4 yearly review of modern awards—Group 4 awards

Link copied
Case Copied 6 min read
[2016] FWC 5694
FAIR WORK COMMISSION

STATEMENT


Fair Work Act 2009

s.156 - 4 yearly review of modern awards

4 yearly review of modern awards—Group 4 awards
(AM2014/250 and others)

JUSTICE ROSS, PRESIDENT

MELBOURNE, 15 AUGUST 2016

4 yearly review of modern awards – award stage – Group 4 awards.

[1] Section 156 of the Fair Work Act 2009 (the Act) requires the Fair Work Commission (the Commission) to review all modern awards every four years (the Review). In the Award stage of the Review the 122 modern awards have been divided into 4 groups. The awards allocated to Group 4 are listed at Attachment A to this Statement. As proposed in the 24 February 2016 Statement 1 the 40 awards in Group 4 will be dealt with in two tranches – sub-groups 4A, 4B & 4C and sub-groups 4D, 4E & 4F. A Statement and amended directions were issued on 10 May 20162 outlining the proposed timetable for dealing with the awards in Group 4. A further statement, issued on 15 July 20163, vacated the directions in relation to the Construction awards4 and varied the proposed timetable for the remaining matters.

[2] Due to the resource demands associated with the Review, the timetable for finalising the review of Group 4 awards has been further deferred as set out below.

Group 4A, 4B & 4C

[3] In the February 2016 Statement, claims to vary the provisions in the Construction awards were referred to Senior Deputy President Watson. A number of conciliation conferences were held before Senior Deputy President Watson, most recently on 2 August 2016. The Senior Deputy President has provided a Report which outlines the following process for determining the issues in respect of the Construction Group Awards:

    (i) The common claims in the Building and Construction General On-site Award 2010, the Joinery and Building Trades Award 2010 and the Mobile Crane Hiring Award 2010 will be referred to a separately constituted Full Bench for determination and directions will be issued in due course.
    (ii) The remaining technical and drafting issues in the 3 awards above will be dealt with in the timetable below.
    (iii) The industry-specific redundancy scheme in the Plumbing and Fire Sprinklers Award 2010 will be determined by the Full Bench at the same time it deals with the industry-specific redundancy schemes in the Construction awards.
    (iv) The remaining substantive claims in the Plumbing and Fire Sprinklers Award 2010 will be dealt with separately by the Full Bench dealing with 3 awards above.
    (v) The technical and drafting issues in the Plumbing and Fire Sprinklers Award 2010 will be dealt with in the Group 4 timetable below.

[4] The amended directions of 10 May 2016 in respect to the Plumbing and Fire Sprinklers Award 2010, were varied to require the filing of submissions in reply by 3 August 2016.

[5] The amended directions of 10 May 2016 also required reply submissions on the drafting and technical issues in relation to groups 4A, 4B and…

CaseChat AU logo

Keep reading for free

Create a free CaseChat account to read 4 yearly review of modern awards—Group 4 awards and more:

  • Read every judgment in full
  • Ask AI and get answers linked to paragraphs
  • See how each paragraph was cited in later cases
  • Download judgments as PDF or Word
Continue with Google

One click creates your free account or signs you in.

By continuing you agree to the Terms and Privacy Policy.

Details
Case
[2016] FWC 5694
Decision Date

CaseChat Overview and Summary

The Fair Work Commission was tasked with reviewing 40 modern awards, which were divided into four groups, as required by section 156 of the Fair Work Act 2009. The review process has been divided into two phases: the first phase involves drafting and technical issues, while the second phase focuses on substantive issues. This case deals with the first phase of the review for Group 4 awards, which include various industries such as construction, plumbing, and fire sprinklers. The Commission was required to determine the legal issues arising from the review process, including the allocation of resources and the timelines for the review.

The Commission faced the challenge of managing the workload associated with the review of these awards, given the significant resource demands. The court had to decide on the appropriate timetable for the review, taking into account the need to ensure fairness and efficiency in the process. The Commission was also required to consider the recommendations of the Senior Deputy President, who had been handling the substantive issues in the construction awards. Additionally, the court had to determine the appropriate process for dealing with the drafting and technical issues in the remaining awards, as well as the timing for the publication of exposure drafts.

The Fair Work Commission decided to further defer the timetable for finalising the review of Group 4 awards due to the resource demands associated with the review. The court allocated the awards into sub-groups, with sub-groups 4A, 4B, and 4C to be dealt with in the first phase, and sub-groups 4D, 4E, and 4F to be dealt with in the second phase. The court also decided to refer the common claims in the Building and Construction General On-site Award 2010, the Joinery and Building Trades Award 2010, and the Mobile Crane Hiring Award 2010 to a separately constituted Full Bench for determination. The court further decided to defer the publication of exposure drafts for the awards allocated to Groups 4D, 4E, and 4F until October 2016, and varied the directions for filing material for these awards accordingly. The court also scheduled hearings for November 2016 and February 2017 to address the drafting and technical issues in the remaining awards.

The Fair Work Commission issued amended directions to reflect the changes in the timetable for the review of Group 4 awards. The court also scheduled a mention on 24 August 2016 to provide an opportunity for any interested person to raise any issues in respect of the programming of the review of the Group 4 awards. The Commission will be sitting in Sydney, and requests for video links should be sent to the specified email address.

Orders

Orders of the court

Background

Background to the litigation

Evidence

Evidence Before The Court

Decision

Reasons for decision

Ratio Decidendi

Legal Principle Established