| [2019] FWCFB 6860 |
| FAIR WORK COMMISSION |
DECISION |
Fair Work Act 2009
s.156 - 4 yearly review of modern awards
4 yearly review of modern awards—Construction awards
(AM2016/23)
Building, metal and civil construction industries | |
VICE PRESIDENT HATCHER | SYDNEY, 31 OCTOBER 2019 |
Four yearly review of modern awards – Group 4 Awards – Construction awards – Building and Construction General On-site Award 2010 – Joinery and Building Trades Award 2010 – Mobile Crane Hiring Award 2010 – Plumbing and Fire Sprinklers Award 2010 – substantive matters.
Introduction and Background
[1] On 26 September 2018 we issued a decision (September Decision) 1 dealing with the substantive claims in relation to the Building and Construction General On-Site Award 2010 (Building Award), the Joinery and Building Trades Award 2010 (Joinery Award), Mobile Crane Hiring Award 2010 (Mobile Crane Award) and the Plumbing and Fire Sprinklers Award 2010 (Plumbing Award), collectively the “Construction Awards”.
[2] In the September Decision we determined, amongst other things, that the array of disability allowances for which provision is made in the Building Award is not consistent with the modern awards objective. 2 We also determined to retain the multistorey allowance but all other disability allowances would be abolished and replaced by an enhanced industry allowance, variable in quantum having regard to the particular industry sector in which an employee is engaged.3
[3] By abolishing the disability allowances and replacing them with an enhanced industry allowance, we sought to simplify the current system of allowance prescription under the Building Award. We recognised that a different quantum of the industry allowance is appropriate across the sectors covered by the Building Award because the various disability allowances are paid more frequently on larger commercial building and construction and civil engineering and construction projects than in the smaller scale residential building and construction sector. We therefore set out an all-purpose industry allowance for two broadly described sectors: residential building and construction (defined by reference to the activities in clause 4.10(a) of the Building Award undertaken in relation to single occupancy residential building which is not a multi-storey building), and all other building and construction including civil construction and metal and engineering construction.
[4] We also set out our provisional view concerning the quantum of the proposed sectorial industry allowances - an all-purpose industry allowance of 4% applicable to the residential building and construction sector and 5% for all other building and construction work. 4
[5] We invited interested parties to advance any alternative proposals, make any submissions and to confer in relation to the quantum of the proposed sectorial industry allowances. 5 Interested parties were also provided with the opportunity to request a further conference or hearing to be conducted in relation to this issue.6
[6] A conference was held on 1 November 2018 for the purpose of dealing with the proposed amendment to the Building Award industry allowances, special and disability allowances. At the conclusion of the conference, the parties were directed to…
Keep reading for free
Create a free CaseChat account to read 4 yearly review of modern awards—Construction awards and more:
- Read every judgment in full
- Ask AI and get answers linked to paragraphs
- See how each paragraph was cited in later cases
- Download judgments as PDF or Word
One click creates your free account or signs you in.
By continuing you agree to the Terms and Privacy Policy.
- Case
- [2019] FWCFB 6860
- Decision Date
CaseChat Overview and Summary
The Commission examined numerous substantive matters, including wage rates, classification structures, and other employment conditions. It sought to balance the interests of employers and employees, considering economic factors, productivity, and the need to maintain a competitive and sustainable construction industry. The Commission also took into account submissions from various stakeholders, including industry bodies, unions, and other interested parties. The legal issues before the Commission involved interpreting the relevant legislation and determining whether any changes to the awards were necessary to address contemporary challenges and maintain a fair and balanced industrial relations system.
After careful consideration of the evidence and submissions, the Commission concluded that while some adjustments were necessary to address specific issues, the overall structure and content of the awards remained appropriate. The Commission made several changes to wage rates and conditions to reflect changes in the industry and to ensure fairness and competitiveness. The Commission also noted the importance of continuing dialogue between employers and employees to address any emerging issues and to maintain a stable and productive industrial relations environment. The Commission's decisions were based on a comprehensive analysis of the evidence and a commitment to upholding the principles of fairness, flexibility, and sustainability in the construction industry.
The final orders included amendments to wage rates and conditions in the relevant awards, reflecting the Commission's determinations. The changes were designed to address specific issues identified during the review while maintaining a balanced approach that considered the interests of both employers and employees. The Commission emphasised the importance of ongoing consultation and cooperation between industry stakeholders to ensure the continued effectiveness of the awards in providing fair and reasonable terms and conditions of employment in the construction sector.
Orders
Orders of the court
Background
Background to the litigation
Evidence
Evidence Before The Court
Decision
Reasons for decision
Ratio Decidendi