Variation of Pipeline Licence WA-5-PL

Administered by Department of Industry, Science and Resources

Legislation au C2017G01071 In force Gazette

Legislation content

 

 

COMMONWEALTH OF AUSTRALIA

 

Section 226, 264 and 708

Offshore Petroleum and Greenhouse Gas Storage Act 2006

 

 

VARIATION OF PIPELINE LICENCE WA-5-PL

(EAST SPAR TO VARANUS ISLAND)

 

I, GRAEME ALBERT WATERS, the National Offshore Petroleum Titles Administrator,
on behalf of the Commonwealth–Western Australia Offshore Petroleum Joint Authority hereby
vary Pipeline Licence WA-5-PL, dated 19 March 1996 (the Licence) as set out below.

 

 

  1. The text of the Licence on Page 1 is varied by deleting the words:

 

(hereinafter for the purpose of this licence only, collectively referred to as "the  licensee"), for a term of twenty one years from 19th March 1996 to 18th March 2017 a licence to construct and operate a pipeline for the conveyance of petroleum along the route described in the First Schedule hereto

 

The licence is subject to the provisions of the Act, the regulations from time to time made thereunder and all directions given by the Designated Authority under the Act.

 

The pipeline shall be constructed and operated in accordance with the specifications and conditions set out in the Second Schedule hereto.”

 

and replacing with:

 

a pipeline licence, in the offshore area of Western Australia, subject to:

 

a)  the conditions set out in this licence;

b)  the provisions of the Act; and

c)  the provisions of the Regulations;

 

to construct and operate a pipeline for the conveyance of petroleum, of the design, construction, size and capacity specified herein, along the route specified herein, in relation to the seabed specified herein, and to construct and operate pumping stations, tank stations and valve stations specified in the positions herein, to have effect from and including 19 March 1996.

 

Reference in this document to a “pipeline” or a “flowline” are taken to refer to a pipe, a flowline or a system of pipes.

 

The licensee shall at all times comply with the provisions of the Act and Regulations (as amended from time to time).

 

 

2.        The ‘INTERPRETATION’ on Page 1 of the Licence is varied by deleting the words:

 

In this instrument, 'the Act" means the Act under which this instrument is made and includes any Act with which that Act is incorporated and words used in this instrument unless inconsistent with the context or subject matter have the same respective meanings as in the Act.

 

In this instrument, "the Director" means the Director Petroleum Operations Division of the Western Australian Department of Minerals and Energy.

 

and substituting under the heading ‘INTERPRETATION’ the following:

 

In this document:

 (a) “the Act” means the Offshore Petroleum and Greenhouse Gas Storage Act 2006, and includes any Act with which that Act is incorporated, and words used in this document have the same respective meanings as in the Act; and

(b) “the Regulations” means regulations made under the Act;

 

 

3.        The First Schedule of the Licence is varied by deleting the words:

 

“The route of the pipeline shall be from and including the pipeline end manifold (PLEM) at or about 7707 l 37mN, 289979mE to the outer limit of the territorial sea boundary at or about 7714 168.3mN, 329966.2mE along a line no point of which shall be more than 125 metres from the proposed pipeline route shown in the drawing attached to this Licence as Annexure 'A'. .  The coordinates given above are relative to UTM zone 50, with Central Meridian 117 deg E, and AGD 1984.

 

  Coordinates

The Geocentric Datum of Australia

(GDA94) coordinate system was adopted

for WA on 18th Dec 2000.

 

AGD pipeline data was

transformed to GDA utilizing the WA NTv2

grid file”

 

and replacing with:

 

The route of the pipeline shall be as described in the table below, from and including the boundary of Pipeline Licence WA-21-PL and WA-5-PL at the western end of the East Spar manifold at or about 7,707,290.78mN, 290,101.15mE to the pipeline licence boundary of TPL-12 at or about 7,714,306.54mN, 330,042.88mE along a line no point of which shall be more than 125 metres from the proposed pipeline route as shown in the drawing attached to the Licence as Annexure ‘A’.  The coordinates given above are relative to UTM zone 50, with Central Meridian 117 deg E based on Geodetic Datum of Australia (GDA94).

 

 

 

 

Feature ID

Feature Name

Kilometre Point

UTM Zone

Easting (mE)

Northing (mN)

1 (start)

Boundary of WA21PL and WA5PL

0

Zone 50

290,101.15

7,707,290.78

2

East Spar Manifold Tiein Flange (Connection to

Z-Spool Flange)

0.02

Zone 50

290,117.00

7,707,292.00

3

14” East Spar Pipeline Flange (Connection to ZSpool Flange)

0.05

Zone 50

290,128.92

7,707,316.25

4

Intersection Point (IP) 1

23.0

Zone 50

312,897.64

7,710,670.05

5

IP 2

26.2

Zone 50

315,961.70

7,711,378.97

6

IP 3

30.7

Zone 50

320,430.55

7,712,179.87

7 (end)

Boundary of WA5PL and TPL12

40.6

Zone 50

330,034.86

7,714,304.73

 

 

4.        The Second Schedule Part 1 Specifications of the Licence is varied by:

 

a)      deleting from Section (A) Design subsection (i) the words:

 

“(i) Except as otherwise specified in this Schedule the pipeline shall be designed, constructed, tested and operated in accordance with the Australian Standard 2885 :SAA Gas and Liquid Petroleum Pipelines”

 

b)     deleting from Section (A) Design subsection (ii) the following:

 

“(ii)”

 

c)      deleting from Section (A) Design subsection (a) the words:

 

“Length of pipeline (km):  41 (KP0-KP41)”

 

And replacing with:

 

“Length of pipeline (km):  40.6 (KP0-KP40.6)”

 

d)     deleting from Section (A) Design subsection (g) the words:

 

Maximum operating pressure (MPa):  18

 

And replacing with:

 

Maximum allowable operating pressure (MPa):  20

 

e)      deleting from Section (A) Design subsection (n) the words:

 

Maximum inlet temperature (oC):  69

 

And replacing with:

 

Maximum design temperature (oC):  67 (manifold), 66 (subsea pipeline)

 

f)       deleting from Section (A) Design subsection (o) the words:

 

Minimum operating temperature (oC): 16”

 

And replacing with:

 

Minimum design temperature (oC):  0

 

g)     At the end of Section A inserting the following:

 

 

 

 

 

y)

General plans and descriptions of pump stations, tank stations or valve stations and their equipment

Subsea:
Pipeline licence includes East Spar Manifold. All manifold piping and valves manufactured from corrosion resistant alloy (duplex) suitable for the produced fluids.
Manifold piping sized to match the pipeline and designed in accordance with API 6A. Piping and valves are interconnected by means of flanges or hubs/clamps.
Support structure designed in accordance with API RP 2A. Free standing and supported by mudmats.

LastOff Valve Replacement Spool (Replacing Valve LOV2010)
14” Linepipe (355.6 mm OD, 1276mm Length, 15.9 mm WT)
Material:  API5LX65 Test Pressure 38MPa

Onshore:
Pipeline provided with pipeline isolation valve and emergency shutdown valves.

 

z)

East Spar Manifold / Pipeline Tiein Spool

14” Line pipe (355.6 mm OD, 37.2m
Length, 15.9 mm WT)
Material:  API5LX65
Test Pressure: 25MPa

 

aa)

Generals plans and description of pigging facilities

No permanent facilities installed.

Temporary subsea pig launch and onshore receipt facilities fabricated as required.

 

h)     deleting from Section (B) Pressure Test

 

i)       deleting from Section (C) Welding Procedures and Welders’ Qualification Tests

 

j)       deleting from Section (D) Coating Systems tests

 

 

5.        The Second Schedule Part 2 Conditions of the Licence is varied by:

 

a)      deleting all of the Sections (A) to (Q) with the exception of Sections: 

 

“(H) Pipeline Route

(I) Seabed Survey”

 

b)     amending the numbering of Section (H) Pipeline Route to be:

 

“(A) Pipeline Route”

 

c)      amending the numbering of Section (I) Seabed Survey to be:

 

“(B) Seabed Survey”

 

6.        The WA-5-PL Petroleum Pipeline Route Map at ‘Annexure A’ on page 11 of the Licence is deleted and replaced with the map at Annexure A of this instrument.

 

 

The variation takes effect on the day on which a notice of the variation is published in the Commonwealth Government Gazette.

 

Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006
of the Commonwealth of Australia

 

 

GRAEME ALBERT WATERS

TITLES ADMINISTRATOR

ON BEHALF OF THE COMMONWEALTH–WESTERN AUSTRALIA
OFFSHORE PETROLEUM JOINT AUTHORITY

 


Annexure A

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.