Variation of Pipeline Licence WA-5-PL

Administered by Department of Industry, Science and Resources

Legislation au C2018G01025 In force Gazette

Legislation content

 

COMMONWEALTH OF AUSTRALIA

 

Sections 226 and 708

Offshore Petroleum and Greenhouse Gas Storage Act 2006

 

VARIATION OF PIPELINE LICENCE WA-5-PL

 

I, JOANNE JENNIFER BELL, Delegate of the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Western Australia Offshore Petroleum Joint Authority hereby vary Pipeline Licence WA-5-PL as set out below.  

 

  1. The First Schedule of the Licence is varied by deleting the words:

 

The route of the pipeline shall be as described in the table below, from and including the boundary of Pipeline Licence WA-21-PL and WA-5-PL at the western end of the East Spar manifold at or about 7,707,290.78mN, 290,101.15mE to the pipeline licence boundary of TPL-12 at or about 7,714,306.54mN, 330,042.88mE along a line no point of which shall be more than 125 metres from the proposed pipeline route as shown in the drawing attached to the Licence as Annexure ‘A’.  The coordinates given above are relative to UTM zone 50, with Central Meridian 117 deg E based on Geodetic Datum of Australia (GDA94).

 

Feature ID

Feature Name

Kilometre Point

UTM Zone

Easting (mE)

Northing (mN)

1 (start)

Boundary of WA21PL and WA5PL

0

Zone 50

290,101.15

7,707,290.78

2

East Spar Manifold Tiein Flange (Connection to

Z-Spool Flange)

0.02

Zone 50

290,117.00

7,707,292.00

3

14” East Spar Pipeline Flange (Connection to ZSpool Flange)

0.05

Zone 50

290,128.92

7,707,316.25

4

Intersection Point (IP) 1

23.0

Zone 50

312,897.64

7,710,670.05

5

IP 2

26.2

Zone 50

315,961.70

7,711,378.97

6

IP 3

30.7

Zone 50

320,430.55

7,712,179.87

7 (end)

Boundary of WA5PL and TPL12

40.6

Zone 50

330,034.86

7,714,304.73

 

 and replacing with:

 

The route of the pipeline shall be as described in the table below, from and including the boundary of Pipeline Licence WA-21-PL and WA-5-PL at the tie-in flange at or about 7,707,290.78mN, 290,101.15mE to the pipeline licence boundary of TPL-12 at or about 7,714,304.73mN, 330,034.86mE along a line no point of which shall be more than 125 metres from the proposed pipeline route as shown in the drawing attached to the Licence as Annexure ‘A’.  The coordinates given above are relative to UTM zone 50, with Central Meridian 117
deg E based on Geodetic Datum of Australia (GDA94).

 

Feature ID

Feature Name

UTM Zone

Easting (mE)

Northing (mN)

1

Boundary of WA21PL and WA5PL (start point)

Zone 50

290,101.15

7,707,290.78

2

East Spar Tiein Flange (Connection to Z-Spool Flange)

Zone 50

290,117.00

7,707,292.00

3

14” East Spar Pipeline Flange (Connection to ZSpool Flange)

Zone 50

290,128.92

7,707,316.25

4

Intersection Point (IP) 1

Zone 50

312,897.64

7,710,670.05

5

IP 2

Zone 50

315,961.70

7,711,378.97

6

IP 3

Zone 50

320,430.55

7,712,179.87

7

Boundary of WA5PL and TPL12 (end point)

Zone 50

330,034.86

7,714,304.73

 

2.      The Second Schedule of Part 1 Specifications of the Licence is varied by:

 

a)      Deleting from Section (A) Design subsection (n) the words:

 

67 (manifold), 66 (subsea pipeline)

 

And replacing with:

 

“66”

 

b)     Deleting from Section (A) Design subsection (p) the words:

 

“Substance to be conveyed: Corrosion inhibited 3-phase wellstream

Maximum CO2 content (%Vol): 2.0 Mole %

Maximum water content (mg/m3): 7,000

Maximum hydrogen sulphide (mg/m3): 2

Maximum sulphur (mg/m3): 2”

 

And replacing with:

 

“Substance to be conveyed: Corrosion inhibited 3-phase wellstream”.

 

c)      Deleting from Section (A) Design subsection (w) the words:

 

“25m adjacent to the manifold”

 

And replacing with:

 

“25m adjacent to East Spar Tie-in Spool

 

d)     Deleting from Section (A) Design subsection (y) the words:

 

“Subsea:
Pipeline licence includes East Spar Manifold. All manifold piping and valves manufactured from corrosion resistant alloy (duplex) suitable for the produced fluids.
Manifold piping sized to match the pipeline and designed in accordance with API 6A. Piping and valves are interconnected by means of flanges or hubs/clamps.
Support structure designed in accordance with API RP 2A. Free standing and supported by mudmats.
LastOff Valve Replacement Spool (Replacing Valve LOV2010)
14” Linepipe (355.6 mm OD, 1276mm Length, 15.9 mm WT)
Material:  API5LX65 Test Pressure 38MPa”

And replacing with:

 

“Subsea: Not Applicable”

 

e)      Deleting from Section (A) Design subsection (z) the words:

 

“East Spar Manifold/ Pipeline Tie-in Spool

14” Line pipe (355.6 mm OD, 37.2m
Length, 15.9 mm WT)
Material:  API5L-X65
Test Pressure: 25MPa”

 

And replacing with:

 

“Pipeline Tie‐in Spool(s)

Pipeline Tie-in Spool

14” Line pipe (355.6 mm OD, 37.2m
Length, 15.9 mm WT)
Material:  API‐5L-X65
Test Pressure: 25MPa

 

East Spar Tie-in Spool

14” Line pipe (355.6 mm OD, 15m
Length, 19.7 mm WT)
Material:  API‐5L-X65
Test Pressure: 25MPa”

 

f)       Deleting from Section (A) Design subsection (aa) the words:

 

“No permanent facilities installed”

 

And replacing with:

 

“ES PLET installed in WA-21-PL with diverless connector to allow for diverless pig launching.”

 

3.      The WA-5-PL Pipeline Route Map at ‘Annexure A’ of the Licence is deleted and replaced with the map at Annexure A of this instrument. 

 

The variation takes effect on the day on which a notice of the variation is published in the Commonwealth Government Gazette.

 

Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006
of the Commonwealth of Australia.

 

JOANNE JENNIFER BELL

DELEGATE OF THE TITLES ADMINISTRATOR

ON BEHALF OF THE COMMONWEALTH–WESTERN AUSTRALIA
OFFSHORE PETROLEUM JOINT AUTHORITY

 

 


Annexure A

VARIATION OF PIPELINE LICENCE WA-5-PL

 

East Spar to Varanus Island Pipeline Route Map

 

Overview

The Offshore Petroleum and Greenhouse Gas Storage Act 2006 was enacted to provide a regulatory framework for the exploration, development, and production of offshore petroleum and greenhouse gas storage within Australia's jurisdiction. This Act aims to balance the exploitation of offshore resources with environmental protection and safety, ensuring that activities are conducted in a manner that minimises risks to human health, safety, and the environment. The Act was introduced to address the need for a comprehensive legal structure that governs offshore petroleum operations and greenhouse gas storage, promoting sustainable development while protecting Australia's marine environment. The Act is administered by the Commonwealth of Australia, with the National Offshore Petroleum Titles Administrator serving as the key regulatory body. The policy objective of the Act is to facilitate the efficient and responsible use of offshore resources while safeguarding the environment and ensuring public safety. This legislation empowers the Commonwealth-Western Australia Offshore Petroleum Joint Authority to make variations to pipeline licences, as demonstrated in the variation of Pipeline Licence WA-5-PL. This specific variation, made by Joanne Jennifer Bell, the Delegate of the National Offshore Petroleum Titles Administrator, involves modifying the pipeline route and certain design specifications to align with updated operational requirements. The changes reflect adjustments in the pipeline's path, design parameters, and operational details, ensuring that the pipeline continues to meet safety and regulatory standards. These modifications are essential for the safe and effective operation of the pipeline, underscoring the Act's role in maintaining stringent controls over offshore petroleum activities.

Scope and Application

The Offshore Petroleum and Greenhouse Gas Storage Act 2006 applies to the regulation of offshore petroleum activities, including the licensing of pipeline infrastructure, within the Commonwealth and state waters of Australia. This legislation facilitates the exploration, development, and production of offshore petroleum resources, as well as the storage of greenhouse gases in geological formations offshore. The Act applies to entities such as corporations and individuals involved in offshore petroleum operations, including the installation and operation of pipelines. The geographic reach of the Act encompasses federal waters, state waters, and the Australian Exclusive Economic Zone, ensuring comprehensive regulation across these areas. The Act provides for variations to existing pipeline licences, such as the variation of Pipeline Licence WA-5-PL detailed in the instrument, which specifies changes to the pipeline route, design specifications, and operational parameters. The variation extends to the geographic scope defined by the new coordinates and the specific exclusions and modifications to the pipeline's design and operational conditions. This variation, which takes effect upon publication in the Commonwealth Government Gazette, is made under the authority granted by the Offshore Petroleum and Greenhouse Gas Storage Act 2006.

Key Provisions

The key provisions of the Offshore Petroleum and Greenhouse Gas Storage Act 2006, as amended by the variation of Pipeline Licence WA-5-PL, primarily involve modifications to the pipeline route and specifications outlined in the First and Second Schedules of the Licence. Specifically, section 226 of the Act allows for the variation of a pipeline licence, and this variation modifies the pipeline route to commence at the boundary of Pipeline Licence WA-21-PL and WA-5-PL, at the tie-in flange, and to terminate at the boundary of WA-5-PL and TPL-12 (sections 226(1)(a) and (b)). The changes detail the new coordinates and feature points along the pipeline's route, replacing previous descriptions with updated information. The obligations imposed by this variation require the holder of the pipeline licence to adhere to the new specifications and route as described in the amended First and Second Schedules. This includes ensuring that the pipeline's construction and operation comply with the updated design parameters, such as the type of substances to be conveyed, material specifications for the pipeline tie-in spools, and the exclusion of certain subsea elements. Additionally, the pipeline licence holder must ensure that any new installations, such as the ES PLET with a diverless connector, are implemented as specified. Breach of the obligations set out in the amended licence can result in civil or criminal consequences. Under section 708 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006, any person who contravenes a provision of a pipeline licence can be subject to penalties. For corporations, the maximum penalty is $1.65 million, while for individuals, the maximum penalty is $330,000. Additionally, ongoing non-compliance may lead to the suspension or revocation of the pipeline licence, further compounding the legal and operational repercussions for the licence holder.

Legal classification tags

Area of Law
Environmental Law
Energy Law
Instrument
Gazette Notice
Concepts
Reporting & Disclosure Obligations
Regulatory Standards
Enforcement Powers

Interactions

Authorises