Actron Investments Queensland Pty Limited v DEQ Consulting Pty Ltd

Link copied
Case Copied 39 min read

SUPREME COURT OF QUEENSLAND

CITATION:

Actron Investments Queensland Pty Limited v DEQ Consulting Pty Ltd & Anor [2018] QCA 147

PARTIES:

ACTRON INVESTMENTS QUEENSLAND PTY LIMITED
ACN 124 426 455
(appellant)
v
DEQ CONSULTING PTY LTD
ACN 065 711 248
(first respondent)
MICHAEL HENRY
(second respondent)

FILE NO/S:

Appeal No 885 of 2017
SC No 2188 of 2012

DIVISION:

Court of Appeal

PROCEEDING:

General Civil Appeal

ORIGINATING COURT:


Supreme Court at Brisbane – [2016] QSC 306

DELIVERED ON:

29 June 2018

DELIVERED AT:

Brisbane

HEARING DATE:

25 July 2017

JUDGES:

Fraser and Morrison JA and Atkinson J

ORDERS:

1.       Allow the appeal.

2.       Set aside the order made in the trial division that the proceeding against the second and third defendants is dismissed.

3.       Remit the matter to the trial division for further consideration.

4.       Direct that the parties have leave to make written submissions about costs in accordance with the practice direction.

CATCHWORDS:

TRADE AND COMMERCE – COMPETITION, FAIR TRADING AND CONSUMER PROTECTION LEGISLATION – CONSUMER PROTECTION – MISLEADING OR DECEPTIVE CONDUCT OR FALSE REPRESENTATIONS – MISLEADING OR DECEPTIVE CONDUCT GENERALLY – MISLEADING OR DECEPTIVE: WHAT CONSTITUTES – where the appellant purchased a commercial lot in a community titles scheme which included a corporate headquarters/warehouse – where the floor was a floating concrete slab – where the first respondent (through the second respondent) issued a Form 15 Compliance Certificate - Design under the Standard Building Regulation 1993 (Qld) by reference to the Building Code of Australia (2006) – where this form was relied upon and used by the building certifiers as conveying the engineering opinion that the anticipated loads would be resisted by the floating concrete slab without undue settlement – where the building certifier was entitled to rely on the Form 15 for this purpose –where the floating slab subsided due to marine clays in the subsurface shrinking and swelling, and settlement occurred because of the consolidation of compressible marine clays – where the appellant claimed damages against the first respondent pursuant to s 82 Trade Practices Act 1974 (Cth) for misleading and deceptive conduct in contravention of s 52 Trade Practices Act 1974 (Cth) – where the appellant claimed damages against the second respondent for being “a person involved in the contravention” in terms of s 75B of that Act – whether the settlement of the floating slab was “undue” – whether the first respondent’s communication of the Form 15 was misleading conduct in contravention of s 52 Trade Practices Act 1974 – whether the second respondent possessed the knowledge required to render him liable as a party to the first respondent’s contravention

Building Code of Australia (2006)
Standard Building Regulation 1993 (Qld)
Trade Practices Act 1974 (Cth), s 52, s 75B, s 82

Campbell v Backoffice Investments Pty Ltd (2009) 238 CLR 304; [2009] HCA 25, cited
Yorke v Lucas (1985) 158 CLR 661; [1985] HCA 65, applied

COUNSEL:

S Couper QC, with A F Fernon, for the appellant
R J Douglas…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read Actron Investments Queensland Pty Limited v DEQ Consulting P... and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details

Case
[2018] QCA 147
Decision Date

CaseChat Overview and Summary

The case of Actron Investments Queensland Pty Limited v DEQ Consulting Pty Ltd involves a dispute between the appellant, Actron, and the respondents, DEQ Consulting Pty Ltd and Henry Efstathis. Actron purchased a commercial lot in a community titles scheme which included a corporate headquarters/warehouse. The building's floor was a floating concrete slab, and DEQ Consulting, through its employee Henry Efstathis, issued a Form 15 Compliance Certificate - Design under the Standard Building Regulation 1993 (Qld) by reference to the Building Code of Australia (2006). This form was used by building certifiers to convey the engineering opinion that the anticipated loads would be resisted by the floating concrete slab without undue settlement. However, the slab subsequently subsided due to marine clays in the subsurface shrinking and swelling, leading to settlement because of the consolidation of compressible marine clays. Actron claimed damages against DEQ Consulting and Henry Efstathis for misleading and deceptive conduct in contravention of the Trade Practices Act 1974 (Cth).

The legal issues in this case are twofold. First, whether DEQ Consulting's communication of the Form 15 was misleading conduct in contravention of s 52 of the Trade Practices Act. Second, whether Henry Efstathis possessed the knowledge required to render him liable as a party to DEQ Consulting's alleged contravention. The court examined the evidence and found that the Form 15 did not accurately convey the potential for undue settlement of the floating slab, and that Henry Efstathis had the necessary knowledge to be considered a party to the contravention.

The court found that DEQ Consulting's communication of the Form 15 was misleading conduct in contravention of s 52 of the Trade Practices Act. The court held that the Form 15 did not accurately convey the potential for undue settlement of the floating slab, as it failed to account for the specific conditions of the site, including the presence of marine clays. Furthermore, the court found that Henry Efstathis possessed the knowledge required to be considered a party to the contravention, as he was aware of the potential for settlement due to the consolidation of compressible marine clays but did not communicate this information in the Form 15.

The appeal was allowed, and the order made in the trial division that the proceeding against the second and third defendants is dismissed was set aside. The matter was remitted to the trial division for further consideration, and the parties were directed to make written submissions about costs in accordance with the practice direction.

Orders

Orders of the court

1. Allow the appeal.

2. Set aside the order made in the trial division that the proceeding against the second and third defendants is dismissed.

3. Remit the matter to the trial division for further consideration.

4. Direct that the parties have leave to make written submissions about costs in accordance with the practice direction.

Background

Background to the litigation

Evidence

Evidence before the court

There are two main issues in this appeal. The first is whether DEQ’s communication of the Form 15 to DDS was misleading conduct in contravention of s 52 of the Trade Practices Act. The second issue is whether Mr Henry possessed the knowledge required to render him liable as a party to DEQ’s alleged contravention.Further evidence about the expected subsidence and its effect on the slab The DEQ drawings forming the “referenced documentation” in the Form 15 are identified as S01 to S12 P1. On drawing S01 P1 there are notes: “refer slab plan for design notes for slab on ground… the structural work shown on these drawings has been designed for the following live load unless noted otherwise…warehouse floor 15kPa”; under the heading “FLOOR SLABS”, “the slabs have been designed as a floating slab. Hence movement in the subgrade will result in vertical & curvature movements in the slab along with some minor cracking. Expected movement to be in the range of +/-40 – 70 mm”.[12] Drawing S01 P1 also includes a note, “a limited foundation investigation is available. Should any further information be required the contractor shall arrange the work at his cost.” This plan is endorsed with a stamp by the certifier, A1 Express, that it was noted on 1 March 2007 and that “structural plans have been inspected for conformity of layout with the architectural plans only.” Consistently with the reference to +/- 40 – 70 mm, Mr Henry gave evidence that if the conditions were wet at the time of measurement then the movement might be downwards 40 to 70 mm, but if the conditions were then dry the movement might be 40 to 70 mm upwards.[13][12]One version of the drawings included “?” and another version instead included the symbol “+/-”. There was no challenge to the trial judge’s finding that the relevant drawings included the symbol “+/-”: Reasons [45].[13]T5-6, referred to in Reasons [52]. Drawing S02 P2 is entitled “Slab and Footing Plan”. One of the notes under the heading “Floor Design Loads for Slab” refers to “6 tonne front axle load of solid rubber tyre fork lift trucks with single wheel axles”. The drawing is endorsed with another note: “the slab has been designed as a floating slab. Thus the floor will undergo surface movement that occurs. The floor may also experience settlement due to consolidation at compressible marine clays on site. Differential settlement may occur.” The trial judge considered that this note communicated that there was potential for the floor to undergo two types of movement: “surface movement from the clays shrinking and swelling of 40 to 70mm and settlement due to the consolidation of compressible marine clays.”[14][14]Reasons [48]. Mr Henry gave evidence that the DEQ drawings did not include a schematic diagram for the floor designs loads for the slab where pallet racking was to be installed and said it was his experience that if a slab-on-ground was designed for racking it would be expected to see such a schematic diagram in the engineering drawings.[15] When Mr Henry had earlier prepared a fee proposal for DDS, a director of DDS, Mr McFadden, asked him to design an industrial building with a slab on ground. Mr McFadden told Mr Henry of Efstathis’ requirements that the building have six metres of storage and the portal frame to accommodate a five tonne gantry frame.[15]T5-9 to T5-10, Reasons [62].

Decision

Reasons for decision

Ratio Decidendi

Legal principle established

DEQ and Mr Henry were obliged to comply with the BCA and codes incorporated by it, relevantly including AS1170.1 and AS3600. There are many possible uses of an industrial building. Such a building may be purpose built for a use that requires performance outcomes that are not necessary for other uses. The use of the term “warehouse” to describe the building in DEQ’s fee proposal to DDS, in the Form 16 (certifying that components including the “warehouse slab on ground had been built generally in accordance with the development approval, the referenced documentation [the DEQ drawings] and the Standard Building Regulation”), and the development application decision notice (approving the application for the proposed new “industry/warehouse”),[44] did not define the quality of the construction or range of uses for which the building was designed. The trial judge referred to the fact that the decision notice was for building work for “industry/warehouse” that had been assessed with a building classification Class 8. Table 3.1 in AS1170.1, which set out different imposed actions appropriate to the type of activity or occupancy for which the floor would be used, provided a reference value of 5.0 kPa for a Class 8 building (including factories, workshops and similar buildings (general industrial)) but it provided a reference value of 2.4kPa for each metre of storage height for the use of a Class 7b building for warehousing and storage areas with areas subject to the accumulation of goods.[44]Development application Decision Notice 2 March 2007.Consideration Section 52 of the Trade Practices Act 1974 (Cth) provides, “[a] corporation shall not, in trade or commerce, engage in conduct that is misleading or deceptive or likely to mislead or deceive.” The only element of that provision in issue in the appeal is the requirement that the alleged conduct be misleading. The conduct alleged to be misleading was DEQ’s issue of the Form 15. (I will use the word “issue” to describe the conduct of DEQ, by Mr Henry, in giving to DDS the Form 15 signed by Mr Henry.) The certification in the Form 15 was conditional upon the certified structural elements being installed and carried out in accordance with the information contained in the certification, the relevant information being the nominated DEQ drawings. That condition was fulfilled, as was evidenced by the issue of the Form 16 signed by Mr Henry. Putting that condition aside, Mr Henry, who was described in the Form 15 as a competent person, certified that the items described in the form (the structural elements detailed on the nominated DEQ drawings include the floating slab) “will comply with the Standard Building Regulation”. Consistently with the incorporation in the BCA of AS3600, that Australian Standard is nominated in the form as one of the Australian Standards forming the “Basis of Certification”. Thus the issue of the Form 15 conveyed Mr Henry’s certification that the floating slab will comply with AS3600.