation of goods.[44]Development application Decision Notice 2 March 2007.Consideration Section 52 of the Trade Practices Act 1974 (Cth) provides, “[a] corporation shall not, in trade or commerce, engage in conduct that is misleading or deceptive or likely to mislead or deceive.” The only element of that provision in issue in the appeal is the requirement that the alleged conduct be misleading. The conduct alleged to be misleading was DEQ’s issue of the Form 15. (I will use the word “issue” to describe the conduct of DEQ, by Mr Henry, in giving to DDS the Form 15 signed by Mr Henry.) The certification in the Form 15 was conditional upon the certified structural elements being installed and carried out in accordance with the information contained in the certification, the relevant information being the nominated DEQ drawings. That condition was fulfilled, as was evidenced by the issue of the Form 16 signed by Mr Henry. Putting that condition aside, Mr Henry, who was described in the Form 15 as a competent person, certified that the items described in the form (the structural elements detailed on the nominated DEQ drawings include the floating slab) “will comply with the Standard Building Regulation”. Consistently with the incorporation in the BCA of AS3600, that Australian Standard is nominated in the form as one of the Australian Standards forming the “Basis of Certification”. Thus the issue of the Form 15 conveyed Mr Henry’s certification that the floating slab will comply with AS3600.