Water (Accredited Water Resource Plan—Great Artesian Basin Shallow) Instrument 2023

Administered by Department of Climate Change, Energy, the Environment and Water

Legislation au F2023L01638 In force Legislative Instrument

Legislation content

EXPLANATORY STATEMENT

 

Issued by the Minister for the Environment and Water

 

Water Act 2007

 

Water (Accredited Water Resource Plan—NSW Great Artesian Basin Shallow) Instrument 2023

 

Legislative Authority

 

The Water Act 2007 (the Act) makes provision for the management of the water resources of the Murray–Darling Basin, and for other matters of national interest in relation to water and water information, and for related purposes.

 

Subsection 54(1) of the Act requires that there be a water resource plan for each water resource plan area identified in the Basin Plan 2012 (the Basin Plan). Water resource plans set out water management arrangements for surface water and groundwater within each water resource plan area.

 

Section 63 of the Act sets out the process for accrediting water resource plans prepared by Basin States (Queensland, New South Wales, Victoria, South Australia and the Australian Capital Territory).

 

Subsection 63(1) provides that a Basin State may give a proposed water resource plan to the Murray–Darling Basin Authority (the Authority) for a water resource plan area located within the Basin State and ask the Authority to give the proposed water resource plan to the Minister for accreditation.

 

If a water resource plan area is adjacent to a water resource plan area in another Basin State, subsection 63(2) provides that the proposed water resource plan must be prepared in consultation with that other Basin State.

 

Subsection 63(3) provides that the Authority must consider the proposed water resource plan, prepare recommendations for the Minister on whether the proposed water resource plan should be accredited and give the proposed resource plan and recommendations to the Minister.

 

If the Authority gives the Minister a proposed water resource plan and recommendations, pursuant to subsection 63(5) the Minister must consider the proposed water resource plan and the recommendations and may either accredit, or not accredit, the plan.

 

Under subsection 63(6) the Minister must accredit a proposed water resource plan if satisfied that the plan is consistent with the relevant Basin Plan. The relevant Basin Plan for the water resource plan is the version of the Basin Plan that the Minister applies in relation to the water resource plan under subsection 56(2) of the Act.

 

Section 63(7) provides that the decision by the Minister to accredit, or not to accredit, a plan must be made in writing and is a non-disallowable legislative instrument. Paragraph 63(7)(b) specifically provides that the decision by the Minister to accredit, or not to accredit a plan is a legislative instrument.

Section 42 (disallowance) of the Legislation Act 2003 (Legislation Act) does not apply to the decision of the Minister.

 

A decision to accredit a water resource plan under section 63 of the Act is also not subject to sunsetting as outlined in Part 4 of Chapter 3 of the Legislation Act. This exemption operates by force of law in accordance with item 67 of the table under section 12 of the Legislation (Exemptions and Other Matters) Regulation 2015. It is appropriate to exempt this type of legislative instrument from sunsetting as, together with the Act and Basin Plan, it underpins an intergovernmental scheme involving the Commonwealth and the Basin States to manage the Murray–Darling Basin. The management of the Murray–Darling Basin is facilitated through ongoing cooperation between the Commonwealth and the Basin States, and the potential sunsetting of such instrument could undermine this intergovernmental cooperation.

 

Water resource plans are a critical element of the Basin Plan. They are the main mechanism through which the Commonwealth enforces sustainable diversion limits. In the absence of accredited water resource plans the Inspector-General of Water Compliance’s compliance and enforcement powers are limited.

 

The Water (Accredited Water Resource Plan— NSW Great Artesian Basin Shallow) Instrument 2023 (the Instrument) has been made in compliance with all legislative preconditions and applicable legislative requirements.

 

Purpose

 

The purpose of the Instrument is to set out the decision of the Minister for the Environment and Water (the Minister) to accredit the proposed water resource plan (the plan) for the NSW Great Artesian Basin Shallow water resource plan area, for the purposes of subparagraph 63(5)(b)(i) of the Act.

 

On 5 December 2023, the Authority gave the Minister the plan and recommended that the Minister accredit the plan.

 

As required under subsection 63(5), the Minister considered the plan and the Authority’s recommendations.

 

In accordance with subsection 56(1), the Minister had regard to the extent to which the plan is consistent with the Basin Plan under subsection 56(2). The relevant Basin Plan for the plan (pursuant to subsection 56(2) and subsection 56(2A)) is the version that was registered on 27

October 2021. The Minister was satisfied that the plan is consistent with the relevant Basin Plan and for the purposes of subparagraph 63(5)(b)(i), decided to accredit the plan.

 

Background
 

The plan was developed by the State of New South Wales, in consultation with key stakeholders and regional communities.

 

The Authority published the plan titled NSW Great Artesian Basin Shallow Water Resource Plan on their website at https://www.mdba.gov.au/publications-and-data/publications/new-south-wales-great-artesian-basin-shallow-water-resource-plan. The plan sets out how New South Wales will meet its obligations under the Basin Plan in the NSW Great Artesian Basin Shallow water resource plan area.

 

The plan applies to all groundwater covered by the groundwater sustainable diversion limit (SDL) resource units within the NSW Great Artesian Basin Shallow water resource plan area. Section 6.03 of the Basin Plan provides that a groundwater SDL resource unit referred to in column 1 of the table in Schedule 4 consists of all groundwater resources described in column 2 of the same table. For the NSW Great Artesian Basin Shallow water resource plan area, the SDL resource units are specified in items 54 to 56. They are the NSW GAB Surat Shallow, NSW GAB Warrego Shallow, and NSW GAB Central Shallow.

 

As required by subsection 63(3) of the Act, the Authority considered the plan and prepared recommendations for the Minister on whether the plan should be accredited. The Authority considered that the plan met requirements for accreditation and recommended that the Minister accredit the plan. On 5 December 2023, the Authority provided the Minister with the plan and the recommendation that the Minister accredit the plan.

 

The Minister considered the plan and the Authority’s recommendations as required by subsection 63(5) of the Act and was satisfied that the plan is consistent with the relevant Basin Plan. As required by subsection 63(6) of the Act, the Minister made the decision to accredit the plan.

 

Impact and Effect

 

The plan is given effect through sections 58 and 59 of the Act.

 

Section 58 provides that the Authority and any other agency of the Commonwealth must perform its functions, and exercise its powers, consistently with, and in a manner that gives effect to, an accredited water resource plan, subject to specified exceptions.

 

Section 59 provides that the Basin Officials Committee, an agency of a Basin State, an operating authority, an infrastructure operator or the holder of a water access right must not act inconsistently with, or fail to act consistently with, an accredited water resource plan. 

 

The accreditation of the plan, together with these sections, will impose legal obligations for Commonwealth agencies (including the Authority), other agencies and bodies and New South Wales. The plan sets out arrangements for water sharing within the sustainable diversion limits for the water resource plan area, establishes rules to meet environmental and water quality objectives and will take into account and manage or mitigate potential and emerging risks to water resources.

 

Consultation

 

Section 17 of the Legislation Act requires that the rule-maker must be satisfied that any consultation that the rule-maker considers to be appropriate and reasonably practicable to undertake has been undertaken.

 

Under section 10.07 of the Basin Plan, a water resource plan must contain a description of the consultation in relation to the plan (including in relation to any part of the plan), if any, that was undertaken before the State gave the plan to the Authority under subsection 63(1) of the Act. In addition, sections 10.52 and 10.53 of the Basin Plan provides that a water resource plan must be prepared having regard to the views of relevant Indigenous organisations. In preparing the plan, New South Wales undertook extensive community consultation, and consultation with relevant Indigenous organisations including First Nations peoples using a nation-based approach in relation to Part 14 of Chapter 10 of the Basin Plan.

 

Consultation by New South Wales occurred in the form of broad public consultation via submissions processes and a public exhibition phase, targeted consultation with key stakeholders such as NSW Groundwater Stakeholder Advisory Panels, and consultation with First Nations, including The Native Title Services Corporation (NTS Corp), Local Aboriginal Land Councils, native title groups and other relevant Aboriginal organisations.

 

Nation Consultation Reports for the Barkandji/Maljangapa and Gomeroi/Kamilaroi/Gamilaroi/Gamilaraay Nations are not incorporated into the proposed Plan. As a consequence, Barkandji/Maljangapa and Gomeroi/Kamilaroi/Gamilaroi/Gamilaraay Nations objectives and outcomes for water management based on their values and uses are not yet identified.

 

NSW has addressed these issues and committed in the proposed Plan to seek further opportunities to consult with the Barkandji/Maljangapa and Gomeroi/Kamilaroi/Gamilaroi/Gamilaraay Nations. This consultation would aim to finalise the identification of objectives and outcomes based on the Nations’ values and uses for the water resources of the proposed Plan area, and to incorporate those objectives and outcomes – subject to each Nations’ agreement – into the proposed Plan. The proposed Plan commits NSW to report back to the MDBA regarding progress within two years of accreditation.

 

First Nations’ advice was sought on whether the proposed Plan is consistent with Basin Plan requirements regarding Indigenous values and uses as outlined in Part 14 of Chapter 10. The First Nations’ advice was coordinated by i2i Development Global Pty Ltd (i2i Global). In preparing the advice, i2i Global undertook consultation with relevant First Nations representatives from the WRP area on whether the plan is consistent with the requirements.

 

In considering the plan and preparing its recommendation, the Authority reviewed the First Nations advice as coordinated by i2i Global. The Authority determined that the Indigenous values and uses content of the plan is consistent with the Basin Plan.
 

Section 63(2) of the Act requires that if a water resource plan area is adjacent to a water resource plan area in another Basin state, the proposed water resource plan must be prepared in consultation with that State. The water resource plan area is adjacent to water resource plan areas in Queensland. The Authority is satisfied that the proposed water resource plan was prepared in consultation with Queensland.

 

The Authority determined that the consultation requirements had been met.

 

Prior to making this Instrument, the Department of Climate Change, Energy, the Environment and Water consulted with the Authority as part of the process set out in section 63 of the Act.

 

As extensive consultation was undertaken in the preparation of the plan by New South Wales, it was considered unnecessary to undertake additional consultation in relation to the specific instrument. It is sufficient to rely on the consultation process undertaken by New South Wales, and subsequent consultation by the Authority with relevant First Nations organisations for this Instrument, as the Instrument is focused on the decision to accredit the plan, not the content of the plan itself. 

 

The Office of Best Practice Regulation has advised that the Instrument does not require a regulation impact statement (ID: 21669).

 

Details / Operation

 

Details of the Instrument are set out in Attachment A.

 

As set out above, paragraph 63(7)(b) of the Act provides that a decision by the Minister to accredit, or not to accredit, a water resource plan is a legislative instrument, but that section 42 (disallowance) of the Legislation Act does not apply to the decision. The effect of this provision is provided for under paragraph 44(2)(a) of the Legislation Act which provides that section 42 (disallowance) does not apply in relation to a legislative instrument if an Act declares, or has the effect, that section 42 does not apply in relation to the instrument or provision.

 

Part 4 of Chapter 3 (sunsetting) of the Legislation Act specifies that legislative instruments are automatically repealed after a fixed period of time (subject to some exceptions) and such an automatic repeal is called sunsetting. However, under paragraph 54(2)(b) of the Legislation Act, this Part does not apply in relation to a legislative instrument if it is prescribed by regulation for the purposes of this paragraph. Item 67 of the table under section 12 of the Legislation (Exemptions and Other Matters) Regulation 2015 specifies that Part 4 of Chapter 3 of the Legislation Act does not apply to a decision to accredit a water resource plan under section 63 of the Act.

 

The Instrument is therefore a legislative instrument for the purposes of the Legislation Act, but disallowance and sunsetting do not apply.

 

As the Instrument is not a disallowable instrument, paragraph 15J(2)(f) of the Legislation Act provides that a statement of compatibility prepared under subsection 9(1) of the Human Rights (Parliamentary Scrutiny) Act 2011 is not required. Consequently, a statement of compatibility with Human Rights has not been prepared.

 


Attachment A

 

Water (Accredited Water Resource Plan— NSW Great Artesian Basin Shallow) Instrument 2023

Section 1—Name

This section provides that the name of the instrument is the Water (Accredited Water Resource Plan— NSW Great Artesian Basin Shallow) Instrument 2023 (the Instrument).

Section 2—Commencement

This section provides that the Instrument commences the day after it is registered on the Federal Register of Legislation.

Section 3—Authority

This section provides that the Instrument is made under section 63 of the Water Act 2007.

Section 4—Definitions

This section sets out the definitions used throughout the Instrument.

The term ‘Act’ is defined to mean the Water Act 2007.

This section also includes a note that explains that a number of expressions used in the Instrument are defined in section 4 of the Act, including “Authority”, “Basin Plan”, “water resource plan” and “water resource plan area”.

Section 5—Accredited water resource plan

Subsection 5(1) provides that the proposed water resource plan for the NSW Great Artesian Basin Shallow water resource plan area specified in subsection (2) is accredited.

The accreditation is for the purposes of subparagraph 63(5)(b)(i) of the Act that provides that if the Authority gives the Minister a proposed water resource plan and recommendations under subsection 63(3) of the Act, the Minister may either accredit, or not accredit, the plan.

Subsection 5(2) specifies the plan that is accredited for the purpose of subsection (1). The plan is the document titled NSW Great Artesian Basin Shallow Water Resource Plan as in force on the day that the Minister made the Instrument, excluding any material identified as not forming part of the plan. The exclusion is required to make clear that there is material contained within the document that is not intended for accreditation. The document clearly sets out the structure and form to assist with reading and identifies the material that is not intended for accreditation.

 

Three notes follow subsection 5(2).

 

Note 1 explains that the plan could be found on the Authority website at www.mdba.gov.au in 2023.

 

A specific URL is not cited in order to avoid a possible dead link (or where a hyperlink on a website has been moved or deleted) following an anticipated future website design. To mitigate any concerns associated with website design, the Authority has clear, accurate and user-friendly headings and titles to ensure that a member of the public can locate and access the plan on the Authority’s website.

 

Note 2 provides that the plan meets the requirements that a water resource plan for a water resource plan area must comply with to be accredited. The note directs the reader to table item 11 of subsection 22(1) of the Act and Chapter 10 of the Basin Plan.

 

Note 3 provides that the accreditation of the plan ceases to have effect in accordance with the Act. The note directs the reader to sections 54 and 64 of the Act.

 

Overview

The Water (Accredited Water Resource Plan—NSW Great Artesian Basin Shallow) Instrument 2023 was enacted to address the requirement under the Water Act 2007 for the accreditation of water resource plans for each water resource plan area in the Murray–Darling Basin. This legislative instrument was introduced by the Minister for the Environment and Water to ensure that the water management arrangements in the NSW Great Artesian Basin Shallow water resource plan area are consistent with the Basin Plan. The instrument outlines the Minister's decision to accredit the proposed water resource plan for this area, following consultation with the Murray–Darling Basin Authority and relevant stakeholders. This accreditation is crucial for enforcing sustainable water usage and environmental protection in accordance with the overarching objectives of the Basin Plan. Developed by New South Wales in consultation with regional communities and key stakeholders, the plan was reviewed by the Murray–Darling Basin Authority, which recommended its accreditation to the Minister. The Minister's decision to accredit the plan was based on its alignment with the relevant Basin Plan and the completion of required consultations, including those with Indigenous organisations. This accreditation imposes legal obligations on various entities to act in accordance with the plan, ensuring the sustainable management of water resources in the NSW Great Artesian Basin Shallow area.

Scope and Application

The Water (Accredited Water Resource Plan—NSW Great Artesian Basin Shallow) Instrument 2023 applies to the proposed water resource plan for the NSW Great Artesian Basin Shallow water resource plan area, which has been accredited by the Minister for the Environment and Water under the Water Act 2007. The Act pertains to the management of water resources in the Murray–Darling Basin, including the establishment and accreditation of water resource plans for various water resource plan areas. The geographic reach of the Act extends to the Commonwealth and the Basin States, which include New South Wales, Queensland, Victoria, South Australia, and the Australian Capital Territory. The accreditation of water resource plans is a critical function of the Minister, who must ensure that the plans are consistent with the relevant Basin Plan. This Instrument is a legislative instrument under the Legislation Act 2003, but it is exempt from disallowance and sunsetting provisions. The decision to accredit a water resource plan is not subject to disallowance under section 42 of the Legislation Act, and the Instrument is exempt from the automatic repeal provisions outlined in Part 4 of Chapter 3 of the Legislation Act, effectively preventing it from sunsetting. The accreditation of this specific plan follows a comprehensive consultation process undertaken by New South Wales with key stakeholders, regional communities, and relevant Indigenous organisations, ensuring the plan aligns with the requirements set out in the Basin Plan and respects Indigenous values and uses. The Instrument is effective from the day after its registration on the Federal Register of Legislation, and it sets out the decision to accredit the NSW Great Artesian Basin Shallow Water Resource Plan as per the legislative requirements under the Water Act 2007.

Key Provisions

The Water (Accredited Water Resource Plan— NSW Great Artesian Basin Shallow) Instrument 2023 outlines the decision of the Minister for the Environment and Water to accredit the proposed water resource plan for the NSW Great Artesian Basin Shallow water resource plan area. This accreditation is conducted under section 63 of the Water Act 2007, which requires that water resource plans for each water resource plan area identified in the Basin Plan be established. The plan, titled "NSW Great Artesian Basin Shallow Water Resource Plan," was developed by New South Wales in consultation with stakeholders and regional communities and is intended to guide how New South Wales will meet its obligations under the Basin Plan within the specified water resource plan area. The obligations imposed by this Act primarily involve ensuring that all parties adhere to the accredited water resource plan. Under sections 58 and 59 of the Act, Commonwealth agencies, including the Murray–Darling Basin Authority, and other entities such as Basin State agencies, operating authorities, infrastructure operators, and holders of water access rights, must perform their functions and exercise their powers in a manner consistent with the accredited plan. This includes adhering to the sustainable diversion limits, environmental and water quality objectives, and other provisions outlined in the plan. Violations of the requirements set out in the accredited water resource plan may result in civil or criminal penalties. While specific penalties are not detailed in the explanatory statement, breaches of water resource plans can lead to enforcement actions by the Inspector-General of Water Compliance, which may include fines, legal action, or other remedial measures as stipulated in the Water Act 2007 and related regulations. The accredited water resource plans are critical in enforcing sustainable diversion limits, and without them, the enforcement powers of the Inspector-General are significantly limited. The accreditation process itself involves several steps, including consultation with relevant stakeholders and First Nations groups, as well as consideration by the Murray–Darling Basin Authority and the Minister. The decision to accredit the plan is a legislative instrument and is not subject to disallowance or sunsetting, ensuring the continuity and stability of water resource management arrangements within the Murray–Darling Basin.

Legal classification tags

Area of Law
Environmental Law
Water Law
Instrument
Legislative Instrument
Concepts
Commencement Provisions
Licensing & Registration
Reporting & Disclosure Obligations

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.